A community guide to the proposed Golden Pacific Powerlink

stopgoldenpacific.org Visit website
Editorial interest 78/100 Selection signal · not a rating of the site

A campaign hub about SDG&E’s proposed 500 kV line, with route facts, project history, coverage and steps for nearby residents to prepare for the CPUC process.

Landing page captured for the 2026-10-20 issue.
For
Communities along the proposed route
Worth noticing
It says no formal CPUC comment period is open and distinguishes preparatory steps from formal comments.

Field notes

The page distinguishes preparation from formal participation: it directs readers to the CPUC mailing list, docket subscriptions after filing and the Public Advisor. Its project figures preserve disagreements among cited sources, including a 135–150-mile route range and cost estimates with different scopes. The page quotes a 2008 CPUC decision and describes earlier fire findings. It is marked as a coalition-partner preview with a working title, and its framing is openly campaign-oriented.

Observed signals

Read the marks

Editorial observations of this landing page, not a rating.

○OpenPublic substance visible
✦PrettyNotable craft visible
●ProPolished or operationally mature
◎NicheUnusually specific use
◉HumanPersonal, local, civic, or handmade
ƒJavaScriptBrowser-side code central

One card from the complete issue

Cicada Prime

344,979 arrived 1,000 judged 983 catalogued Enter the complete issue
stopgoldenpacific.org

Landing page observed 2026-10-20. The live site may have changed.