Skip to the card

2026-11-08 issue

Observed arrival · 2026-11-08

Kruntek: one blast, five states

kruntek.com Visit website
Editorial interest 78/100 Selection signal · not a rating of the site

A phone-first planning and reporting tool for blasting work in tunnels and surface sites.

Landing page captured for the 2026-11-08 issue.
For
Blasting crews working in tunnels and surface sites
Worth noticing
Its risk-assessment matrix is 5 × 5 and includes 33 predefined hazards; saved assessments are described as versioned.

Field notes

The workflow connects project and subproject records to each blast, with version history for items such as the blasting plan. The page also describes importing a route to assign an approximate map position, while treating GPS as a separate observation that does not overwrite project coordinates. Stock movements and returned material are recorded with history.

Observed signals

Read the marks

Editorial observations of this landing page, not a rating.

○OpenPublic substance visible
⊠LoginAccess appeared gated
✦PrettyNotable craft visible
●ProPolished or operationally mature
◎NicheUnusually specific use

One card from the complete issue

Meteorite Under Review

339,910 arrived 1,000 judged 981 catalogued Enter the complete issue
kruntek.com

Landing page observed 2026-11-08. The live site may have changed.