Observed arrival · 2026-11-01
TCC: Primavera P6 to A3 time-chainage charts
TCC is an offline Windows program that turns Primavera P6 schedules into time-chainage charts for construction work.
- For
- Construction planners working with Primavera P6 programmes
- Worth noticing
- Its fictional sewer-scheme example places four portions, each with its own chainage zero, on a shared time scale.
Field notes
Users open a P6 Professional database or XER export; TCC reads it read-only and stores location and portion mappings in a separate workspace file. The page's fictional sewer example separates four work areas, including gravity and rising mains, and shows how activities can be plotted against distinct chainage ranges on a common time axis. Listed sheet details include an IFC plan strip, title block, revision information and up to three logos, with PDF, PNG and SVG export formats.
Observed signals
Read the marks
Editorial observations of this landing page, not a rating.
One card from the complete issue