Observed arrival · 2026-09-30
ATX WIP maps Austin’s construction
An interactive map tracks Austin building permits, major public projects, transit work, trails, parks, and current lane closures.
○Open
⊠Login
$Paid
†Ads
✦Pretty
●Pro
◎Niche
◉Human
⚑Risk
ƒJS
- For
- Austin residents tracking nearby construction and closures
- Worth noticing
- Building heights use permitted floor counts at roughly 3.6 metres per floor; some large or uncounted sites stay flat.
Field notes
Controls shown in the page include layer selection, a 2D toggle, view reset, and a way to copy a link; the map also offers a “Back to today” control. Its description says building shapes scale by permitted floor count, using about 3.6 metres per floor, while large sites and projects without a floor count remain flat. The timeline spans 2020–2034 and labels work as planned, underway, or finished.
Observed signals
Read the marks
Editorial observations of this landing page, not a rating.
○OpenPublic substance visible
◎NicheUnusually specific use
◉HumanPersonal, local, civic, or handmade
One card from the complete issue