Skip to the card

2026-11-08 issue

Observed arrival · 2026-11-08

A county-by-county reality check for home wind

turbinepayback.com Visit website
Editorial interest 84/100 Selection signal · not a rating of the site

TurbinePayback estimates how long a 10 kW home wind turbine would take to pay for itself in each of 3,144 U.S. counties.

Landing page captured for the 2026-11-08 issue.
For
U.S. homeowners weighing a small wind turbine
Worth noticing
Estimates use county-center wind at 30 m, so local terrain and rooftop conditions may differ substantially.

Field notes

The comparison uses wind estimates at 30 meters alongside electricity prices, with a $100,000 installed-cost assumption for a 10 kW turbine. Its county table includes wind speed, estimated annual generation, power price, and payback time; the page also cites a 4.79 m/s median county wind speed. The site cautions that county-center figures may not represent a property, where terrain, trees, and buildings can change the result.

Observed signals

Read the marks

Editorial observations of this landing page, not a rating.

○OpenPublic substance visible
✦PrettyNotable craft visible
●ProPolished or operationally mature
◎NicheUnusually specific use

One card from the complete issue

Meteorite Under Review

339,910 arrived 1,000 judged 981 catalogued Enter the complete issue
turbinepayback.com

Landing page observed 2026-11-08. The live site may have changed.