Skip to the card

2026-11-28 issue

Observed arrival · 2026-11-28

Jones BIM Solutions turns construction schedules into site choreography

jonesbimsolutions.build Visit website
Editorial interest 74/100 Selection signal · not a rating of the site

A Louisiana-based service offers 4D construction sequencing, site logistics planning, BIM coordination, and related modeling and drone work.

Landing page captured for the 2026-11-28 issue.
For
General contractors planning construction work
Worth noticing
The site describes time-aware zones that flag when cranes, gates, or pour areas conflict with scheduled work.

Field notes

The service describes linking a project schedule to a site model, with future work ghosted and late work flagged against a baseline. Its coordination workflow accepts Revit, IFC, or 2D CAD files and says it groups clash findings into prioritized reports. The site also lists field layout verification, 2D-to-3D modeling, renders, and FAA Part 107 drone capture as related services.

Observed signals

Read the marks

Editorial observations of this landing page, not a rating.

○OpenPublic substance visible
$PaidCommerce or pricing visible
✦PrettyNotable craft visible
◎NicheUnusually specific use
◉HumanPersonal, local, civic, or handmade

One card from the complete issue

One Blade in Black

310,211 arrived 1,000 judged 975 catalogued Enter the complete issue
jonesbimsolutions.build

Landing page observed 2026-11-28. The live site may have changed.