Observed arrival · 2026-11-17
GEOATHECMOON: picking a lunar landing date
A Spanish-language planner compares lunar south-pole landing sites by sunlight, Earth visibility, terrain slope, and mission date.
○Open
⊠Login
$Paid
†Ads
✦Pretty
●Pro
◎Niche
◉Human
⚑Risk
ƒJS
- For
- Lunar mission planners comparing south-polar landing sites
- Worth noticing
- For Mons Mouton, the displayed 14-day mission score shifts from 46 to 100 depending on its start date.
Field notes
The site frames its figures around a 2027 UTC analysis period and lists coordinates for each of its six locations. Its comparison separates sunlight, Earth visibility, and slope rather than collapsing them into a single site ranking. The page credits JPL Horizons and LOLA for data, and also names LRO imagery among its sources.
Observed signals
Read the marks
Editorial observations of this landing page, not a rating.
○OpenPublic substance visible
✦PrettyNotable craft visible
●ProPolished or operationally mature
◎NicheUnusually specific use
One card from the complete issue