Skip to the card

2026-11-19 issue

Observed arrival · 2026-11-19

DSS CUBE: A Nine-Container AI Data Centre

qcedx.tech Visit website
Editorial interest 77/100 Selection signal · not a rating of the site

A detailed proposal for a factory-built AI data centre designed for Indian sites and data rules.

No snapshot available Observed 2026-11-19
Landing page captured for the 2026-11-19 issue.
For
Indian public-sector AI and data-centre planners
Worth noticing
The page specifies native 50 Hz power, IS 3043/1893/875 targets, and a CEIG and fire-NOC pathway.

Field notes

The proposed layout places the eight GB300 NVL72 racks across Containers 2 and 3, with standard power, coolant, and data interconnects joining the modules. It describes N+1 power, 2+1 cooling, and operation in 45–50 °C summers. These are proposal specifications rather than demonstrated operating results; the page itself says its cited figures should be verified before external use.

Observed signals

Read the marks

Editorial observations of this landing page, not a rating.

○OpenPublic substance visible
✦PrettyNotable craft visible
◎NicheUnusually specific use

One card from the complete issue

Syntax in Assamese

364,042 arrived 1,000 judged 986 catalogued Enter the complete issue
qcedx.tech

Landing page observed 2026-11-19. The live site may have changed.