Featured in Domain Arrivals · 2026-08-13
The €450 Record: Killardry Bridge
A document-led investigation into a €450 parapet repair scheduled for Killardry Bridge and later recorded as undone.
Why it surfacedThe site builds a clear chronology from inspection reports, an internal-review decision, public accounts, and a forensic road inspection. Its central contrast is stark: two repairs scheduled for 2017, alongside claims that the work was never carried out and that warning signs were absent before a vehicle entered the River Aherlow.
Continue into the edition
Thirty Patents for the Grave
August 13’s newborn domains include 30 safety-coffin patents, lost notices for false teeth and a box of hair, short films playing in 100 Tokyo taxis, and a Queensland river view arranged gauge by gauge downstream.
This is one of 1,000 discoveries in the 2026-08-13 Domain Arrivals issue.