Observed arrival · 2026-11-10
GIGAWATT: An AI Datacenter Tycoon
A free tycoon game about buying hardware, building and cooling datacenters, then leasing computing capacity to AI labs.
○Open
⊠Login
$Paid
†Ads
✦Pretty
●Pro
◎Niche
◉Human
⚑Risk
ƒJS
- For
- Players curious about datacenter operations and AI infrastructure
- Worth noticing
- The page lists 690+ parts from 100+ vendors and says network cabling can be managed one tagged cable per port.
Field notes
The page describes a campaign running from December 2020 through December 2028, with purchasing, build-out, leasing, maintenance, and financial outcomes resolved over time. Its parts catalog is listed as 690+ components from 100+ vendors, with 70+ ready-to-order system templates; players can design network fabrics manually or let the game auto-design them. The project labels the build alpha and warns that saves may not carry between alphas.
Observed signals
Read the marks
Editorial observations of this landing page, not a rating.
○OpenPublic substance visible
✦PrettyNotable craft visible
●ProPolished or operationally mature
◎NicheUnusually specific use
One card from the complete issue