Skip to the card

2026-11-29 issue

Observed arrival · 2026-11-29

Lincoln Trail Mesh plans a text network beyond the towers

lincolntrailmesh.org Visit website
Editorial interest 83/100 Selection signal · not a rating of the site

A community-run MeshCore radio project aims to connect LaRue and Hart counties—and eventually bridge networks along I-65—without relying on cellular service, internet or grid power.

Landing page captured for the 2026-11-29 issue.
For
Residents and repeater operators in LaRue and Hart counties
Worth noticing
Operator guidance calls for MeshCore v1.18 or newer and a two-byte path hash, intended to support corridor growth and paths up to 32 hops.

Field notes

The proposed network uses small radios on high ground to relay messages, with solar panels and batteries intended to keep repeaters independent of grid power. The operator section gives configuration details, including a two-byte path hash and a stated limit of 32 hops. The page reports one repeater up, while its visible status panel currently provides no repeater count.

Observed signals

Read the marks

Editorial observations of this landing page, not a rating.

○OpenPublic substance visible
●ProPolished or operationally mature
◎NicheUnusually specific use
◉HumanPersonal, local, civic, or handmade

One card from the complete issue

Jackrabbit Country

286,081 arrived 1,000 judged 982 catalogued Enter the complete issue
lincolntrailmesh.org

Landing page observed 2026-11-29. The live site may have changed.