Skip to the card

2026-11-10 issue

Observed arrival · 2026-11-10

GIGAWATT: An AI Datacenter Tycoon

gigawatt.ing Visit website
Editorial interest 84/100 Selection signal · not a rating of the site

A free tycoon game about buying hardware, building and cooling datacenters, then leasing computing capacity to AI labs.

Landing page captured for the 2026-11-10 issue.
For
Players curious about datacenter operations and AI infrastructure
Worth noticing
The page lists 690+ parts from 100+ vendors and says network cabling can be managed one tagged cable per port.

Field notes

The page describes a campaign running from December 2020 through December 2028, with purchasing, build-out, leasing, maintenance, and financial outcomes resolved over time. Its parts catalog is listed as 690+ components from 100+ vendors, with 70+ ready-to-order system templates; players can design network fabrics manually or let the game auto-design them. The project labels the build alpha and warns that saves may not carry between alphas.

Observed signals

Read the marks

Editorial observations of this landing page, not a rating.

○OpenPublic substance visible
✦PrettyNotable craft visible
●ProPolished or operationally mature
◎NicheUnusually specific use

One card from the complete issue

Detergent Lessons in Sheep Suits

328,969 arrived 1,000 judged 984 catalogued Enter the complete issue
gigawatt.ing

Landing page observed 2026-11-10. The live site may have changed.