Observed arrival · 2026-11-12
DCE Express checks tender pricing before submission
A French tool for comparing a construction tender’s DPGF with its CCTP and flagging possible omissions, duplicates, unit errors, totals, and risky clauses.
○Open
⊠Login
$Paid
†Ads
✦Pretty
●Pro
◎Niche
◉Human
⚑Risk
ƒJS
- For
- French construction firms preparing tender bids
- Worth noticing
- The illustrative report cites specific sources, including CCTP page 14 and DPGF cell B17; its figures are explicitly labeled fictitious.
Field notes
The described workflow accepts ZIP, PDF, Excel, and Word dossiers, then presents findings for the user to accept or reject before prices are entered and totals recalculated. The sample includes a €1,000 lot-total discrepancy and references both a CCTP page and a DPGF cell, but the page labels all sample data fictitious. It also says the first standard dossier study requires no bank card.
Observed signals
Read the marks
Editorial observations of this landing page, not a rating.
○OpenPublic substance visible
$PaidCommerce or pricing visible
✦PrettyNotable craft visible
●ProPolished or operationally mature
◎NicheUnusually specific use
One card from the complete issue