Skip to the card

2026-11-26 issue

Observed arrival · 2026-11-26

Wattlas tracks US data-center projects, filing by filing

wattlasdata.com Visit website
Editorial interest 82/100 Selection signal · not a rating of the site

Wattlas presents a tracker of US data-center projects, their development stages, power and grid context, and local opposition.

Landing page captured for the 2026-11-26 issue.
For
Data-center suppliers, site teams, brokers, investors, and lenders
Worth noticing
The homepage lists 1,109 local moratoria and 366 petitions across 47 states, matched to the campuses they touch.

Field notes

The page lays out a project sequence from announcement through zoning, permits, construction, and operation, with each milestone described as linked to its underlying document. It distinguishes filed power figures from estimates based on building size, and says it leaves power blank when neither source is available. Grid context includes substations, transmission lines, gas pipelines, flood zones, and retiring power plants.

Observed signals

Read the marks

Editorial observations of this landing page, not a rating.

○OpenPublic substance visible
⊠LoginAccess appeared gated
$PaidCommerce or pricing visible
✦PrettyNotable craft visible
●ProPolished or operationally mature
◎NicheUnusually specific use
ƒJavaScriptBrowser-side code central

One card from the complete issue

103 Years of Thanksgiving

393,202 arrived 1,000 judged 988 catalogued Enter the complete issue
wattlasdata.com

Landing page observed 2026-11-26. The live site may have changed.