Skip to the card

2026-10-25 issue

Observed arrival · 2026-10-25

EasyGrid’s fictional substation-siting simulation

easygrid.work Visit website
Editorial interest 75/100 Selection signal · not a rating of the site

An interactive demo walks through choosing infrastructure sites, routing a connection, negotiating fictional land compensation, and preparing agreement drafts.

Landing page captured for the 2026-10-25 issue.
For
People exploring infrastructure siting and land negotiations
Worth noticing
The demo uses 24 parcels and says its demo scale is 25 metres per tile; cost figures are estimates, not an appraisal.

Field notes

The workflow separates route estimation from parcel negotiation, with controls for moving project sites and analyzing affected parcels. The page describes costs in estimated USD, uses a 25-metre-per-tile demo scale, and distinguishes monthly rent from compensation. Agreement previews are marked as drafts, and the interface says both parties must sign before payment; its demo notices also say the scenario is fictional and no payment is sent.

Observed signals

Read the marks

Editorial observations of this landing page, not a rating.

○OpenPublic substance visible
✦PrettyNotable craft visible
◎NicheUnusually specific use

One card from the complete issue

Certified Dino Tamer

512,544 arrived 1,000 judged 976 catalogued Enter the complete issue
easygrid.work

Landing page observed 2026-10-25. The live site may have changed.