Observed arrival · 2026-10-20
A community guide to the proposed Golden Pacific Powerlink
A campaign hub about SDG&E’s proposed 500 kV line, with route facts, project history, coverage and steps for nearby residents to prepare for the CPUC process.
- For
- Communities along the proposed route
- Worth noticing
- It says no formal CPUC comment period is open and distinguishes preparatory steps from formal comments.
Field notes
The page distinguishes preparation from formal participation: it directs readers to the CPUC mailing list, docket subscriptions after filing and the Public Advisor. Its project figures preserve disagreements among cited sources, including a 135–150-mile route range and cost estimates with different scopes. The page quotes a 2008 CPUC decision and describes earlier fire findings. It is marked as a coalition-partner preview with a working title, and its framing is openly campaign-oriented.
Observed signals
Read the marks
Editorial observations of this landing page, not a rating.
One card from the complete issue