Observed arrival · 2026-08-28
FieldTicket: the construction extra-work ticket for the moment after “go ahead”
A phone-based tool for commercial contractors to write time-and-materials tickets or change orders, attach evidence, calculate totals, and collect signatures before leaving the job.
Field notes
The workflow is organized around the brief interval between a superintendent’s verbal instruction and the contractor leaving the site. The page describes dictation, saved labor rates, quick-added materials, photos, markup, tax, and an on-screen signature with signer name, title, date, and time. Its sample Riverside Medical Office Building log shows six tickets, five signed and one unsigned, with $14,382.50 in unbilled extras.
Observed signals
Read the marks
Editorial observations of this landing page, not a rating.
One card from the complete issue