Observed arrival · 2026-09-24
Baseline PCR puts the reviewer on the signature line
Baseline PCR says it turns building-walkthrough photos, notes, and owner documents into an AI-assisted draft property condition report aligned to ASTM E2018-24.
- For
- Engineers and firms preparing property condition reports
- Worth noticing
- Unknown quantities are marked “ETP” until an engineer supplies them; the site says reports require reviewer approval before issuance.
Field notes
The described workflow keeps uploaded photos, notes, and owner records attached to report evidence classified as observed, reported, or documented. The sample materials show cost-table arithmetic and a basis sheet, while the page says unmeasured quantities remain marked “ETP” for the engineer to supply. The site presents the sample as a fictional property and says an engineer must approve a report before it is issued.
Observed signals
Read the marks
Editorial observations of this landing page, not a rating.
One card from the complete issue