Skip to the card

Card 981 of 10002026-08-28 issue

Observed arrival · 2026-08-28

WTCPUA Water Reliability: A Resident Fact Sheet

wtcwaterfacts.com Observed source
Editorial interest 84/100 Selection signal · not a rating of the site

A resident-built investigation into recurring boil-water notices, low-tank emergencies, and capacity constraints in West Travis County’s public water system.

Landing page captured for the 2026-08-28 issue.

Field notes

The fact sheet frames repeated outages as a treatment-and-pumping constraint rather than a shortage of raw lake water. It identifies the Uplands plant’s stated 20-million-gallon-per-day ceiling, a proposed 33 MGD expansion, and a December 2027 construction-completion date attributed to a July 2026 engineer’s report. Its structure separates board-record quotations, dates, overnight tank information, water-quality material, source links, and template letters for contacting representatives.

Observed signals

Read the marks

Editorial observations of this landing page, not a rating.

OpenPublic substance visible
PrettyNotable craft visible
ProPolished or operationally mature
NicheUnusually specific use
HumanPersonal, local, civic, or handmade

One card from the complete issue

Porion Gets More Tolerance

315,344 arrived 1,000 judged 1000 catalogued Enter the complete issue
wtcwaterfacts.com

Landing page observed 2026-08-28. The live site may have changed.