Observed arrival · 2026-11-21
Iowa Lead Tracker models a planned blast
An unofficial map estimates how lead from a planned detonation at the Iowa Army Ammunition Plant could travel and settle, using weather forecasts and several assumptions about how much lead becomes airborne.
- For
- Iowans following the planned ammunition-plant detonation
- Worth noticing
- The model compares four airborne-lead assumptions—7%, 20%, 55%, and 100%—and publishes its inputs and saved weather forecasts.
Field notes
The map offers time controls around the planned detonation and lets visitors switch between U.S. and metric units. Its scenarios use airborne-lead shares of 7%, 20%, 55%, and 100%; the page says the 100% case reflects the assumption used in EPA's official plume maps. The author also estimates how different water-misting setups might affect airborne lead, while noting that the Army had not specified the number of misters or their water output.
Observed signals
Read the marks
Editorial observations of this landing page, not a rating.
One card from the complete issue