Observed arrival · 2026-09-17
Chape Vive Treats the Floor as a Technical Cross-Section
A Lyon workshop for lime, anhydrite, and traditional floor screeds, with an on-page estimator for material volume, mass, and drying time.
Field notes
The homepage models a floor as a layered assembly rather than reducing the job to material quantity: finish, screed, insulation or interposition, and support. Its estimator accepts binder type, area, and thickness, then returns indicative volume, mass, density, and drying time; the example uses 42 m² at 50 mm and produces 2.10 m³, 4,410 kg, and about 35 days. The page explicitly distinguishes these workshop estimates from a contractual quantity survey.
Observed signals
Read the marks
Editorial observations of this landing page, not a rating.
One card from the complete issue