Skip to the card

2026-10-25 issue

Observed arrival · 2026-10-25

KFUPM ASTROLAB’s 10,000-foot rocket plan

astro-lab.cloud Visit website
Editorial interest 82/100 Selection signal · not a rating of the site

A Saudi university rocketry team documents its ASTRO-2 design, planned test flights, and engineering blog for IREC 2027.

Landing page captured for the 2026-10-25 issue.
For
KFUPM students and student rocketry followers
Worth noticing
Its 3.19-metre airframe carries a non-separating 3U payload and dual recovery avionics.

Field notes

The page breaks the vehicle into named sections, from the fiberglass nose cone and tracker to the carbon-tipped fins and recovery hardware. It lists separate altimeters on separate batteries, and describes the first planned test as a systems flight using a team-built candy motor. The schedule then calls for an apogee flight in Texas to calibrate the drag model and ballast table before the final launch data package.

Observed signals

Read the marks

Editorial observations of this landing page, not a rating.

○OpenPublic substance visible
✦PrettyNotable craft visible
●ProPolished or operationally mature
◎NicheUnusually specific use
◉HumanPersonal, local, civic, or handmade

One card from the complete issue

Certified Dino Tamer

512,544 arrived 1,000 judged 976 catalogued Enter the complete issue
astro-lab.cloud

Landing page observed 2026-10-25. The live site may have changed.