Skip to the card

Card 981 of 10002026-08-28 issue

Observed arrival · 2026-08-28

WTCPUA Water Reliability: A Resident Fact Sheet

wtcwaterfacts.com Observed source
Editorial interest 84/100 Selection signal · not a rating of the site

A resident-built investigation into recurring boil-water notices, low-tank emergencies, and capacity constraints in West Travis County’s public water system.

Landing page captured for the 2026-08-28 issue.

Field notes

The fact sheet frames repeated outages as a treatment-and-pumping constraint rather than a shortage of raw lake water. It identifies the Uplands plant’s stated 20-million-gallon-per-day ceiling, a proposed 33 MGD expansion, and a December 2027 construction-completion date attributed to a July 2026 engineer’s report. Its structure separates board-record quotations, dates, overnight tank information, water-quality material, source links, and template letters for contacting representatives.

Observed signals

Read the marks

Editorial observations of this landing page, not a rating.

○OpenPublic substance visible
✦PrettyNotable craft visible
●ProPolished or operationally mature
◎NicheUnusually specific use
◉HumanPersonal, local, civic, or handmade

One card from the complete issue

Porion Gets More Tolerance

315,344 arrived 1,000 judged 1000 catalogued Enter the complete issue
wtcwaterfacts.com

Landing page observed 2026-08-28. The live site may have changed.