Skip to the card

Card 633 of 9902026-09-17 issue

Observed arrival · 2026-09-17

PermitWait: Chicago's Permit Clock

permitwait.com Observed source
Editorial interest 86/100 Selection signal · not a rating of the site

A public-data tool measuring Chicago building-permit processing times by community area, ZIP code, and permit type.

Landing page captured for the 2026-09-17 issue.

Field notes

The tool derives elapsed calendar days from the City's PROCESSING_TIME field for permits that reached issuance, then presents results by geography and permit route. Its reports expose the long tail with 75th- and 90th-percentile figures rather than relying on averages alone. The homepage covers 196,519 issued permits from 2021–2026 and distinguishes fast routes such as Easy Permit from slower categories such as Renovation & Alteration and New Construction.

Observed signals

Read the marks

Editorial observations of this landing page, not a rating.

OpenPublic substance visible
PrettyNotable craft visible
ProPolished or operationally mature
NicheUnusually specific use
HumanPersonal, local, civic, or handmade

One card from the complete issue

Restaurant City, Back on Speaking Terms

345,627 arrived 1,000 judged 990 catalogued Enter the complete issue
permitwait.com

Landing page observed 2026-09-17. The live site may have changed.