Observed arrival · 2026-10-11
Point of Grid maps Italian data-center sites against the power network
An Italian site-selection service screens warehouses and industrial plots by proximity to high-voltage lines, planned substations, fiber, and selected hazard constraints.
○Open
⊠Login
$Paid
†Ads
✦Pretty
●Pro
◎Niche
◉Human
⚑Risk
ƒJS
- For
- Data-center developers assessing Italian sites
- Worth noticing
- The selection excludes medium- or high-risk flood areas and high landslide-risk sites; the scores still require technical validation.
Field notes
The site describes a score built from network distance, property size, fiber, hazard exposure, and sale channel. Its October 10, 2026 selection reports 72 sites in Lombardy and 33 in Lazio; the listed property thresholds are 5,000 m² for warehouses and one hectare for industrial plots. Public examples omit addresses, which the site says are shared after an expression of interest.
Observed signals
Read the marks
Editorial observations of this landing page, not a rating.
○OpenPublic substance visible
◎NicheUnusually specific use
One card from the complete issue