Skip to the card

2026-10-30 issue

Observed arrival · 2026-10-30

Cleared to Build: plan-check answers

clearedtobuild.com Visit website
Editorial interest 77/100 Selection signal · not a rating of the site

A permit-review service turns a city’s plan-check letter into draft responses and a sheet-by-sheet task list.

Landing page captured for the 2026-10-30 issue.
For
Builders, architects, and drafters answering permit corrections
Worth noticing
The sample flags an energy-form correction for a consultant rather than drafting an answer it cannot support.

Field notes

The sample is explicitly a generic, made-up detached-ADU permit: four comments cover planning, energy, structural, and completeness, with one item routed to an energy consultant. Each draft response is paired with a sheet-specific change list, keeping the reviewer’s comment and proposed action together. The operator says plans are optional and that it does not edit drawings; the submitter signs and resubmits.

Observed signals

Read the marks

Editorial observations of this landing page, not a rating.

○OpenPublic substance visible
$PaidCommerce or pricing visible
✦PrettyNotable craft visible
◎NicheUnusually specific use

One card from the complete issue

An Heir Still Staked

311,135 arrived 1,000 judged 977 catalogued Enter the complete issue
clearedtobuild.com

Landing page observed 2026-10-30. The live site may have changed.