Observed arrival · 2026-11-21
Smokey Brae Delays
A sourced timeline tracks delays to Edinburgh’s Smokey Brae walking and cycling scheme, from its 2022 consultation through November 2026.
○Open
⊠Login
$Paid
†Ads
✦Pretty
●Pro
◎Niche
◉Human
⚑Risk
ƒJS
- For
- Edinburgh residents tracking local active-travel delivery
- Worth noticing
- It distinguishes documented events from inferred causes, and places each promise at the date it was made.
Field notes
The chronology places promises at the dates they were made, rather than treating undated council project-page text as a dated commitment. It records the 2022 consultation split, additions to the scheme’s scope, a move from Technical Design back to Developed Design, and a fire-station decision that the page says could alter the design. The compiler says inferred causes are marked separately.
Observed signals
Read the marks
Editorial observations of this landing page, not a rating.
○OpenPublic substance visible
✦PrettyNotable craft visible
●ProPolished or operationally mature
◎NicheUnusually specific use
◉HumanPersonal, local, civic, or handmade
One card from the complete issue