Skip to the card

Card 492 of 9982026-09-08 issue

Observed arrival · 2026-09-08

Livingston Minerals and the furnace that skips the giant grid connection

livingstonminerals.com Observed source
Editorial interest 80/100 Selection signal · not a rating of the site

An industrial technology company developing a two-stage shaft-furnace process for producing high-carbon ferromanganese without a submerged-arc furnace.

Landing page captured for the 2026-09-08 issue.

Field notes

The proposed furnace divides the work between a gas-heated shaft for pre-reduction and a coke-bed furnace for final smelting, allowing the rising furnace gas to serve both stages. The page contrasts this arrangement with a 15–30 MVA submerged-arc installation and says detailed engineering indicates capital costs around one-third to one-half of the equivalent installation before grid works. It also identifies Malaysia and South Africa as company locations and describes four pilot campaigns.

Observed signals

Read the marks

Editorial observations of this landing page, not a rating.

OpenPublic substance visible
$PaidCommerce or pricing visible
PrettyNotable craft visible
ProPolished or operationally mature
NicheUnusually specific use

One card from the complete issue

1985 at 160× Speed

370,686 arrived 1,000 judged 998 catalogued Enter the complete issue
livingstonminerals.com

Landing page observed 2026-09-08. The live site may have changed.