Skip to the card

2026-11-12 issue

Observed arrival · 2026-11-12

Center Registry’s map of the AI data-center buildout

centerregistry.com Visit website
Editorial interest 84/100 Selection signal · not a rating of the site

An interactive registry maps named US AI data-center projects by location, operator, capacity, and development stage.

Landing page captured for the 2026-11-12 issue.
For
Researchers tracking US data-center development
Worth noticing
The map distinguishes energized, under-construction, and planned sites; campus massing is explicitly described as illustrative.

Field notes

Records include operator, location, capacity when disclosed, and stage; the visible list divides projects into 17 energized, 42 under construction, and 2 planned. The site says entries draw on SEC filings, company announcements, and grid operators, and that each record carries a confidence tag; it also notes that campus massing is illustrative. The extracted metadata says 60 sites, while the page reports 61.

Observed signals

Read the marks

Editorial observations of this landing page, not a rating.

○OpenPublic substance visible
⊠LoginAccess appeared gated
✦PrettyNotable craft visible
●ProPolished or operationally mature
◎NicheUnusually specific use

One card from the complete issue

Aerodynamics for Bad Throws

324,736 arrived 1,000 judged 982 catalogued Enter the complete issue
centerregistry.com

Landing page observed 2026-11-12. The live site may have changed.