Tendido maps Spain’s electricity network

tendido.org Visit website
Editorial interest 83/100 Selection signal · not a rating of the site

An independent map combines Spain’s high-voltage lines, substations and power plants with grid-capacity data and electricity-system figures.

Landing page captured for the 2026-11-28 issue.
For
People checking Spain’s grid and connection capacity
Worth noticing
The CNMC-based capacity section covers 2,897 substations; it reports 75% lack room for generation and 79% for new consumption.

Field notes

Map layers cover transmission lines, substations and plants, with technology filters and facility-level records. The capacity summary uses distribution-company disclosures to the CNMC, while the outage comparison uses MITECO figures averaged across 2019–2021; the page notes that 2021 is the latest year published. Tendido says it is independent and not an official site.

Observed signals

Read the marks

Editorial observations of this landing page, not a rating.

○OpenPublic substance visible
✦PrettyNotable craft visible
●ProPolished or operationally mature
◎NicheUnusually specific use
◉HumanPersonal, local, civic, or handmade
ƒJavaScriptBrowser-side code central

One card from the complete issue

One Blade in Black

310,211 arrived 1,000 judged 975 catalogued Enter the complete issue
tendido.org

Landing page observed 2026-11-28. The live site may have changed.