Loadline, an interconnection execution file for big-load projects
A private-beta workflow that tracks large-load interconnection from intake through commercial operation in ERCOT and PJM.
○Open
⊠Login
$Paid
†Ads
✦Pretty
●Pro
◎Niche
◉Human
⚑Risk
ƒJS
Field notes
The page models interconnection as a sequence of ten milestones, from queue completion and screening through SIS, facilities, permits, construction, and COD. Its Westfork sample concerns a 240 MW ERCOT campus and displays a June 30, 2027 studies deadline alongside a June 30, 2028 COD target. Permit extracts can be flagged for PE review, and the sample audit pack records blocked or review-dependent items.
Observed signals
Read the marks
Editorial observations of this landing page, not a rating.
○OpenPublic substance visible
⊠LoginAccess appeared gated
✦PrettyNotable craft visible
●ProPolished or operationally mature
◎NicheUnusually specific use
ƒJavaScriptBrowser-side code central
One card from the complete issue