Observed arrival · 2026-10-01
Karkhana follows a steel bar through an Indian workshop
Karkhana presents an ERP for Indian workshops, tracing materials from purchase and weighing through production, costing, and GST invoicing.
○Open
⊠Login
$Paid
†Ads
✦Pretty
●Pro
◎Niche
◉Human
⚑Risk
ƒJS
- For
- Indian workshops managing mixed-unit materials and production
- Worth noticing
- The illustrated workflow flags a lot at +0.63% versus usual weight and a job at 5.5% over plan.
Field notes
The illustrated receipt converts a weighbridge total into weight per bar and compares it with a stated usual weight. Later screens connect stock to a rack location, show paint loss during filling, and attribute a sample job’s cost overrun to heavier material and extra lathe time. The homepage offers demo booking and contact channels, but shows no pricing or sign-in.
Observed signals
Read the marks
Editorial observations of this landing page, not a rating.
○OpenPublic substance visible
✦PrettyNotable craft visible
●ProPolished or operationally mature
◎NicheUnusually specific use
One card from the complete issue