Observed arrival · 2026-10-21
Rack Radar’s Texas data-center tracker
A source-linked tracker and research guide to US data-center development, beginning with Texas.
○Open
⊠Login
$Paid
†Ads
✦Pretty
●Pro
◎Niche
◉Human
⚑Risk
ƒJS
- For
- Researchers tracking Texas data-center development
- Worth noticing
- Profiles distinguish sourced announcements from verified milestones; several listed campus statuses remain explicitly unverified.
Field notes
The tracker presents project names, regions, status and confidence notes, with links to profiles; the homepage sample includes five Texas projects. Its entries preserve evidence gaps: CyrusOne campus milestones are unverified, while the Abilene listing reports two buildings operating and six under construction as of June 9, 2026, with later progress unverified. The guides also address power, water, permitting, and the distinction between planned capacity and measured impact.
Observed signals
Read the marks
Editorial observations of this landing page, not a rating.
○OpenPublic substance visible
✦PrettyNotable craft visible
●ProPolished or operationally mature
◎NicheUnusually specific use
◉HumanPersonal, local, civic, or handmade
One card from the complete issue