Observed arrival · 2026-09-28
GridSync: a comparison desk for utility construction plans
GridSync compares utilities’ public construction plans and ranks potential overlaps in location and timing.
○Open
⊠Login
$Paid
†Ads
✦Pretty
●Pro
◎Niche
◉Human
⚑Risk
ƒJS
- For
- Utility planners comparing public construction plans
- Worth noticing
- Its frozen v1 rubric uses a closest-point gate of ≤40 km and four deterministic scoring points.
Field notes
GridSync lists 19 utilities and displays 300 projects, then ranks plan pairs against a frozen v1 rubric. Visible controls narrow results by region and utility, require actual timeline overlap, isolate cross-state pairs, or include sister utilities. The scoring display names a closest-point threshold of ≤40 km and four deterministic points; an “Add public plan” control is also present.
Observed signals
Read the marks
Editorial observations of this landing page, not a rating.
○OpenPublic substance visible
●ProPolished or operationally mature
◎NicheUnusually specific use
◉HumanPersonal, local, civic, or handmade
One card from the complete issue