Observed arrival · 2026-09-12
GridProjeX, the paperwork layer for solar power
A verification system for solar and battery projects moving through utility interconnection, permitting, inspection, and permission to operate.
Field notes
GridProjeX models a solar project as three linked approval tracks rather than one undifferentiated status: utility interconnection and PTO, permit-office progress, and installation work. The page shows records such as UA-2026-0418 and BLD-2026-1001, with milestones that gate later actions. Document values retain their source and verification state, and the demo exposes a 20-versus-30-kWh discrepancy for human resolution. The site says its beta workflow handles 17 values per document and presents homeowner updates without permit-office jargon.
Observed signals
Read the marks
Editorial observations of this landing page, not a rating.
One card from the complete issue