Skip to the card

Card 652 of 9992026-09-03 issue

Observed arrival · 2026-09-03

RSV Power Flow Simulator — SARG Failure Analysis

powerflowsim.app Observed source
Editorial interest 86/100 Selection signal · not a rating of the site

An interactive DC-grid simulator models how an offshore vessel’s power system responds when one of its three switchboard sections fails.

Landing page captured for the 2026-09-03 issue.

Field notes

The page models a three-section 1050 VDC vessel distribution system with selectable intact and single-section-loss conditions. Its balance view assigns loads across five 1,512 ekW gensets, two 2,508 kWh battery strings, DC switchboards, converters, and 480 V transformers. In the displayed SARG-C failure case, the page reports 5,914 kW of demand, 1,378 kW of battery boost, and 76 minutes until the reserve state of charge is reached; the model also accounts for crane feeder asymmetry and ROV/LARS transfers.

Observed signals

Read the marks

Editorial observations of this landing page, not a rating.

○OpenPublic substance visible
✦PrettyNotable craft visible
●ProPolished or operationally mature
◎NicheUnusually specific use

One card from the complete issue

Where the Dreams Land

383,329 arrived 1,000 judged 999 catalogued Enter the complete issue
powerflowsim.app

Landing page observed 2026-09-03. The live site may have changed.