Observed arrival · 2026-09-18
Jam Serah and the excavator-hour dispute
A founder-owned Indonesian project focused on recording heavy-equipment meter readings jointly at handover and return.
○Open
⊠Login
$Paid
†Ads
✦Pretty
●Pro
◎Niche
◉Human
⚑Risk
ƒJS
- For
- Heavy-equipment owners and hirers
- Worth noticing
- The example machine records 1,406 hours between delivery and return, with the disputed allocation beginning during an eight-hour transport and positioning gap.
Field notes
The site uses a worked excavator example to show how billing disputes accumulate between yard, transport, site, and return readings. It distinguishes an eight-hour gap between delivery and site arrival from the longer period of operator-reported readings, then frames the proposed record as an agreement between the parties rather than a shared industry database. No dashboard or live recording workflow is visible on the homepage.
Observed signals
Read the marks
Editorial observations of this landing page, not a rating.
○OpenPublic substance visible
✦PrettyNotable craft visible
●ProPolished or operationally mature
◎NicheUnusually specific use
One card from the complete issue