RSV Power Flow Simulator — SARG Failure Analysis

powerflowsim.app Observed source
Editorial interest 86/100 Selection signal · not a rating of the site

An interactive DC-grid simulator models how an offshore vessel’s power system responds when one of its three switchboard sections fails.

Landing page captured for the 2026-09-03 issue.

Field notes

The page models a three-section 1050 VDC vessel distribution system with selectable intact and single-section-loss conditions. Its balance view assigns loads across five 1,512 ekW gensets, two 2,508 kWh battery strings, DC switchboards, converters, and 480 V transformers. In the displayed SARG-C failure case, the page reports 5,914 kW of demand, 1,378 kW of battery boost, and 76 minutes until the reserve state of charge is reached; the model also accounts for crane feeder asymmetry and ROV/LARS transfers.

Observed signals

Read the marks

Editorial observations of this landing page, not a rating.

OpenPublic substance visible
PrettyNotable craft visible
ProPolished or operationally mature
NicheUnusually specific use

One card from the complete issue

Where the Dreams Land

383,329 arrived 1,000 judged 999 catalogued Enter the complete issue
powerflowsim.app

Landing page observed 2026-09-03. The live site may have changed.