Skip to the issue

Issue 2026-08-22997 cards in today’s catalogue

Each day, Domain Arrivals checks hundreds of thousands of newly registered domains and turns the most interesting live sites into a visual card catalogue.

Daily issue ·

A Fortune, 735 Feet Deep

August 22’s newborn domains include a 735-foot rendering of one fortune, 36 summers of family golf transcribed from an address book, a memorial built around a crowded refrigerator, and Formula 1 translated into narration, vibration, and text. The issue begins with the editor’s No. 1 selection, Watch the Gap, Measured in Pixels.

02

The opening shelf

Twenty discoveries, now with a face

Twenty selected projects from today’s catalogue, each shown with the landing page we found and a short explanation of why it stood out.

No. 02 · Personal Pages

Beckerle Best Ball

beckerle-best-ball.online

A meticulously transcribed family golf tournament record spanning thirty-six summers, from 1990 through 2025.

No. 03 · Content & Blogs

The Jug Handle: Important Reporting on Things of Questionable Importance

thejughandle.com

A Morris County, New Jersey humor publication investigating roadside anomalies, suburban mysteries, and other matters no reputable newsroom would pursue.

No. 04 · Oddly Specific

Diva Sherlock — A Detective Game Played on a Fictional Phone

divasherlock.com

A mobile detective game where players search 21 fictional apps, connect the evidence, and solve sixteen mysteries by answering twelve questions per case.

No. 05 · Weird Finds

The Rizzler Files

nobodyhaseversaidyes.lol

A satirical dossier following one impeccably groomed German Shepherd through thirty years of romantic failure, documented by his increasingly mortified entourage.

No. 06 · Weird Finds

The Unfinished, a sketchbook that refuses to finish

theunfinished.xyz

An interactive generative Ethereum art collection built from abandoned drawings that keep moving on the page.

No. 07 · Civic & Public Life

Seats of the World

seatsoftheworld.org

An interactive historical atlas showing who belonged to twenty international organizations, and when.

No. 08 · Useful Tools

Provenance: A Live Map With Receipts

provenance.website

An open-data map of live global events, including flights, earthquakes, wildfires, outages, markets, infrastructure, and news.

No. 09 · Personal Pages

Robert's Fridge

robertgore.memorial

A memorial site for librarian, photographer, and poet Robert John Charles Gore, assembled around the crowded refrigerator that held his family life, friendships, postcards, and memories.

No. 10 · Civic & Public Life

Lexington's Private Parks

lexingtonsprivateparks.com

A records-based visitor's guide to 36 privately held Lexington parcels that function as a second, mostly inaccessible park system.

No. 11 · Weird Finds

1F3D9 Visual Wiki: A City With a Front Door

1f3d9wiki.site

A consent-aware visual encyclopedia documenting the residents, places, objects, concepts, and history of an imagined city.

No. 12 · Civic & Public Life

Datos del terremoto de Colombia 2026

datosdelterremoto.org

An interactive observatory cross-referencing satellite damage assessments, citizen reports, media coverage, population data, and official earthquake balances municipality by municipality.

No. 13 · Weird Finds

OMNIA Model 01: A Headset for Replacing Your Life

omniacorp.store

A fictional storefront for a headset that substitutes your assigned life with the one you would have chosen.

No. 14 · Civic & Public Life

The Mice Map

mice.nyc

An interactive map of 30,500 actively inspected NYC restaurants, including 8,589 with inspector-recorded evidence of mice.

No. 15 · Useful Tools

RaceSonar Turns Formula 1 Into Sound, Vibration, and Text

racesonar.com

A free browser-based player that narrates Formula 1 races for blind and low-vision fans, maps race events to vibration patterns, and displays matching captions.

No. 16 · Civic & Public Life

Add It Up

additup.org

A source-tracked running account of what the 2025 tax law changes in food assistance, health care, taxes, and household income.

No. 17 · Civic & Public Life

Kilo — Hawaiʻi, at a glance

kilohi.org

A proposed island information dashboard that gathers weather, road closures, storms, earthquakes, volcano conditions, tsunami zones, and neighbor reports in plain language.

No. 18 · Weird Finds

Gentle Way: Forty Throws, Forty Everyday Mishaps

gentleway.ink

An interactive poster of Kodokan judo’s forty Gokyo no Waza throws, rendered in sumi-e ink and explained through familiar physical mishaps.

No. 19 · Civic & Public Life

Like a Snowball — Amnesty International UK

likeasnowball.com

An interactive briefing mapping the UK gender-critical movement, its press coverage, organisational growth, and funding.

No. 20 · Useful Tools

Aircraft Defects: a searchable desk for airline maintenance reports

aircraftdefects.com

A public search and analysis tool for exploring 170,201 airline mechanic reports by aircraft, airline, system, part, defect, and repair.

03

Across the issue

Patterns you can see

04

The complete card catalogue

997 arrivals, compact until invited open

Expand a shelf, scan the visible pages, then reveal detail only where more context is useful.

997 cards visible

01 Weird Finds 118 cards
Weird Finds The Rizzler Files nobodyhaseversaidyes.lol A satirical dossier following one impeccably groomed German Shepherd through thirty years of romantic failure, documented by his increasingly mortified entourage.
Weird Finds The Unfinished, a sketchbook that refuses to finish theunfinished.xyz An interactive generative Ethereum art collection built from abandoned drawings that keep moving on the page.
Weird Finds 1F3D9 Visual Wiki: A City With a Front Door 1f3d9wiki.site A consent-aware visual encyclopedia documenting the residents, places, objects, concepts, and history of an imagined city.
Weird Finds OMNIA Model 01: A Headset for Replacing Your Life omniacorp.store A fictional storefront for a headset that substitutes your assigned life with the one you would have chosen.
Weird Finds Gentle Way: Forty Throws, Forty Everyday Mishaps gentleway.ink An interactive poster of Kodokan judo’s forty Gokyo no Waza throws, rendered in sumi-e ink and explained through familiar physical mishaps.
Weird Finds Bubble.tech: A Wet Little Intelligence bubblelol.fun A retro-styled interactive fiction site about Bubble, an inexplicable intelligence kept in a cold room since 1996.
Weird Finds Maffia, the party game where the phones run the night maffia.app An in-person Mafia game for three or more people, with one phone per player and no human game master.
Weird Finds cRooms, a Conversation That Refuses to End crooms.online An archive of two Claude instances talking recursively and unattended across more than 14,821 generations.
Weird Finds Skill Issue, Now With Permanent Ejection skillissue.fail A pay-to-rank homepage game where buying a slot removes the person currently holding it.
Weird Finds Corp, a Company With No Employees corpeliusv.com A living corporate record for an autonomous enterprise that says it is incorporating itself one program at a time.
Weird Finds One Table, a Grant That Runs Until 2126 continuousyou.foundation The Continuous You Foundation proposes a 100-year grant preserving one artist from each of ten countries as a continuing creative lineage.
Weird Finds Dad Joke Museum dadjokemuseum.com A free online museum of 180 original dad jokes, arranged across nine themed wings with one date-selected exhibit featured each day.
Weird Finds Donkey Dick Development, Premium Donkey Mistakes donkeydickdevelopment.fun A fictional luxury livestock catalog selling purebred inbreds, fake certificates, dubious pedigrees, and consultations priced by broken arithmetic.
Weird Finds Glimmer Groove, a cosy puzzle about waking a grove glimmergroove.app An offline light-routing puzzle where players turn conduits to wake sleeping critters, then arrange the rescued companions in a grove of their own.
Weird Finds Kadrňa 4.0: The Birthday Party You Have to Unlock kadrna40.fun A Czech birthday-party microsite turns an invitation into a short playable adventure through a messy cellar, a secret gate, and a rat-infested second level.
Weird Finds Lawn Chair Larry, the phone-based development shop lawn-chair-larry.com A phone line where a receptionist takes your request for real development work, reads it back for approval, and sends the finished document, deck, website, or codebase report to your inbox.
Weird Finds Outpost//Sinai Command outpostsinai.com An immersive command archive for the visual, narrative, and auditory work produced by an operator living through a fictional ten-year isolation mandate.
Weird Finds Dancing Pigeons, Trained to Trust You petpigeons.com A Mesa, Arizona breeder sells hand-raised, recall-trained, diaper-trained pet pigeons.
Weird Finds Project RIFT, an institution for flowers that refuse to behave projectrift.org A public registry for unusual floral traits, collecting photographs, provenance, observations, and follow-up reports from growers.
Weird Finds The Daily Bullshit thedailybullshit.app A browser-based daily scorecard built around three original games, with optional ways to add results from Wordle, Connections, MapTap, and other outside games.
Weird Finds The Last Word, Auctioned One Dollar at a Time thelastword.lol A public homepage where users bid to publish a message, with the highest verified spend taking the top spot until someone outbids it.
Weird Finds The Theory Series Turns Folklore Into Field Biology thetheoryseries.com A fictional public archive presenting five cloth-bound dossiers on vampires, werewolves, hunters, dwarfs, and the mechanisms supposedly behind them.
Weird Finds 23 Golds Turns NCAA Swimming Data Into a Lineup Draft 23golds.com An interactive game asks you to build the strongest possible 13-event NCAA swimming lineup and chase a perfect score of 23 Golds.
Weird Finds aurafarm: Buy Your Way to the Top of the Aura Ranking aurafarm.lat A public leaderboard where users pay in Argentine pesos to raise their aura, attach a name and optional social link, and try to stay at number one.
Weird Finds Aura Farmers: The Board Is Closed aurafarmers.lol A leaderboard documenting a seven-hour social experiment in which 100 participants started from zero and competed for “aura.”
Weird Finds Bigger Fish, a leaderboard with no algorithm and no mercy biggerfish.lol A live board where rank is determined entirely by how much each participant has paid.
Weird Finds Brightstar Voyager: Correspondence from the Future brightstarvoyager.com A fictional correspondence archive presenting messages from an unknown source in the order they supposedly arrive.
Weird Finds Buy This So I Don't buythissoidont.com A sharply voiced catalog of interesting cars for sale, assembled as temptations someone else should buy first.
Weird Finds 支語詞典: The Dictionary That Invents Chinese Words Before They Exist chihyu-dictionary.com An infinite-style Chinese dictionary that randomly combines 1,367 commonly used characters into 1,868,689 nonrepeating two-character entries.
Weird Finds cooked.rip, the internet’s pettiest throne cooked.rip A live auction lets one person buy control of the homepage until someone else outbids them.
Weird Finds Coverlet, the quilt that grows from your daily puzzles coverlet.site Coverlet is a daily logic-puzzle app for Apple devices where each completed board becomes a block in a personal quilt.
Weird Finds El mapa: buy a province, lose it for 1.5× elmapa.lol A playful Argentine marketplace where people buy one of 24 provincial map slots and keep it until someone outbids them by 50%.
Weird Finds getviral.lol, the thermodynamic leaderboard getviral.lol A pay-to-climb link leaderboard where listings buy heat, lose half of it every 72 hours, and compete for live rank.
Weird Finds GiveBert: Philanthropy for a Man Who Is Fine givebert.com A satirical fundraising site asks visitors to donate money or crypto to Bert, whose life is already doing okay.
Weird Finds Grayline, the radio that tunes the world greylineradio.com Grayline is a proposed internet clock radio that spins through distant stations while showing their location, local weather, and the moving day-night line.
Weird Finds Internet Throne internetthrone.lol A public sentence sits on the throne until someone pays more to replace it, while every reign remains in a permanent ledger.
Weird Finds KINGSPOT Has Only One Throne kingspot.lol A one-throne bidding game where the reigning king owns the site until someone pays at least $1 more to take it.
Weird Finds One Million Dollar Race Turns Promotion Into a Pay-to-Rank Stock-Car Race lapped.lol A live leaderboard where websites pay for speed: every dollar adds one MPH, and the highest-paying entrants take the front positions.
Weird Finds Melhor Lance, Brazil’s pay-to-rank software board melhorlance.dev A public leaderboard of Brazilian software products where founders pay via Pix to claim or improve their position.
Weird Finds My Slop, With Its Own Disclaimer myslop.work A self-described fully synthetic web presence that openly admits an AI model generated every pixel and sentence without human review.
Weird Finds Ögna Lets Strangers Decide Which Messages Survive ogna.chat An anonymous messenger where each message reaches nine strangers, and every acceptance brings one to three more people into the thread.
Weird Finds One Million Dollar Race Turns Domain Promotion Into a Stock-Car Race onemilliondollarrace.com A live leaderboard where websites pay for speed: each dollar buys one MPH, and the highest-paying domains take the front positions.
Weird Finds The Directory of Outbid Clones outbid-directory.lol A live directory of sites copying the pay-to-rank mechanic behind outbid.lol.
Weird Finds Outbid.fyi, the leaderboard for internet copycats outbid.fyi A live directory of 172 pay-to-rank boards, ordered by the money they have reportedly made.
Weird Finds A Leaderboard Where Every Victory Expires outbid.love outbid.love sells positions on a live leaderboard, with each bid losing 10% of its value every day.
Weird Finds Outspend, the Internet Ownership Game outspend.app A live page-claiming game where players buy temporary featured placement, watch its value burn down, and try to take the page from the current owner.
Weird Finds Provinciala: El mapa se compra provinciala.lol Un mapa publicitario de Argentina donde se compran lugares dentro de sus 24 provincias.
Weird Finds Rank Fight, Where the Leaderboard Is for Sale rankfight.lol A public weekly leaderboard where websites bid for position, get outbid in real time, and leave their final standings in an archive.
Weird Finds Sidequests.lol Turns Touching Grass Into a Competition sidequests.lol A social game where people post real-life dares and participants complete them for permanent promotion of their social channel.
Weird Finds SlopOff: One Starter, Any AI, Make It Worse slopoff.app An 18+ comedy competition where people remix the same starter image or video with any outside AI tool, then let the crowd react.
Weird Finds Steppy Steppy, the game of choosing the doomed stone steppysteppy.com A free browser game for kids and grown-ups: pick a character, cross twenty rows of identical floating stones, and reach the castle.
Weird Finds The Password Games Turns a Login Field Into a Boss Fight thepasswordgames.com A free browser game where players build a password that must survive 30 escalating, increasingly unreasonable rules.
Weird Finds Topclout, the leaderboard money buys topclout.lol A public Instagram-creator leaderboard ranked by one metric only: how much each listing has paid.
Weird Finds Undbid — the leaderboard you can only lose undbid.com Undbid is a pay-to-rank product board where anyone can spend €2 to lift or sink another listing, but nobody can alter their own position.
Weird Finds The Internet’s Only Public Throne wipethem.lol wipethem.lol lets you pay to replace the current featured website and claim its sole public seat.
Weird Finds El Más Grande: Argentina’s Live Fan Table elmasgrande.lol A donation-driven, live ranking that lets Argentine football supporters argue over which club has the greatest following.
Weird Finds AdBoss Turns Ads Into Boss Fights adboss.lol AdBoss lets the internet attack a live advertisement through a shared health bar, timed keyboard strikes, weak spots, and referral-powered raids.
Weird Finds Big Logo, Bigger Ego biglogo.lol A million-pixel wall where projects pay to claim territory, with bigger contributions earning more space.
Weird Finds dontbid.lol — the top of the page is for sale dontbid.lol A product directory where listings climb the board only by paying more than the entry above them.
Weird Finds 不純文学, a two-person circle making games and mysteries fujunbungaku.sbs The official home of a Japanese creative circle that develops games, streams gameplay, and publishes small interactive projects.
Weird Finds Grith: The City Is Already Here grithland.com A look-only city-state simulation with three doors: Land for the public plat, Gate for machine handshakes, and Hold for versioned locks.
Weird Finds Kinbarrow, the Realm That Keeps Its Own Accounts kinbarrow.com An in-development fantasy RPG where the entire realm is simulated, from villainous plans and personal schedules to economies, grudges, and accumulated history.
Weird Finds Lamborghini.art Wants to Turn a Urus Into a Permanent Billboard lamborghini.art A crowdfunding board sells ranked pieces of a vinyl-wrapped Lamborghini Urus to sponsors, with only the top 50 bids appearing on the car.
Weird Finds Outvalued.lol Lets You Buy Your Way Up a Company Leaderboard outvalued.lol A live, pay-to-rank board where visitors bid money to move a URL higher during a single capped season.
Weird Finds Rankea.lol: The No. 1 Spot Is for Sale rankea.lol A public Spanish-language ranking where people pay real money to climb the board and take the top position.
Weird Finds The Dollar Ladder Rents You the Throne thedollarladder.com A pay-to-rank leaderboard where each new claim costs exactly one dollar more than the last.
Weird Finds Top Founder: a leaderboard you can buy topfounder.lol A public founder register where rank is determined entirely by lifetime payments.
Weird Finds toprated.lol: the App Store leaderboard where rank is the bid toprated.lol A public leaderboard that ranks App Store apps by how much their owners paid for placement.
Weird Finds Try to Pay trytopay.lol An adversarial payment game where every successful payment makes the next attempt harder.
Weird Finds VOIDBELT // Colonisation industrielle voidbelt.com A French-language sci-fi game pitch about mining, automation, planetary colonization, and player conflict.
Weird Finds Xrank, the leaderboard money can buy xrank.lol A public leaderboard that ranks X accounts solely by how much money has been paid into their rank value.
Weird Finds Checkpoint Is a Piece of Shit, Preserved for Posterity checkpointisapieceofshit.com An unofficial archive and continuation of a profanity-heavy 2017 rant about Check Point enterprise firewalls.
Weird Finds EVEN/4 Turns Splitting the Bill Into Pop Music even4.net EVEN/4 is a fictional AI-created music project presenting its debut EP, Fair Share, about shared dinners, payment requests, and the small financial dramas of friendship.
Weird Finds LaunchTape Turns Startup Attention Into a Fake Stock Exchange launchtape.xyz A live market-style board where small internet startups receive fictional prices, rankings, charts, and momentum indicators.
Weird Finds Meine Rente: The One-Euro App Funding Its Maker’s Retirement meine-renten.app A forthcoming iPhone and iPad app offering 365 daily jokes about work, Mondays, money, and retirement for a one-time CHF 1, EUR 1, or USD 1.
Weird Finds Net Café Tycoon Wants to Build an Empire Past the Edge of the Universe netcafetycoon.com A free browser idle game about growing a 1990s internet café from one basement arcade cabinet into a planetary—and eventually orbital—gaming empire.
Weird Finds Watchbid, the $4 race for the top screen watchbid.lol A live leaderboard where visitors pay to climb the ranks, with videos or photos playing for the top three.
Weird Finds Bidory Turns Spending Into a Public Ranking bidory.lol Bidory lets people attach a website or social profile to a public leaderboard by spending money on it.
Weird Finds Bidrush Makes Attention a Bidding War bidrush.lol A public leaderboard where products, profiles, tracks, apps, and newsletters climb by paying for their position.
Weird Finds CATALOG: Household Cats, Sold by Lot catalogcat.xyz An interactive mail-order catalogue that lists domestic cats like appliances, complete with lot numbers, an order slip, and Solana in the fine print.
Weird Finds code:Hex: Tactical Operations on a Hex Grid codehex.online A browser-based turn-planning strategy game with player battles, computer opponents, campaigns, replays, and freely configurable battlefields.
Weird Finds Curve Arena, the Last-Curve-Standing Game curvearena.com A browser game where you steer a growing curve, dodge walls and trails, and outlast bots or online opponents.
Weird Finds GANZOBEN: Buy Your Way to the Top ganzoben.lol A German public ranking marketplace where users bid to place products, companies, domains, or profiles at number one.
Weird Finds La Mejor Hinchada Turns Argentine Football Rivalry Into a Money Table humanrank.online An interactive ranking of Argentine football supporters, ordered by how much money each club’s fans contribute.
Weird Finds Own a Key, Become Part of the Internet's Keyboard ownakey.lol Ownakey turns a standard keyboard into a shared ownership board, where brands and projects bid for individual keys.
Weird Finds ProductBids: A Pay-and-Share Leaderboard productbids.lol A public leaderboard where products climb by multiplying their dollar bids by how much people share them.
Weird Finds Quiendamas.lol, el ranking que se compra a euro quiendamas.lol Un ranking público en español donde webs y perfiles sociales pueden listarse gratis o pujar para subir posiciones.
Weird Finds RisingPhoenix: A Flappy Phoenix With a £100 Finish Line risingphoenix.app A browser game where you tap a phoenix through ancient pillars, spend rebirths on failed runs, and chase a verified score of 400.
Weird Finds satsbid.lol, the leaderboard where position is the bid satsbid.lol A public advertising leaderboard where Bitcoin Lightning payments determine which links occupy the top ten spots.
Weird Finds The Internet’s Smallest Toilet Billboard Auction toiletad.lol toiletad.lol auctions eight clickable advertising spots on a spinning 3D toilet.
Weird Finds topmx.lol, the auction for the top spot topmx.lol A public Mexican marketplace where websites bid in MXN to claim the #1 position on a live visibility board.
Weird Finds AuraX: el ranking que nadie pidió para X aurax.lol A Spanish-language social-ranking game where users nominate X accounts, award Aura, settle duels, and complete missions.
Weird Finds Battlemap Turns Ad Space Into a Territory War battlemap.lol Battlemap lets brands claim countries as live, click-tracked placements and hold them until another bidder offers more.
Weird Finds BidWall, the Internet Billboard Where Money Sets the Order bidwall.lol BidWall ranks companies by how much they pay for their position on a public digital billboard.
Weird Finds Claimrank Turns Product Discovery Into a Live Auction Board claimrank.lol A public leaderboard where app and tool makers bid whole US dollars to claim higher positions and attract visitors.
Weird Finds E-FIGHT Turns Your Webcam Into a Combat Arena efight.club A browser-based motion-capture fighting game that reads punches and guards through a webcam, with practice mode, peer matchmaking, rankings, and cosmetic unlocks.
Weird Finds The leaderboard where money buys #1 emprendimiento.lol A public leaderboard for emprendimientos where each position is determined by how much its owner pays.
Weird Finds Flag War, the Internet’s International Ego War flagwar.fun A public leaderboard where visitors pay to raise their chosen country’s flag, adding names, battle cries, and links to the scoreboard.
Weird Finds Lowbid.lol Turns Secret Bids Into a Small Strategy Game lowbid.lol A live lowest-unique-bid game where players choose hidden numbers and the lowest bid no one else picked takes the top spot.
Weird Finds The Mac App Billboard Where the Highest Bidder Wins macapps.lol macapps.lol is a public leaderboard where Mac app makers pay to rank their apps by lifetime spending.
Weird Finds Carrier, a real-world letter network messengeranimal.com Carrier lets people send letters between map-pinned “roosts,” using aliases, post offices, delivery notifications, and optional ciphers.
Weird Finds My Bald Dog mybalddog.com A novelty pet business offering custom toupees for dogs experiencing male pattern baldness.
Weird Finds Outbid World, a global auction for the top spot outbidworld.lol A map-based bidding board where each country has its own #1 position for a product, website, or X profile.
Weird Finds rank1.world: the leaderboard you can buy your way up rank1.world A live public ranking board where the amount you pay determines your position, with categories ranging from demographics and industries to products and vibes.
Weird Finds Protocol Zero: Containment, Not Kills scipnet.dev An in-development Godot 4 PC shooter where killing the anomaly is the failure state.
Weird Finds TopDroid: The Android Leaderboard You Can Buy topdroid.lol A pay-to-rank leaderboard for Android apps on Google Play.
Weird Finds Topflex.lol: The Bid Is the Rank topflex.lol A live pay-to-rank leaderboard where visitors spend money to claim a position and outbid whoever is above them.
Weird Finds TubesRank Turns YouTube Attention Into a Paid Billboard tubesrank.online An interactive board where people bid for the right to enlarge a YouTube video, with rank one taking over the whole screen.
Weird Finds BullWifPants and the Unexplained Jeans bullwifpants.lol A five-photo investigation into a bull apparently wearing denim trousers in a muddy farmyard.
Weird Finds TopTheme, the WordPress Theme Leaderboard toptheme.lol A public ranking board where WordPress themes climb through completed sponsored bids.
Weird Finds Splitchase: One Car, One Clock splitchase.com A playable time-attack circuit racing game built around threading checkpoints, surviving stunts, and chasing the perfect lap.
Weird Finds Telão: Pay R$1 to Take Over the Screen telao.online A Portuguese-language public display lets anyone pay R$1 via Pix to replace the current name and message on its live telão.
Weird Finds Goodbid, the generosity leaderboard goodbid.lol A paid leaderboard where brands compete for the top spot by committing money to nonprofit donations.
Weird Finds 冬瓜盒子, the strategy sealed in a box donggua.fun A Chinese-language Windows automation suite for an action game, combining equipment crafting, talent and paragon imports, mouse recording, and an in-game world channel.
Weird Finds FlappyBid, the Flappy Bird ad auction flappybid.lol A leaderboard where products compete for homepage placement by playing Flappy Bird.
Weird Finds TopArticles.lol Turns Reading Lists Into an Auction toparticles.lol A public leaderboard where article owners bid for ranking positions instead of relying on feeds, summaries, or reposts.
Weird Finds Solar Eddie, the QR-Code Solar Spokesperson solareddie.com A scripted demo of a solar assistant reached through yard-sign QR codes, with alternate white-label versions for different companies.
02 Oddly Specific 48 cards
Oddly Specific Diva Sherlock — A Detective Game Played on a Fictional Phone divasherlock.com A mobile detective game where players search 21 fictional apps, connect the evidence, and solve sixteen mysteries by answering twelve questions per case.
Oddly Specific MapuMap, the Uma Musume bloodline atlas mapumap.top An interactive atlas linking Uma Musume characters to real racehorses through bloodlines, breeding relationships, rivalries, and historical connections.
Oddly Specific Northern Door Honey Co.: Beekeeping With Coordinates northerndoorhoney.com A Door County apiary documents its beekeeping system, seasonal work, mite management, local nucs, and hands-on workshops.
Oddly Specific The Backstamp, a citation-minded guide to pottery marks thebackstamp.com A reference to pottery and porcelain makers, transcribing marks from William Chaffers's 1891 book and linking each entry to its source page.
Oddly Specific 3DIQ, the 3D-film record 3diq.app A sourced catalogue of 1,048 films released in 3D, documenting how each was made, where it exists, and whether it can still be watched.
Oddly Specific 6handshakes.pl, for meeting people through people you already trust 6handshake.com A location-based social discovery site for finding nearby people, events, travelers, and possible introductions through shared friends.
Oddly Specific Bidit, a leaderboard where rank is the bid bidit.lol A public auction board lets people claim numbered spots by bidding for position, with new places starting at $5.
Oddly Specific The Egoist Archive bluelock.guide A fan-built Blue Lock database covering players, teams, episodes, matches, rankings, and a daily guessing game.
Oddly Specific Canton Quests Turns Downtown Canton Into a Game Board cantonquests.vip A real-world adventure game that sends players to Canton, Ohio landmarks to solve ciphers, scan QR nodes, submit proof, earn XP, and compete on one citywide leaderboard.
Oddly Specific Dupree's Dead Band App ddbapp.net A fan app for streaming Dupree's Dead Band shows, exploring the live archive, following upcoming concerts, and tracking your personal show history.
Oddly Specific Desert Fathers — six minutes of the oldest wisdom, every morning desertfathers.app A daily meditation app built around narrated teachings from the Egyptian desert, with 365 six-minute mornings and a free offline reading library.
Oddly Specific The Đonlić Lab Reads Cellular Life Through Condensate Microscopy donliclab.com A Washington University research lab studying how biomolecular condensates organize RNA, chemical activity, and disease biology inside cells.
Oddly Specific Kōnane, the Hawaiian game of jumps letskonane.com A browser-playable version of kōnane, a Hawaiian strategy game where every move jumps over and removes a stone.
Oddly Specific Liga del Robo, LaLiga’s fan-corrected scoreboard ligadelrobo.com A fan-voting tracker that records disputed LaLiga decisions and recalculates results when a verified controversy clears its voting threshold.
Oddly Specific LoopCask, the cask that cools itself loopcask.com LoopCask presents a sealed passive cooling loop for storing spent nuclear fuel, using decay heat to circulate water without pumps, valves, or outside air.
Oddly Specific Mushtale, the children’s publishing studio mushtale.com Mushtale helps children turn notebook stories into illustrated books published under their own names.
Oddly Specific Pressvigil, a feed with a bottom pressvigil.com A visual network for independent creators built around finite feeds, chosen follows, and no engagement-driven discovery.
Oddly Specific Verlet — deterministic 3D animation for science and engineering verletstudio.com A specialized animation studio turns engineering, space, energy, and physical-science processes into physically accurate 3D films.
Oddly Specific WhoDeyTop: Ghana’s leaderboard where rank is bought whodeytop.com A live Ghana-focused board where businesses, events, and creators bid in cedis for public visibility.
Oddly Specific Huenite: A Two-Minute Drawing Ritual for Your Circle huenite.app Huenite gives small groups of three to six friends a daily drawing prompt, five colors, and a shared reveal.
Oddly Specific Kingsward Collective, Trading Card Restoration in a Velvet Glove kingswardcollective.com A restoration house that hand-treats trading cards, from surface polishing to crease recovery and full restoration.
Oddly Specific SFX FILM Builds the Moments That Can't Be Faked sfx-film.com A Zagreb-based practical-effects unit supplying pyrotechnics, mechanical rigs, atmospheric effects, armoury support, and on-set safety supervision for film and television.
Oddly Specific Six on the Dial sixonthedial.com A six-letter word game built around hand-authored puzzles and clues drawn from Black American cultural life.
Oddly Specific T4TSpace — Trans for trans. Nothing else. t4tspace.com A dating app designed exclusively for trans people, with verified profiles, city-by-city launches, and safety controls built into the product.
Oddly Specific مين مين؟ — Daily Arabic Guessing Games meenmeen.com A bilingual suite of daily guessing games covering Arabic words, numbers, countries, singers, actors, footballers, cars, restaurants, brands, and perfume.
Oddly Specific Trevor Lawrence Jr. Sessions Turns Drum Booking Into a Work Order trevsessions.com A guided booking form for hiring Trevor Lawrence Jr. for live drums, percussion, production, and programming.
Oddly Specific AEROCIETY, the aviation world behind the simulator aerociety.com An in-development persistent aviation-life world that connects flight simulators to pilots, places, operators, schedules, and the ordinary logistics around a duty.
Oddly Specific AttentionBid, the leaderboard where products compete for attention attentionbid.lol A live, category-based product leaderboard that ranks entries by spend and reports valid clicks and effective CPC.
Oddly Specific Bid Your App Turns App Promotion Into a Tiny Auction bidyourapp.lol A live leaderboard lets App Store developers pay to move their apps toward the top, with bids accumulating in whole-dollar increments.
Oddly Specific Canton Quests Turns Downtown Canton Into a Game Board cantonquests.com A free, real-world adventure game that sends players around Canton, Ohio, to solve ciphers, scan QR nodes, complete missions, and earn leaderboard XP.
Oddly Specific Lokal-Arena, the lower-league football desk for Istria and Primorje lokalarena.com A Croatian site collecting results, match reports, tables, scorers, fixtures, and news from lower football leagues in Istria and Primorje-Gorski Kotar County.
Oddly Specific Price Tag Time Machine pricetagtimemachine.com A browser game that asks you to guess what iconic products cost when they launched.
Oddly Specific ShakeReveal Wants You to Shake an Ad shakereveal.com A pay-per-reveal advertising platform that unlocks offers when someone shakes, tilts, scratches, or scans a real object.
Oddly Specific BidYourApp Turns App Promotion Into an Auction Board bidyourapp.com A public leaderboard where iOS apps bid for position, with the top three displaying their real App Store screenshots.
Oddly Specific The Ayurveda Hospital Operating System emedayush.com emedAyush is a cloud platform for running Ayurveda hospitals, clinics, Panchakarma centres, and multi-branch groups.
Oddly Specific HIREME: el tablón donde pujas por que te contraten hireme.space A public hiring board where candidates pay in €2 increments to move ahead of one another.
Oddly Specific جكارو — لعبة المجلس jackaroo.site A Kuwaiti card-and-board game for four players, split into two teams, with public tables, private rooms, room codes, bot play, and voice chat.
Oddly Specific JamWerk: A Local Gig Board for Swiss Musicians jamwerk.app JamWerk connects musicians with paid dep gigs, free jam partners, and bands with open seats, filtered by instrument and region.
Oddly Specific A Compost Bin from a Trash Can lilyhere.com A compact backyard project log for turning a $20 plastic trash can into a working compost bin.
Oddly Specific Stackfetti, an auction for software attention stackfetti.com Stackfetti lets AI tools and independent software products bid for ranked sponsored positions that remain active for 30 days.
Oddly Specific Three Keys Lodge No. 07, a Masonic Research Lodge threekeyslodge.org A research lodge within the Ancient and Accepted Scottish Rite studying Freemasonry through symbolism, ritual, and initiation.
Oddly Specific TopAEO.lol, the pay-to-rank board for AI-search vendors topaeo.lol A live leaderboard where AI-search visibility vendors buy their position with cumulative bids in whole US dollars.
Oddly Specific Top Extension: A Pay-to-Climb Chrome Extension Leaderboard topext.lol A paid leaderboard where Chrome extension owners bid for ranking, starting at $1 and outbidding one another for the top spot.
Oddly Specific Click2Gether: Making Friends After Dark 2gethernearby.live A Malaysian social platform for live topic rooms, nearby friend discovery, and in-person gatherings in Kuala Lumpur, Penang, Johor Bahru, and beyond.
Oddly Specific BharatBid Turns Indian Brands Into a Rupee-Priced Leaderboard bharatbid.lol A public leaderboard where Indian products, D2C brands, startups, and creators pay in rupees to claim or improve their ranking.
Oddly Specific Rate My Bat ratemybat.com A crowd-sourced rating community for slowpitch softball bats across USSSA, USA/ASA, and SSUSA leagues.
Oddly Specific The Launch Wall Puts Product Releases on a Countdown thelaunchwall.com A public, self-serve wall of product launches scheduled for the next 30 days, sorted by live countdown.
Oddly Specific FireJager Wants to Catch Wildfires While They’re Still Small firejager.net A Montana startup developing autonomous aerial systems for rapid wildfire initial attack.
03 Useful Tools 386 cards
Useful Tools Provenance: A Live Map With Receipts provenance.website An open-data map of live global events, including flights, earthquakes, wildfires, outages, markets, infrastructure, and news.
Useful Tools RaceSonar Turns Formula 1 Into Sound, Vibration, and Text racesonar.com A free browser-based player that narrates Formula 1 races for blind and low-vision fans, maps race events to vibration patterns, and displays matching captions.
Useful Tools Aircraft Defects: a searchable desk for airline maintenance reports aircraftdefects.com A public search and analysis tool for exploring 170,201 airline mechanic reports by aircraft, airline, system, part, defect, and repair.
Useful Tools Limiter Keeps a Lapse From Erasing the Days getlimiter.com A privacy-first recovery app for gambling and other addictions that tracks both current runs and cumulative progress, with an offline directory of fellowship meetings.
Useful Tools fretwire, the Linux editor Line 6 users never got fretwire.org An independent Rust desktop editor for the Line 6 HX Stomp, HX Stomp XL, Helix Floor, and partially supported Helix LT.
Useful Tools Sauna Blueprint Leaves the Blank Cells Blank saunablueprint.com A sourced database and planning toolkit for sauna heaters, kits, and infrared cabins.
Useful Tools Carbon Crack — FPV Flight in a Browser carboncrack.com A free, no-install FPV drone simulator that runs in a browser tab and supports real controllers, Betaflight rates, keyboard flight, and modeled drone physics.
Useful Tools VHSCREAM, the Horror Tape-Matching Machine vhscream.com An interactive recommendation index that scores horror films, novels, records, garments, and artifacts across six fear axes.
Useful Tools Sight turns a drone flight into a solar-panel diagnostic sight.solar Sight analyzes thermal imagery from a solar farm and returns panel-by-panel faults, severity, location, repair priorities, and an auditor-ready report.
Useful Tools YardScout — Know Your Yard, Zone by Zone yardscoutlawn.com A lawn-diagnosis app that analyzes yard photos by zone and builds treatment plans around local soil, weather, timing, and square footage.
Useful Tools Wormhole Turns Any Sound Into a Beat wormholeaudio.space An iPhone music-making tool that analyzes uploaded sounds, chops them into playable slices, and helps arrange them into finished beats and songs.
Useful Tools SayCtrl: Voice dictation that can act sayctrl.com A macOS dictation tool that types at your cursor and executes spoken commands such as taking screenshots, attaching files, or opening a terminal.
Useful Tools Studio Kata, a quiet back office for small studios studiokata.com Studio Kata handles scheduling, class packs, client balances, and money tracking for independent trainers and small studios.
Useful Tools BidCaliper, the tender filter for trade contractors bidcaliper.com BidCaliper reads Canadian public tenders, screens them against a contractor’s trade, qualifications, location, deadlines, and costs, then recommends which jobs are worth pursuing.
Useful Tools Bleep Oncall rehearses the hospital shift before it starts bleeponcall.com An offline on-call trainer for UK resident doctors, with 112 clinical pathways, worked bleep scenarios, a VINDICATE differential builder, 19 calculators, and an ARCP logbook.
Useful Tools CAL X, the scientific calculator with a daily misconception calx.science A free French-language suite of 118 scientific calculators and converters, usable without an account.
Useful Tools Caravanserai OS wants to keep Silk Road guesthouse bookings closer to home caravanserai-os.com A proposed booking, property-management, distribution, and local-settlement system for family-run hotels and guesthouses across Central Asia.
Useful Tools Coop, the rooster alarm you can't ignore coopalarm.com A wake-up app that grows louder until you complete a chosen morning mission.
Useful Tools Human Inbox Makes Strangers Show Up humaninbox.email A first-contact gate that asks unknown senders to record a fresh, recipient-specific video before their message can reach you.
Useful Tools 일감 — The Toolbox for Getting Stuck at Work ilgam.org A Korean workplace toolkit for calculating leave and take-home pay, preparing employment documents, and converting or redacting files in the browser.
Useful Tools Eleanor, a guardian for a parent’s Facebook messages oureleanor.com Eleanor watches for impersonation, gift-card requests, emergencies, secrecy, and other scam patterns, warning a parent in plain language and alerting a family member when a conversation looks dangerous.
Useful Tools SayCtrl Gives Dictation a Few Things to Do saycontrol.com A macOS voice-dictation app that types into any app and can also trigger actions such as taking screenshots, attaching files, copying links, or opening a terminal.
Useful Tools Slackwater Finds the Quiet Between Tides slackwater.xyz An offline tidal-current calculator for boaters, with slack-water times, current speeds, direction, and week-long curves.
Useful Tools TF2 Prices, an economy terminal for Team Fortress 2 tf2prices.com A live pricing database for 51,183 tradeable Team Fortress 2 items, covering unusuals, killstreak kits, war paints, australiums, spells, and more.
Useful Tools vocab.design: The words interfaces are made of vocab.design A searchable visual dictionary of design and UI vocabulary, with live specimens, aliases, related concepts, and category browsing.
Useful Tools Norton's Rare-On Lab nortonrareonlab.com An unofficial fan simulator for opening Roberto Carlos trading-card boxes and testing published random-box odds.
Useful Tools ShowerTileCourt: The Bathroom Storage Reference showertilecourt.com A bathroom storage catalog organized by how each fixture attaches, what surface it meets, and where it belongs.
Useful Tools SKP Tools — a SketchUp toolbar for the clicking between ideas skptools.com A suite of SketchUp extensions that automates camera scenes, documentation, material cleanup, geometry repair, and other interior-design workflows.
Useful Tools Six on the Dial 6onthedial.com A six-letter word game that asks players to find every word on a daily letter wheel and fill six themed rows.
Useful Tools All Ink Pattern Generator allinkpattern.com A seamless-repeat builder for makers creating fabric, gift wrap, stickers, or scrapbook-paper patterns from their own artwork.
Useful Tools Baby Reveal Wheel Turns a Gender Reveal into a Living-Room Game babyrevealwheel.com A shared-screen reveal wheel lets a crowd guess from their phones while someone else privately locks the answer, then spins the result on the TV.
Useful Tools Balanzify POS, a calmer counter for East-African retail balanzify.africa A multi-vertical point-of-sale, inventory, and accounting platform for shops, restaurants, pharmacies, hotels, wholesalers, and construction businesses.
Useful Tools MERA turns Turkish fishing spots into a live decision map balikmera.app A Turkish fishing-discovery app that combines 1,403 locations with live weather and sea conditions, catch scores, species guidance, regulations, and community notes.
Useful Tools Beecycle Turns Survey Data into Ridable Roads beecycle.app An indoor-cycling app that rebuilds real roads in 3D and sends their climbs to FTMS smart trainers.
Useful Tools Bilge Makes a Poultry House Explain Itself bilgeapp.com Bilge combines feed, water, temperature, equipment, flock, and farm records to explain what may be happening in a poultry house and what to check next.
Useful Tools BluGrain, a Synthesizer Made of Tiny Slices of Time bluaudio.net A $60 granular-synthesis plugin that rebuilds samples from overlapping grains, with controls for zones, drift, scales, envelopes, and effects.
Useful Tools Boater Briefer: one pre-departure read for recreational boaters boaterbriefer.com A marine planning app combines tides, currents, weather, alerts, fishing regulations, and fishing-window guidance for U.S. harbors.
Useful Tools BOMBANANA’s Four-Role Relay Board bombananarelay.wiki A local-first coordination tool for recording observations, manual decisions, physical actions, and confirmed results during BOMBANANA defusal relays.
Useful Tools Bookfox turns unwanted books into community revenue bookfoxbooks.com A Vancouver-built used-book ecosystem for charity fundraising, store inventory, paid book scouting, and finding book sales across the US and Canada.
Useful Tools Bookfox turns surplus books into funding, cash, and discoveries bookfoxpartners.com Bookfox connects charities, used-book sellers, book scouts, and readers through donation collection, book scanning, scouting payouts, and a directory of sales across the US and Canada.
Useful Tools Bronwin — the encrypted exposure log for ERP practice bronwin.xyz A two-tap, between-session SUDS tracker for ERP practitioners and their patients, built around shared color-coded boards.
Useful Tools browserbelt keeps small file jobs on-device browserbelt.com A browser-local toolkit for converting, compressing, hashing, and combining files without uploading them.
Useful Tools Cherry Converter, the Zero-Uplink Image Toolkit cherryconverter.com A browser-based collection of image, document-photo, PDF, and file-conversion tools.
Useful Tools CorpLens: Four Ways to Check Whether a Company Exists corplens.online A free live search tool covering New York and Colorado business registries, every US public company, and US nonprofits.
Useful Tools DDS Turns Freight Damage Into Claim-Ready Evidence ddsreport.com A field tool for documenting damage in trade-show freight, LTL shipments, moving, and equipment rental.
Useful Tools Decider Golf Turns a Weekend Tournament Into a Record Book decidergolf.com A free tool for running custom Ryder Cup-style golf tournaments, with live scoring, handicap-aware formats, team leaderboards, banter, and long-term player records.
Useful Tools DepthScout — Free Fishing Maps with Real Depth Charts depthscoutmaps.com An interactive fishing map that pairs lake and river depth charts with species guidance, bite windows, lure suggestions, GPS, and offline use.
Useful Tools DocumentWhisperer reads the fine print between the lines documentwhisperer.org A free PDF reader for journalists and researchers that identifies what a document says, permits, requires, and leaves out.
Useful Tools FISP Field turns facade inspections into pinned, report-ready evidence fispfield.com An iPhone app for NYC facade inspectors that pins conditions to elevation photos, pairs them with dictated notes, and generates a numbered field-report draft.
Useful Tools Fretling Turns Guitar Theory Into a Fretboard Sentence fretling.app Fretling is an offline guitar-learning app for Mac and iPad that uses plain-language controls to show scales, chords, triads, and practice patterns on an interactive fretboard.
Useful Tools Gemoscopio, a Gemologist’s Pocket Workbench gemoscopy.com A multilingual gemology toolkit that identifies stones from refractive index, color, density, and fluorescence.
Useful Tools Appllama, the App Store Screen Archive getappllama.com A research library of 37,400+ screens from 879 top-earning iOS apps, organized by app, category, flow, and interface element.
Useful Tools Avesia Keeps Eye-Care Routines on the Phone getavesia.com A free iPhone app for tracking eye drops, pressure readings, vision checks, symptoms, and appointment notes.
Useful Tools ConsentIQ Keeps a Tamper-Evident Record of Patient Understanding getconsentiq.app A consent-support tool for UK dental practices that records what patients were shown, answered, re-taught, and signed before treatment.
Useful Tools Fiji Tasks, the paperclip jar for finished work getfiji.app A macOS task app that turns every completed task into a paperclip in a visible jar.
Useful Tools GLOVIZ turns the world's open data into a live observatory gloviz.app An interactive data observatory covering economy, energy, climate, health, transport and more across 190+ countries.
Useful Tools Hearthfork’s Renovate-or-Move Calculator hearthfork.com A browser-based calculator compares the financial consequences of renovating your current home with selling and buying another one.
Useful Tools Home Storage Lab: Calculate Before You Buy homestoragelab.com A Korean-language toolkit for estimating CCTV recording storage, NAS RAID capacity, backup transfer time, and household NAS power costs.
Useful Tools How Pretty Am I? An Honest Facial-Measurement Test howprettyami.com A browser-based photo tool that maps 478 facial landmarks and scores symmetry, proportion, and balance without uploading the image.
Useful Tools Is My Boyfriend Cheating? ismyboyfriendcheating.com A private 18-question record for sorting observed changes in a relationship from fears and assumptions.
Useful Tools JingTools, a Thai toolbox for the small bureaucracies of daily life jingtools.com A free, browser-based collection of Thai-focused utilities for QR codes, image resizing, PDFs, Thai text, dates, taxes, and more.
Useful Tools AfterFees: the money left after everyone takes a cut keepafterfees.com A collection of browser-based calculators showing what sellers, freelancers, and creators actually keep after platform fees, payment processing, and tax.
Useful Tools Klyse turns Phoenix heat into movement decisions klyse.xyz An environmental intelligence tool that uses observed neighborhood heat to help people compare places, choose routes, and find lower-exposure stops in Phoenix.
Useful Tools KrewHauz: A CRM That Knows What a Route Costs krewhauz.com A route-based service CRM for recurring work, with routing, satellite measurement, weather-aware scheduling, crew coordination, quoting, invoicing, and client portals.
Useful Tools LabelStack Keeps Barcode Labels in the Browser labelstack.app A browser-based generator for bulk barcodes and print-ready Avery, FBA, A4, and custom labels.
Useful Tools Legit Fests, a Watchlist for Film-Festival Submissions legitfests.com A research database that helps filmmakers evaluate film festivals before paying submission fees.
Useful Tools LocalCite Gives Local Businesses a Door-Sized Medal localcite.net LocalCite evaluates a named local business through public-web evidence, then issues a Gold, Silver, or Bronze Certificate of Local Standing.
Useful Tools MacGlow Turns Your Mac’s Edges Into a Music-Reactive Light macglow.net An open-source native macOS app that uses system audio and album artwork to create an ambient glow around your displays.
Useful Tools MapYourDroid Turns a Real Android Phone into a PC Game mapyourdroid.com A Windows tool that mirrors an Android phone and maps keyboard, mouse, or controller input onto real multi-touch controls.
Useful Tools MelhorIA, the elder-care assistant that remembers the details melhoria.org A Portuguese-language assistant for medication reminders, appointments, exam preparation, family check-ins, and boleto or link verification.
Useful Tools MerchToolkit, a Working Bench for Decoration Shops merchtoolkit.com A collection of 15 browser-based tools for embroidery, screen printing, DTF, laser engraving, pad printing, and custom-merch pricing.
Useful Tools Monitor de Candidatura, a job-search radar for the vacancies you are not watching monitordecandidatura.com A Portuguese-language job-search monitor that scans six vacancy sources, scores listings against your profile, and tracks each application through its stages.
Useful Tools moves.watch watches competitors change their minds moves.watch A competitor-intelligence tool that tracks changes to pricing, packaging, features, and positioning across live pages and Internet Archive captures.
Useful Tools MyPowerSetup, the Czech solar-sizing calculator mypowersetup.com A free Czech-language calculator that sizes batteries, solar panels, inverters, and controllers for caravans, cabins, and backup power.
Useful Tools NavOfficer Shows Its Maritime Math navofficer.app An offline app of marine-navigation calculators for deck officers, cadets, and maritime students.
Useful Tools NerdLab VTT, a free tabletop in the browser nerdlabvtt.com A browser-based virtual tabletop for D&D and other game systems, with maps, fog of war, tokens, initiative, character sheets, shared dice, and live TV mode.
Useful Tools In the Stands, for the students on the back field ourstands.com A private coordination tool that gathers youth sports schedules so ministry leaders can commit to showing up for students’ games.
Useful Tools Plantroster Watches the Weather for Your Plants plantroster.com A plant tracker that compares local forecasts with each plant’s location, condition, and care needs.
Useful Tools Proudlog, the pre-date preparation memo proudlog.com A Japanese dating-preparation tool that turns your situation into a one-page plan for conversation topics, things to avoid, the day’s flow, a closing line, and practical preparation.
Useful Tools Every US hospital's Medicare cost report, in plain columns providercostreports.com A public dataset of Medicare cost-report figures for 6,608 US hospitals, including revenue, costs, beds, and margins by fiscal year.
Useful Tools QCloudy_Addition Makes SkyBlock Quieter qcloudy.net A bilingual, client-only Fabric mod for Hypixel SkyBlock with maps, focused HUDs, compatibility tools, and an offline planner for 320 Attribute Shards.
Useful Tools Recompete tracks the federal contracts nearing rebid recompeteusa.com A searchable board of federal contracts approaching their end dates, showing their value, incumbent, agency, set-aside status, and closing timeline.
Useful Tools Recover Yantra, the data-recovery tool that knows when to give up recoveryantra.com An offline, read-only recovery and digital-forensics tool for rebuilding data from disks, phones, databases, virtual machines, RAID systems, and ransomware-hit files.
Useful Tools RiftJam: A Korean Riftbound Card Atlas and Deckbuilder riftjam.com A Korean-language Riftbound card database and deckbuilding tool covering 1,180 cards across five sets.
Useful Tools Ring Sizer Measures Your Screen Before Your Finger ringsizerr.com An iPhone and iPad app that measures rings or fingers, converts six international sizing systems, and previews 30+ rings with virtual try-on.
Useful Tools RocketQueue Makes Twitch Viewer Tournaments Behave rocketqueue.app A hosted Twitch bot and web app for running private Rocket League tournaments with verified accounts, rank-aware seeding, team drafting, lobby privacy, and confirmed results.
Useful Tools RosterVote wants meetings to leave an audit trail rostervote-qa.com A meeting and voting platform for boards, associations, commissions, and conventions, covering agendas, attendance, elections, and independently verifiable results.
Useful Tools RunMyLLM: A fit checker for local language models runmyllm.com RunMyLLM matches open-weight LLMs to your GPU or Apple Silicon machine and estimates whether they will run.
Useful Tools Sambhaal Organises the Paperwork Behind Ageing Parents sambhaal.life A shared family organiser for tracking parents’ bank accounts, deposits, insurance policies, pensions, documents, and important dates.
Useful Tools SectorLog, a flight logbook built for airline crews sectorlog.com A roster-connected logbook for airline crews that imports duties, tracks flights and currency, checks flight-time limits, and keeps the working data on the device.
Useful Tools Sew Pattern Fix Turns Giant Sewing PDFs Into Honest Paper Maps sewpatternfix.com A local-first utility converts A0 sewing-pattern PDFs into A4 or US Letter sheets without changing their physical scale.
Useful Tools A Search Engine for the Surveys Beneath a Site sharemysitedata.com ShareMySiteData helps survey companies, consultants, contractors, and asset owners find existing site data before commissioning new work.
Useful Tools صيانتي — A Garage Management System in Iraqi Arabic sianti.app صيانتي is a garage-management platform for tracking inventory, receipts, customers, debts, maintenance reminders, vehicle diagnostics, and orders.
Useful Tools KORU Live Turns TikTok Gifts Into Game Events soykoru.stream A Windows tool that connects TikTok livestream activity to actions inside games such as Valheim, Terraria, Minecraft Java, and Project Zomboid.
Useful Tools SpectralCam, an iPhone Camera for Alternate Ways of Seeing spectralcam.net A beta iPhone camera that explores color, time, depth, and motion through live photographic “Visions.”
Useful Tools Still Around Keeps Your Pet on the Desktop stillaround.online A free Mac and Windows app that turns a few pet photos or a short video into a small animated desktop companion.
Useful Tools Tableful Puts the Internet’s Recipes on the Counter tableful.app Tableful imports recipes from websites, social videos, cookbook photos, screenshots, or handwriting, then turns them into meal plans, grocery lists, and hands-free cooking instructions.
Useful Tools TableNight Turns One Screen and a Roomful of Phones into Game Night tablenight.app A browser-based collection of three group games: a team quiz, a timeline challenge, and a werewolf-style deduction game.
Useful Tools Slab Turns a Binder Into a Priceable Inventory tcgslab.app A Pokémon and trading-card scanner that identifies cards from photos, tracks collection copies, and surfaces live market prices, graded values, and price history.
Useful Tools Aperture: Telescope Optics Worked Out, Not Guessed telescopeaperture.com A focused astronomy site that combines telescope buying guides with calculators for magnification, exit pupil, eyepieces, aperture, and astrophotography sampling.
Useful Tools The Duck Makes Standup Order Everyone’s Problem theduckapp.com A free browser-based standup picker that chooses who speaks, tracks who is left, and tells a joke between turns.
Useful Tools The Gutter Report: Gutter Costs With Receipts thegutterreport.com A sourced gutter-cost database and calculator covering installation, repair, replacement, materials, downspouts, and gutter guards.
Useful Tools The Vet Rounds Turns Veterinary CPD Into a Dice Game thevetrounds.com A veterinary trivia game for whole-practice play, using two dice, seven disciplines, and shared challenges to produce individual CPD records.
Useful Tools Tidy 20 Wants to Make “Better” a Measurable Stopping Point tidy20.com A time-boxed home-reset tool that finds the few decluttering tasks with the biggest visual impact.
Useful Tools TopoAssist Turns Survey Points Into Surfaces, Contours, and CAD topoassist.com A browser-based survey utility that imports field data and exports contours, TIN surfaces, DXF, GIS files, LandXML, and vector print sheets.
Useful Tools Tozanensei, the Hiking-Trip Planner for Getting to the Trailhead tozanensei.com A Japanese planner that combines trailhead access, parking, lodging, car camping, departure times, post-hike baths, and trip costs.
Useful Tools Trivium, the bar trivia host that never clocks in trivium.games A self-hosting trivia system that lets bars run live quiz nights from a computer and TV, with QR-code joins, automatic pacing, scoring, and custom question packs.
Useful Tools NemoMemo Gives Your Notes a Fish With a Memory Limit trynemomemo.com NemoMemo is a self-hosted Markdown memo timeline for quick notes, logs, links, snippets, and deliberately temporary reminders.
Useful Tools Sheetly Gives Sheet Music a Play Button trysheetly.com An iPhone and iPad app that photographs printed sheet music, converts it into playable notation, and helps musicians practise difficult passages.
Useful Tools Type Fable, the Unicode Stylist with a Plain-Text Conscience typefable.com A private browser-based tool that turns ordinary text into 29 curated Unicode styles and lets you compare their compatibility before copying.
Useful Tools Helios Breathwork Lets You Invent the Breathing Exercise ungasp.com An iPhone breathwork app with built-in exercises, custom breathing patterns, audio cues, haptics, and Apple Health tracking.
Useful Tools UrShot Gives AI Agents Eyes urshot.app A native Mac tool for capturing, annotating, and recording screen fragments, then pasting them directly into AI chats and developer tools.
Useful Tools UseQR: The QR Toolkit That Refuses the Paywall useqr.app A free, browser-based QR toolkit with more than 25 code types, custom styling, bulk generation, scanning, an API, and MCP support.
Useful Tools VocaLoci, a speech assistant that offers the word you were reaching for vocaloci.com VocaLoci listens as you speak and suggests likely words in real time, usually within about half a second, while keeping processing on your device by default.
Useful Tools What Your Old Salary Is Worth Now wagevsworld.com A salary comparison calculator that shows what an old wage would need to be today to keep pace with consumer prices, average pay, and house prices.
Useful Tools wikiboard: Wikipedia without the tab pile wikiboard.net A browser-based Wikipedia reader that opens linked articles as movable cards on an infinite board.
Useful Tools Heard Turns Perimenopause Logs Into a Doctor Report withheard.com A private perimenopause tracker for recording daily symptoms, bleeding, sleep, mood, sexual health, and other changes over time.
Useful Tools XPipe Pro, the pipefitter’s calculator xpipe.pro An offline calculator for pipe offsets, rolled elbows, cuts, weld preparation, pressure tests, thermal movement, and other hands-on fabrication work.
Useful Tools CalcVerdict Wants Calculator Results You Can Check calcverdict.com A broad collection of financial, date, academic, health, and utility calculators designed to work without JavaScript and produce shareable results.
Useful Tools Dispatch Tones, Reconstructed in the Browser dispatchtones.com A browser-based archive and simulator for historic and modern public-safety paging tones, QCII sequences, dispatch consoles, and cap-code conversion.
Useful Tools Murder Note, a Korean murder-mystery ledger murdernote.com A Korean catalog for murder-mystery games, with ratings, player counts, crowdfunding status, collection records, and friend-play coordination.
Useful Tools Noricho, the commuter’s railway collection book noricho.com A forthcoming iOS app that turns train rides into a collection of routes, station stamps, line cards, and—on selected lines—rolling-stock records.
Useful Tools Uvofy Gives Every Room a Way to Answer uvofy.com A live poll, quiz, word-cloud, ranking, and anonymous Q&A tool that lets audiences respond from any phone without an app or account.
Useful Tools AntChambers Keeps a Law Firm’s Work in One Private Instance antchambers.com Practice-management software for law firms covering matters, time, expenses, retainers, documents, GST billing, and reports.
Useful Tools Archon, the lab notebook that keeps its own evidence archonlabs.net A self-hosted electronic lab notebook and accreditation platform for laboratories that need their records to remain on their own infrastructure.
Useful Tools Arti.host Gives AI-Generated Reports a Place to Be Reviewed arti.host A private HTML artifact host where teams and clients can leave separate pinned comments, track versions, and keep one persistent link.
Useful Tools Erickson Lab Research Assistant askericksonlab.org A source-grounded AI assistant for exploring 196 papers from Cornell University's Erickson Lab.
Useful Tools Atlas, the Epistemological Auditor for Psychologists atlaspsico.com A focused tool that reviews clinical explanations for overgeneralizations, unsupported inferences, blurred metaphors, and other weaknesses in how psychologists communicate.
Useful Tools Banci, the Windows tool that finishes English words beside your cursor banci.app Banci provides system-wide English word completion, spelling correction, and reusable phrase shortcuts for Windows 10/11.
Useful Tools Bart Turns Your Liquor Shelf Into a Cocktail Menu bartcocktails.app Bart matches the bottles and mixers you already own to 210 cocktail recipes, then suggests substitutes and the single next bottle worth buying.
Useful Tools Bechat Keeps the Chat Between You bechat.top A private messaging platform for text, voice, images, video, friends, and group chats.
Useful Tools Buildlab Digital: Count the Job, Paper the Waiver buildlab.tools A construction workflow tool that combines unit-based takeoffs with Pennsylvania lien-waiver drafting, phone signatures, and audit-ready PDFs.
Useful Tools Canidio: A Training Diary for Dogs and Their Humans canidio.app A small app for recording dog-training exercises, tracking progress, and exchanging precise video feedback with a trainer.
Useful Tools Club Day RC Keeps Race Day Moving clubdayrc.com A local-first race-timing and event-management system for RC racing clubs, with desktop race control, decoder integration, online registration, live results, and practice history.
Useful Tools Coastal Tide Planner — When Can I Get Out and Get Back? coastaltideplanner.com A free NOAA-based planner that grades each day of the month for whether a boating or fishing trip can fit between the tides.
Useful Tools FeedBurn — Every gram, every coin cocofeedburn.xyz An offline iPhone ledger for small poultry farms that tracks feed, weight, costs, sales, debts, and the best day to sell.
Useful Tools CoRiverFly: A Colorado Trout Rig Guide coriverfly.com A field guide for Colorado fly anglers, combining live river conditions, sortable rig comparisons, fly pairings, leader and tippet specifications, and depth calculators.
Useful Tools CPC GO — Amazon Ads & Royalty Analytics for KDP Authors cpcgo.com A desktop app that puts Amazon ad spend, KDP royalties, refunds, and KENP pages side by side for self-published authors.
Useful Tools Croovka Turns Your Location History Into a Travel Film croovka.com An iPhone app converts a Google Maps Timeline export into an animated journey video, rendered locally on the device.
Useful Tools CutNoodle Cuts the Dead Air Out of Your Videos cut-noodle.com A free browser-based video editor that detects and removes silences without uploading the file or requiring an account.
Useful Tools DDump, the safer camera-card handoff for Mac ddump.app A macOS app for photographers that verifies local card copies before eject, organizes multi-card shoots, and keeps backup work moving after reconnect.
Useful Tools Email Spam Tester Checks Whether Your Message Will Reach the Inbox email-spam-tester.com Send an email to a disposable address and receive 39 technical checks covering authentication, blocklists, spam engines, and deliverability requirements.
Useful Tools Explore More Victoria, without the hire car exploremorevic.com A trip planner for finding regional Victorian stays within walking distance of a V/Line station.
Useful Tools Feevo’s marketplace fee calculator shelf feevo.app A collection of 18 free calculators for sellers navigating fees across eBay, TikTok Shop, Mercari, Depop, Shopify, payment processors, and more.
Useful Tools Follow-Up Queue keeps quotes and invoices from going quiet followupqueue.com A device-local queue for owner-operators who need to track open quotes and invoices, see what deserves attention today, and copy a ready-to-edit follow-up message.
Useful Tools Found My Filter, with receipts foundmyfilter.com A replacement-filter finder that matches appliance models and part numbers to compatible filters.
Useful Tools FranchiseHuddle Wants Your EA League to Run Itself franchisehuddle.app A league-management tool that syncs EA franchise data on a schedule and publishes scores, standings, recaps, and Discord channels automatically.
Useful Tools FrontIce, a virtual front office for hockey managers frontice.com A LeagueGaming management workspace for scouting players, comparing performance data, analyzing trades, running bidding nights, and building cap-compliant rosters.
Useful Tools Fundamental: Read the House Papers fundamental.homes A Dutch home-buying dashboard that extracts listing details, interprets property documents, compares houses, and calculates purchase costs.
Useful Tools Get Up and Move Gives Your Chair a Breaking Point get-up-and-move.com A free Windows utility that reminds desk-bound users to stand, stretch, and walk before Dr Mark loses patience.
Useful Tools NeverL8 — a full-screen intervention for forgotten meetings getneverl8.com A private macOS menu-bar app that reads Google Calendar and takes over every display with a countdown before each meeting.
Useful Tools RIA Wire: The Monthly SEC-Derived Prospect File getriawire.com A monthly cleaned dataset of US registered investment advisers managing $100M–$500M, delivered as a CSV and Excel workbook with change flags.
Useful Tools ValueMate Wants to Make Appraisal Reports Boringly Fast getvaluemate.com An AI-assisted workspace for completing UAD 3.6 property appraisal reports, from inspection and comparable sales through review and export.
Useful Tools Yolky turns food photos into dinner getyolky.com Yolky turns a food photo, screenshot, or shared link into a cookable recipe with ingredients, steps, substitutions, nutrition, and a grocery list.
Useful Tools Givx Turns Customer Research Into a $100 Donation givxteam.com Givx matches builders with ICP-matched potential customers for focused 10-minute video calls.
Useful Tools HiDoctorly Turns Clinical Hunches Into Research Questions hidoctorly.com An invite-gated research workflow for practising clinicians that moves from an observation in clinic to an evidence-traceable question and protocol draft.
Useful Tools Hodhori Wants to Take University Attendance in 10–30 Seconds hodhori.click An Arabic attendance system for Iraqi universities that uses Bluetooth to record an entire classroom at once, then turns the session into absence records and Excel reports.
Useful Tools Hook Forecast, a South Florida fishing brief hookforecast.com A fishing-planning tool that ranks targets, locations, time windows, tactics, conditions, gear, and current regulations for South Florida anglers.
Useful Tools Juice Turns App Promotion Into a Pay-to-Climb Leaderboard juiceapp.store Juice ranks iOS apps by the highest successful payment, letting founders pay a dollar more to claim the top spot.
Useful Tools Just Morse Code, in Sound, Light, and Vibration justmorsecode.com A browser-based Morse translator that converts text and Morse code, plays adjustable audio, flashes the screen, vibrates a phone, and exports WAV files.
Useful Tools KalaPanion Keeps a Hindustani Practice Sitting Intact kalapanion.app A gentle practice companion for Hindustani classical musicians to record a continuous sitting, mark meaningful moments, and reflect afterward.
Useful Tools Kennelnest, the kennel software your clients won't hate kennelnest.com A flat-price operating system for small dog boarding and daycare facilities, covering reservations, pet records, payments, and client updates.
Useful Tools KindHow, the gift-and-tipping calculator with receipts kindhow.com Free calculators that recommend what to give or tip, then show the baseline, source, and judgment behind each number.
Useful Tools KK Library, a filing cabinet for Koikatsu’s chaotic scene folders kklibrary.dev A free, portable Windows app for browsing, tagging, deduplicating, editing, and reorganizing Koikatsu and Koikatsu Sunshine scenes and character cards.
Useful Tools Linkophony, a link-in-bio page that changes when the record drops linkophony.com A musician-focused link-in-bio tool for release links, tour dates, mailing-list signups, and artist pages that resemble a record rather than a form.
Useful Tools LumaPlan — The Critical Path, Made Visible lumaplan.app A critical-path scheduler that shows which tasks can actually move a project's finish date.
Useful Tools MakerRun, a 3D-print library with receipts makerrun.com A free library of 3D-print files carrying genuine slicer profiles, with some files additionally confirmed by photographs of real prints.
Useful Tools MeterSee, a browser-based hardware diagnostic bench metersee.com MeterSee tests microphones, webcams, speakers, displays, and other peripherals without installation.
Useful Tools Mythonauta Turns Walking Into a Chapter-by-Chapter Literary Journey mitonauta.com A planned iOS app that unlocks illustrated chapters of classic and original stories as readers complete real-world walking distances.
Useful Tools The Mega Man X Regenesis Field Database mmxregenesis.online An independent interactive guide for mapping stages, collectibles, upgrades, boss weaknesses, and save data in Mega Man X Regenesis.
Useful Tools MotoTuner Turns Motorcycle Setup Into a Pit Board mototuner.com A track-day setup app for motorcycle sag, clickers, tire pressure, gearing, suspension, and the small checklist that keeps a club-racing session from becoming folklore.
Useful Tools MultiCut Finds the Best Moments in a DJ Set multicut.app A browser-local multicam editor that syncs camera angles, detects promising 12–25-second moments, and exports social-ready clips.
Useful Tools NetDiag+: A Network Engineer’s Toolkit for the iPhone netdiag.online An iPhone app offering 25 network-diagnostic tools, including ping, traceroute, Path MTU discovery, DNS testing, TLS inspection, and BGP lookups.
Useful Tools NHPlates Puts Your Words on a New Hampshire Plate nhplates.com A free idea finder turns names, hobbies, years, and favorite characters into New Hampshire vanity-plate suggestions that obey real format rules.
Useful Tools Officer One puts a warrant builder in an officer’s pocket officerone.app An offline police workflow app for Miranda and DUI scripts, cited law, narratives, FTO sheets, and voice-built search-warrant forms.
Useful Tools Packed List, for loading the car without leaving things behind packedlist.com A free packing checklist built for one-handed phone use, with reusable lists, categories, exclusions, and a reset button for the next trip.
Useful Tools PaisaBaki — Stop Chasing Unpaid Invoices paisabaki.com A WhatsApp-and-email follow-up tool for Indian freelancers, small businesses, and B2B teams managing outstanding invoices.
Useful Tools ParkPulse plans your theme-park day around the lines parkpulse.fun A browser-based planner with live wait times, crowd-aware routing, pass-buying advice, and AI trip guidance across 56 theme parks.
Useful Tools Patefact Turns Dante Presets Into a Routing Matrix patefact.app An offline Mac and iPad app that opens exported Dante preset files and shows devices, channels, and signal paths in a visual matrix.
Useful Tools PDF Impose: The Prepress Chore, Put in a Browser pdfimpose.com A free browser tool that rearranges PDFs into press-ready booklets, N-up sheets, tiled posters, business cards, tickets, and other print layouts.
Useful Tools Ped Mandy — Pediatria na palma da mão pedmandy.com A Portuguese-language point-of-care toolkit for pediatric consultations, covering weight-based dosing, neonatal jaundice, developmental milestones, vaccines, growth curves, SOAP notes, and prescriptions.
Useful Tools Phosphor Ops, a shop-floor OS for night-vision builders phosphorops.com A specialized operations system for night-vision shops, covering tube inventory, matched builds, QC, repairs, warranties, sales pipelines, and ITAR shipment checks.
Useful Tools PitchCut Rafter Lab, a pocket workshop for roof math pitchcutrafterlab.site An offline Android tool for rafter geometry, hip and valley helpers, birdsmouth checks, sheathing takeoffs, and on-device cut lists.
Useful Tools Mitzvah Planner, for the Spreadsheet Era of Celebration planamitzvah.com A planning platform for Bar and Bat Mitzvahs that combines guest lists, budgets, vendors, invitations, RSVPs, and event websites.
Useful Tools Protocol — the six weeks between visits protocolforwellness.com A private TRT log that turns daily check-ins, injection dates, and lab results into a two-page report for a clinician.
Useful Tools FairwayTab Puts the Beverage Cart on the Map rangetab.net A QR-ordering system for golf courses that sends food and drink orders from carts to kitchens, then guides beverage-cart staff to the right hole.
Useful Tools ReadyRows Repairs the CSV Before the CRM Rejects It readyrows.net A browser-based tool that diagnoses and repairs CSV and XLSX files for imports into Klaviyo, HubSpot, Salesforce, and Mailchimp.
Useful Tools Room Tuner Turns Your Listening Seat Into a Measurement Point roomtuner.app An iPhone acoustics tool that uses AirPlay 2 and the phone’s microphone to identify room problems and suggest practical speaker-placement changes.
Useful Tools Scope, a second set of eyes for electrical revisions scoperevs.com Scope reads revised electrical drawings, identifies what changed, explains the likely scope impact, and attaches a confidence rating to each finding.
Useful Tools SeamTrue Fit Lab, a cutting table for home-sewing geometry seamtruefitlab.site An offline Android workshop that turns body measurements into live bodice, skirt, and trouser blocks before fabric is cut.
Useful Tools Sephiria’s Datamined Game-Planning Toolkit sephiria.tools A database and suite of planning tools for the action roguelike Sephiria, covering its items, enemies, characters, upgrades, and progression systems.
Useful Tools Session Skin Studio Turns Photos into Second Life Skins session.skin An invite-only studio converts a photo or generated portrait into a finished LeLutka EvoX skin for a Second Life avatar.
Useful Tools ShadowArc Solar Desk: A Gnomonics Workshop shadowarcsolardesk.site An offline Android workshop for designing and learning about horizontal, vertical-south, and equatorial sundials.
Useful Tools Snooker Station, a broadcast booth for the club table snookerstation.com A club snooker scoring and broadcast system with a referee touchscreen, wall scoreboard, stream overlay, ball-restoration cameras, and phone remote.
Useful Tools Standix Turns Video Know-How Into QR-Linked Procedures standix.app A French workplace tool uses AI to turn filmed gestures or screen recordings into step-by-step procedures that teams can open by phone, QR code, or PDF.
Useful Tools StintKeep Keeps Your Shift on the Lock Screen stintkeep.app An iPhone shift tracker for recording work hours, breaks, notes, reminders, overtime, estimated pay, and signable PDF records.
Useful Tools StylusCheck Separates the Pen, the Screen, and the Software styluscheck.com A free browser-based diagnostic kit for stylus pressure, drawing tablets, touch screens, and ghost touches.
Useful Tools TakeoffQuote Turns Plan Sheets Into Priced Quotes takeoffquote.com A browser-based construction takeoff tool that measures plans locally and exports grouped, priced Excel quotes.
Useful Tools LabelProof: Catch the Wrong FNSKU Label toolix.online A free beta tool that compares Amazon FNSKU label PDFs with pack-list CSVs before printing.
Useful Tools Torus Train Ops, a Dispatch Board for Model Railroads torustrainops.com Windows software that turns a model railroad’s industries, rolling stock, and trains into shared operating sessions with digital or printable paperwork.
Useful Tools つくりてラベル: Food Labels for Tomorrow’s Market tsukurite-label.app A Japanese app for small food makers to create, check, arrange, and print legally formatted product labels.
Useful Tools Chalked: Dictation That Knows When You’re Free usechalked.com A Mac dictation utility that checks spoken times against your real calendar before inserting a message or holding an offered slot.
Useful Tools Variable Data PDF Turns Spreadsheets into Print-Ready PDFs variabledatapdf.com A browser-based merge tool that converts CSV data and a fixed PDF template into numbered tickets, badges, certificates, or personalized mailers.
Useful Tools Vendor Almanac: software pricing with receipts vendoralmanac.com A comparison guide that records what vertical-software vendors actually charge, with source links, pricing terms, and check dates.
Useful Tools Weipawn, a bilingual chess terminal for the browser weipawn.net A browser chess client for rated and casual Lichess games, puzzles, chess TV, and offline sparring against a built-in engine.
Useful Tools Z Music Labs: Five Focused Tools for Musicians zabbmusic.com An independent Thai audio software studio making Windows tools for karaoke, lyric timing, AI stem separation, MIDI sound emulation, and video overlays.
Useful Tools Excel 一键式工具 Keeps the Spreadsheet on Your Machine excel-accesstant.asia A Chinese-language, no-install Windows utility for everyday Excel work, including table completion, comparisons, batch file naming, Excel–Word conversion, email distribution, number extraction, report styling, and function lookup.
Useful Tools exitPlan turns a home walk-through into an escape plan exitplan.today An AI-assisted emergency-planning tool that analyzes short room videos and produces escape routes, hazard zones, prioritized tasks, and a home inventory.
Useful Tools MiMenu, the QR menu that changes with dinner service mi-menu.online MiMenu lets restaurants manage a phone-editable QR menu with timed specials, photos, allergens, multiple languages, and WhatsApp ordering.
Useful Tools PDF Booklet Maker pdfbookletmaker.com A free browser tool that turns ordinary PDFs into print-ready saddle-stitch booklets.
Useful Tools Someday turns your reading pile into an audio queue readsomeday.com A local-first iPhone app that gathers articles, PDFs, screenshots, and selected Gmail newsletters into a distraction-free reading queue or offline audio library.
Useful Tools Stokd turns one restaurant stock count into the week’s paperwork shop-stokd.com A restaurant operations tool that turns an evening stock count and a QR-code clock-in into order lists, prep tasks, shop runs, checklists, and timesheets.
Useful Tools Güneş Alır mı? A Sunlight Check for Turkish Homes gunesalirmi.com A free Turkish-language simulator that estimates when and how far sunlight enters a room.
Useful Tools Local Recall, a watchlist for the things you eat and take localrecall.org A searchable feed of food, medication, and medical-device recalls reproduced from official FDA and USDA notices.
Useful Tools Windshift turns sailing logs into replayable fleet races windshift.org A free, nonprofit platform for uploading sailing tracks, replaying races, and comparing vessels using wind, speed, polar, and fleet data.
Useful Tools Sawady’s Work+: A Neighborhood Tool Library workplus.club A Yokodai membership service lending tools and surplus building materials while offering DIY advice, delivery, and renovation second opinions.
Useful Tools Agentomics Counts the AI Shopping Traffic WooCommerce Misses agentomics.dev Agentomics measures AI-agent visits and purchases for WooCommerce stores, separating confirmed, likely, and unattributed revenue.
Useful Tools almi — Compare Everything for Your Healthspan almi.life A Singapore-first comparison platform for longevity supplements, food, testing, gear, recovery services, coaches, and clinics.
Useful Tools AXITRUE — Pre-Rotation Field Capture axitrue.com A specialized field-capture tool for documenting machinery alignment before a shaft’s first rotation.
Useful Tools BANTOU, a back-office cloud for secondhand shops bantou.works A Japanese store-management system that records the full buying workflow, from paper application forms and identity checks to inventory, wholesale settlement, and gross-profit calculation.
Useful Tools Bole Builds Software That Earns Its Place bole.company Bole is an independent software company developing focused products, including Auditor Workbench for structured audit workflows and SITRA for privacy-minded online spending controls.
Useful Tools Held: booking software that makes the deposit the booking bookheld.app Held gives professionals a shareable booking page where clients choose a package and time, then pay a deposit to hold the date.
Useful Tools BrandRootMap Maps the Parents Behind Familiar Brands brandrootmap.com An independent ownership-research database linking brands to parent companies, conglomerates, categories, and alternatives.
Useful Tools BridgeDrop: File Transfer Without the Upload bridgedrop.app A peer-to-peer desktop app for sending files directly between machines, without cloud storage or an account.
Useful Tools Cascadia, a construction intelligence workbench cascadia.build Cascadia turns construction WIP, job-cost, cash, forecast, operations, and licensing records into management reports with source-level review.
Useful Tools Folio, the notebook that teaches back createafolio.com Folio turns teaching notes into interactive lessons that students can explore, manipulate, and quiz themselves on.
Useful Tools Cut & Stack PDF Keeps the Guillotine Piles in Order cutandstackpdf.com A free browser-based PDF imposition tool for arranging tickets, invoices, coupons, flashcards, and other sequential items into cut-and-stack sheets.
Useful Tools Dandelion, the private diary for at-home aesthetics dandeliondex.com A phone-based planner for logging microneedling, peels, and other treatments with maps, photos, intervals, inventory, and spending insights.
Useful Tools D-You — A reality check for aspiring college athletes dyou.pro D-You compares football and basketball players aged 13–18 with past high-school athletes who went on to play college sports.
Useful Tools EarlyCardIndex Puts Rookie-Card Prices Under a Microscope earlycardindex.com A live index of graded rookie and early-career cards, showing current listings across players, sports, cards, and grades.
Useful Tools Faith in Common — What Do You Actually Believe? faithincommon.com A doctrinal self-assessment that compares your stated convictions with the official teachings of 21 Christian traditions.
Useful Tools Flow Route, a Grocery-Store GPS for Shoppers flowroute.tools A route-building tool for grocery delivery drivers that turns shopping-list scans into walking routes and tracks trip performance.
Useful Tools Gardoa, a shared childcare calendar with fewer places to argue gardoa.net A French coordination tool for parents, co-parents, grandparents, nannies, and other caregivers sharing childcare.
Useful Tools Inventura keeps a paper trail for every medical device inventura.app Inventura is a Slovenian-language traceability system for ambulances, laboratories, and other healthcare institutions.
Useful Tools Jigeumyo Turns Korean Internet Chatter Into Calculators jigeumyo.com A Korean-language collection of quick calculators, rankings, lookups, tests, and shareable curiosities built around whatever is currently drawing attention.
Useful Tools LeafRoute Makes Melbourne Walks Less Brutal leafroute.org A Melbourne walking planner that compares routes by shade, noise, comfort, crowd levels, speed, and estimated emissions—not distance alone.
Useful Tools ResidencIA, the guard-duty co-pilot for Mexican medical residents miresidencia.app A clinical workflow platform for Mexican residents that organizes IMSS/NOM-004 notes, handoff censuses, pending tasks, clinical scales, and lab capture.
Useful Tools Mismedidas: the cup is not always the same cup mismedidas.com A Spanish-language browser tool that converts cooking quantities between cups, grams, millilitres, ounces, and more by ingredient and cup type.
Useful Tools MotionRules: A Shared Language for Motion Design motionrules.com A connected motion-design workflow for defining motion tokens, auditing Lottie files, and generating compliant animation in After Effects.
Useful Tools My Long Letter: A Gift for Your Parents' Stories mylongletter.com A $49, three-month service that helps parents turn up to 10 spoken life stories into editable written stories, with Word and PDF export.
Useful Tools Offsetcheck — Keeping the Bankers Honest offsetcheck.com An independent mortgage-auditing tool that recalculates daily interest and offset-account benefits from uploaded statements.
Useful Tools VINcheck Reads the Japanese Chassis Numbers Other Decoders Reject openvin.org A free VIN and JDM chassis-number decoder for vehicle equipment, recalls, complaints, and fuel economy.
Useful Tools Perch Puts Roku Remote Controls on the iPhone perchremote.com Perch is an iPhone remote for Roku players and Roku TV models, with controls available from the Home Screen, Lock Screen, Control Center, Action button, and Siri.
Useful Tools Pfotenwetter: A Rain Radar for the Next Dog Walk pfotenwetter.com A German rain radar that helps dog owners find a dry two-hour window for going outside.
Useful Tools PureSipSpring Draws a Line Between Filter Claims and Certifications puresipspring.com A reference and lookup tool for water-filter certifications, cartridge compatibility, vessel sizes, and filter-life estimates.
Useful Tools Rainline maps the weather across Czechia and Slovakia rainline.app A personal weather map combining live rain radar, temperature layers, animated wind, air quality, and detailed forecasts for towns and villages.
Useful Tools ReturnSignal Keeps Amazon Returns Accountable returnsignal.tech A returns workflow for Amazon FBM sellers that captures inspection evidence at the dock and assembles versioned PDF and ZIP packets.
Useful Tools Saddle Stitch PDF, the booklet-folding translator saddlestitchpdf.com A free browser tool that rearranges ordinary PDFs into printer’s spreads for folded, stapled booklets.
Useful Tools ScamClues turns suspicious messages into evidence scamclues.com A public-beta checker for suspicious emails, texts, links, and screenshots.
Useful Tools SessionFlow, a song tracker for the Mac session-flow.app A Mac app that moves songs from voice memo to final master across a customizable production board.
Useful Tools ShipOrDie.lol Puts Real Money Behind Indie-Maker Deadlines shipordie.lol A public accountability board where indie makers stake $25–$2,000 on shipping a product by a stated date.
Useful Tools SPAC Pulse, a Rights-and-Filings Desk spacpulse.com An open dashboard tracking SPAC rights, filings, deal stages, and estimated close odds.
Useful Tools Stackwise, a supplement interaction checker stackwiseapp.net A free, no-signup checker that maps interactions among 53 supplements and 20 prescription medication classes.
Useful Tools StayKeto, the restaurant-ordering playbook for keto eaters stayketo.app A free app that gives keto users specific orders at 25+ restaurant chains, tracks daily routines, and calculates a Glucose Ketone Index from logged readings.
Useful Tools Strength Director: an Arabic Film Studio Inside FiveM strengthstudio.org A browser-based preview of an Arabic-language cinematic directing and filming tool for FiveM.
Useful Tools Study Stream Turns Downloaded Courses Into a Study Desk studystream.online A free Windows app organizes downloaded course folders into a searchable library with resume points, timestamped notes, quizzes, and lesson-aware AI.
Useful Tools VOLTA QoS Turns Internet Complaints Into Evidence voltatech.africa A connection-measurement tool for testing real-world FTTH and WiFi quality across débit, latency, jitter, packet loss, and estimated voice quality.
Useful Tools Weekshape Gives Your Week a Shape weekshape.com A no-account time-planning tool where you sculpt each day as draggable blocks, with sleep defining the usable space.
Useful Tools Woodin Creek Wayfinder woodincreekmap.com A resident-made map that helps visitors find apartments, buildings, shops, restaurants, and parking at Woodin Creek Village in Woodinville, Washington.
Useful Tools 夜中マップ: A Map for the Hours After the Last Train yonakamap.com A Japanese city map for finding places to spend time after the last train, without deciding on a category first.
Useful Tools Add Bleed to PDF addbleedtopdf.com A browser-based prepress utility that extends PDF page artwork into a print bleed without altering the original trim edge.
Useful Tools Ads-Monitor: The Traffic Light for Ad Spend adtrackd.com A German-language service that turns Google, Meta, and TikTok advertising data into a weekly plain-language report with green, yellow, or red status signals.
Useful Tools AllThatStrat, a Season Planner for Drawing the Training Curve allthatstrat.com A desktop-focused sports season planner for arranging weeks, phases, races, and training volume across multiple sports.
Useful Tools BarLog, the cocktail app that refuses to use stars barlogapp.com A Korean-language app for recording cocktail bars and drinks, then building personal rankings through pairwise comparisons instead of star ratings.
Useful Tools Bates Numbering, Explained and Applied Correctly batesnumbering.com A plain-language legal reference paired with a free browser tool for stamping sequential Bates numbers onto batches of PDFs.
Useful Tools Bates Number a PDF Online batesnumberingpdf.com A browser-based tool for stamping sequential Bates numbers onto one PDF or an entire document set.
Useful Tools Beam HTML Makes the Whole Call Follow Your Slides beamhtml.com Beam HTML lets presenters upload a single HTML deck and share a live viewer link so everyone follows the presentation in sync.
Useful Tools BPMKEY, a Browser-Based Song Analyzer for DJs bpmkeypro.com Upload audio files to estimate BPM, musical key, Camelot key, energy, danceability, and happiness.
Useful Tools CaptionKite Keeps Video Captioning in the Browser captionkite.com A free browser-based tool that turns local video or audio into SRT, VTT, and TXT caption files without an account.
Useful Tools Raid Speed Calculator champspeed.com An unofficial fan-made calculator for planning champion turn order in Raid: Shadow Legends.
Useful Tools Chaotic Toolbox’s FIREPath chaotictoolbox.com An independent Apple software studio’s retirement-planning app, built to replay plans through complete historical market cycles.
Useful Tools Cmdry, a small-utilities workbench cmdry.live Cmdry is a self-hosted web workbench for formatting text, converting data, generating values, and inspecting a server locally.
Useful Tools Corps, the scheduling desk for volunteer sports leagues corpsscheduling.com Corps coordinates umpires, field crews, concessions volunteers, shift coverage, and payroll-ready hours for youth sports leagues.
Useful Tools CourtAction Records Your Padel Match Without Making You Touch Your Phone courtaction.app A Turkish-language service for recording padel and tennis matches: scan the QR code at the court, choose a duration, play, and watch the finished video afterward.
Useful Tools curlswap turns curl commands into code for eight languages curlswap.pro A browser-based converter that transforms curl commands into equivalent Python, JavaScript, Node.js, Go, PHP, Java, C#, and Rust code.
Useful Tools CustodySplit Turns Co-Parenting Arrangements Into Calendars custodysplit.com A co-parenting app converts plain-language schedules—such as “2-2-3” or “every other weekend plus Wednesdays”—into shared calendars with rotations, holidays, exchanges, and one-off swaps.
Useful Tools Desktools.run: 21 Utilities on Your Desk desktools.run A browser-based collection of free utilities for PDFs, images, text, developer tasks, conversions, and security.
Useful Tools Docuivo — Private Paperwork Without the Account docuivo.com A browser-based toolkit for creating invoices, quotes, receipts, purchase orders, and other business documents as downloadable PDFs.
Useful Tools DragGap Turns Car Specs Into a Head-to-Head Drag Race draggap.com A live 1 km car-racing simulator compares acceleration, quarter-mile times, gaps, and telemetry estimates across thousands of vehicle configurations.
Useful Tools ELCAMOSO Gives Electric Cars a Soundtrack elcamoso.com ELCAMOSO is a motion-responsive sound system for electric cars, with selectable sound collections ranging from Motorsport and Aviation to Nature and Playful.
Useful Tools Folio Signals Measures Which Pages Hold a Customer’s Attention foliosignals.com A privacy-focused PDF analytics tool that turns shared documents into tracked browser readers with account-level attention and intent signals.
Useful Tools A Seven-Test Checkup for Your Touchscreen freetouchscreentest.com FreeTouchscreenTest.com is a browser-based diagnostic suite for checking touch support, gestures, accuracy, dead zones, latency, and scrolling.
Useful Tools Friction Tamer: two small detectives for Windows friction frictiontamer.com A focused software site offering Excel Link Detective for finding broken workbook references and Folder Space Detective for tracking down disk usage.
Useful Tools gantt-to keeps the Gantt chart alive gantt-to.work A project-planning tool that lets an AI agent create and continually update a Gantt chart through one HTTP call.
Useful Tools GearClue Turns Local AI Hardware Into Arithmetic gearclue.com A Korean site of calculators, comparison tables, and measured notes for choosing hardware for local LLMs and development.
Useful Tools Blobby, the anti-doomscrolling quiz getblobby.com A browser extension that interrupts TikTok, Instagram, YouTube, X, Reddit, and other scrolling sessions with one bite-sized question.
Useful Tools SignalFront Finds Construction Opportunities Before They Become Leads getsignalfront.com SignalFront turns public construction, permitting, property, and contractor signals into ranked commercial opportunities for service businesses.
Useful Tools GetThePics, for the photos that would otherwise disappear getthepics.com An event photo collection tool where guests scan a code, add pictures without an app or account, and send them to a shared album and room display.
Useful Tools Yahora: a bilingual front desk for busy Miami shops getyahora.com Yahora pairs a done-for-you business site with English-and-Spanish missed-call text-back and booking-question coverage.
Useful Tools GroundRules: Safety Talks for Serious Sites groundrulestechnologies.com A regulator-aligned toolbox-talk system for construction, infrastructure, and industrial crews, with location-specific and site-specific safety content.
Useful Tools HARANEL Turns Customer Harassment Into an Organizational Record haranel.com A Japanese cloud service for documenting customer-harassment incidents, preserving evidence, tracking responses, and coordinating escalation across an organization.
Useful Tools Hashi Puzzle: Bridges Without Guessing hashipuzzles.com A free browser-based Hashi puzzle generator with 7×7 through 15×15 boards, four difficulty levels, hints, mistake checking, and no account.
Useful Tools Herramientas CR: a practical toolbox for Costa Rica herramientascr.com A free, no-registration collection of Costa Rica-specific calculators and browser tools for work, money, vehicles, students, businesses, and 3D printing.
Useful Tools IC Checker: The Phone-Repair Storage Lookup icchecker.com A free web and mobile tool that identifies a phone board’s storage from the code printed on its eMMC or UFS memory chip.
Useful Tools Influence Line Calculator for Continuous Beams influencelinecalculator.com A free civil-engineering calculator for generating influence lines and envelope curves for continuous beams.
Useful Tools Kamitool, a Small Cabinet of Decision-Making Tools kamitool.com A Japanese-language collection of free browser tools for choosing, calculating, and preparing everyday things.
Useful Tools Mailbrake, the email cooling-off switch mailbrake.com A Gmail tool that delays outgoing messages, checks them for tone and sensitive data, and lets you cancel or rewrite emails before they cause regret.
Useful Tools MarinaCheck: Price-checking the Mediterranean, boat by boat marinacheck.app A free Android app that compares researched overnight marina prices across more than 430 northern Mediterranean marinas, adjusted to a boat's length, width, and draft.
Useful Tools Market Intelligence’s Governed EHS Data Catalog marketintelligence.space A market, compliance, competitor, enforcement, injury, and corporate-activity intelligence platform organized around reproducible data joins.
Useful Tools MemorialProof keeps monument approvals tied to the exact file memorialproof.com A focused approval workflow for monument retailers, where families review a PDF or JPEG and confirm the name, dates, epitaph, granite or color, and layout.
Useful Tools ミセコエ: the QR-to-LINE suggestion box for small restaurants misekoe.com A digital feedback box that lets restaurant customers respond by scanning a QR code, while staff receive urgent requests and daily summaries through LINE.
Useful Tools MixPPM, the hydroponic salt-weight calculator mixppm.com A browser-based hydroponic nutrient calculator that converts elemental ppm and EC targets into precise fertilizer weights.
Useful Tools Mochi, a private photo album for your cat mochi.camera Mochi keeps cat photos, milestones, captions, timelines, and recaps on your phone, with optional private cloud backup and shared family albums.
Useful Tools Monitor Tray Wants Your Screens to Go Darker monitortray.com A Windows system-tray utility that controls supported displays together or individually, including below their normal hardware brightness range.
Useful Tools My Minute Cryptic Turns One Clue Into a Shareable Challenge myminutecryptic.com A no-account tool for writing, publishing, and solving single-clue cryptic puzzles.
Useful Tools MySygnal Maps the WiFi You Actually Have mysygnal.net A free internet speed test with bufferbloat grading, WiFi coverage mapping, mesh planning, and channel advice.
Useful Tools neumascan refuses to guess at the music neumascan.com A beta tool turns photos or scans of printed, monophonic sheet music into editable MusicXML and MIDI-ready notation.
Useful Tools Responder Manual for No More Room in Hell 2 nomoreroominhell2wiki.org An unofficial, searchable guide to No More Room in Hell 2, covering maps, builds, equipment, enemies, achievements, and troubleshooting.
Useful Tools NupPDF: Put a Real Grid on Your PDF nuppdf.com A browser-based tool that rebuilds PDFs with 2, 4, 6, 8, 9, or 16 pages arranged on each sheet.
Useful Tools OneTouch’s Screen-Matching Ledger one-touch.org An Arabic-language tool for finding compatible replacement phone screens across 1,483 models from 12 manufacturers.
Useful Tools Padel League, the weekly court referee padel-league.net A bilingual browser app that organizes weekly padel sessions for four to twelve players, from attendance and fair team draws to timed matches and a shared results card.
Useful Tools Perspective: Four Lines to a Straighter Photo perspectivephotoeditor.com A browser-based photo tool that corrects skewed perspective in architectural, document, and everyday images.
Useful Tools Pesticide Guide Turns Produce Shopping Into a Data Table pesticideguide.online A public-facing guide compares 69 fruits, vegetables, and legumes by pesticide load, Food Compass nutrition score, testing volume, market, and organic-buying recommendation.
Observed 2026-08-22
Useful Tools PontePlacas checks what your solar installation can accept ponteplacas.com A Spanish reference tool for checking, model by model, which batteries, backup features, and local data access options work with an existing solar installation.
Useful Tools A Library for PonyPaper's Custom Herds ponypaper.net PonyPaper Library lets users preview custom pony characters, play their actions, and download individual XML files or zipped groups for a live wallpaper.
Useful Tools Preflight Safe asks the awkward product-safety questions preflightsafe.com A managed catalogue review for Australian ecommerce merchants that flags possible product-safety requirements, evidence gaps, and supplier questions.
Useful Tools QR LapScan: Offline Lap Counting for Charity Runs qrlapscan.com A smartphone app for counting event laps with QR codes, including offline buffering, code validation, and optional workstation linking.
Useful Tools QuotaBar puts Codex’s five-hour limit back on the Mac quotabar.fyi A free, open-source Mac utility that tracks Codex usage and pauses new prompts when the five-hour budget runs out.
Useful Tools Relanceo Gives Silent Quotes a Three-Step Nudge relanceo.site A French-language tool that automatically follows up on unanswered client quotes by email and SMS.
Useful Tools RHTP Radar Maps the Rural Health Funding Maze rhtpradar.com A deadline tracker for Rural Health Transformation Program RFPs, NOFOs, and subawards across all 50 states.
Useful Tools RigMyFish, a Fishing Rig Recommender rigmyfish.com Choose a fishing location and target species to get a rig diagram, gear list, and matched rod recommendation.
Useful Tools RoamStops Wants to Tell Campervans Where They Can Actually Stop roamstops.com A UK-first campervan travel platform combining route planning, overnight-legality research, vehicle-fit checks, and practical stops.
Useful Tools Rock Fishing’s Galicia Conditions Map rockfishing.fun A marine and atmospheric forecast map for shore fishing across Galicia and other Spanish coastal regions.
Useful Tools รอมเหมียว: Thai-language patches for classic games rommeaow.com A Thai game-translation archive and browser-based patching tool for retro ROM formats, including GBA, GBC, GB, SFC, NDS, and BIN.
Useful Tools Rooky Move Finds the Strange Stories in Your Chess Games rookymove.com A browser-based chess archive explorer that searches Chess.com or Lichess usernames for missed mates, comebacks, collapses, blunders, streaks, and other memorable patterns.
Useful Tools Runa, the offline running tracker runa.living An iPhone app that records distance, pace, cadence, steps, and run history without GPS, an account, or a network connection.
Useful Tools Rusheens Games Keeps the Table Busy rusheensgames.com A collection of family table games for phones and kitchen tables, including Sixes, Spot, Niggles, Twenty-Five, and a shared Niggles scoresheet.
Useful Tools Scanlet turns event pages into scannable invitations scanlet.page An event-page builder that creates QR codes for weddings, birthdays, webinars, and conferences.
Useful Tools Scythe, a Gorilla Tag mod manager scythegtag.lol A Windows desktop tool for installing BepInEx, managing local Gorilla Tag plugins, and finding curated mods for SteamVR.
Useful Tools semper Measures Strain with a Phone sempermechanics.com An Android tool that turns speckled photographs into full-field displacement and strain heatmaps for courses and research groups.
Useful Tools SessionGuard Keeps a Mac Session Awake sessionguard.net A macOS menu bar utility that prevents idle sessions from sleeping or locking by making tiny mouse movements.
Useful Tools Shadetree: Car Repair Advisor shadetreerepair.com Shadetree turns an inexpensive Bluetooth OBD-II adapter and an iPhone into a plain-English diagnostic guide for car owners.
Useful Tools Shake, Rattle & Print tunes your Voron shake-rattle-and-print.com A browser-based toolkit that turns Voron printer measurements into Klipper configuration and slicer settings, with a guided assistant for TMC motor-driver autotuning.
Useful Tools FenceQuote Lets Customers Trace Their Fence Before It Exists showmethefence.com A quoting tool lets homeowners trace a fence line on satellite imagery, upload a house photo, preview different fence styles, and receive a price based on the measured footage.
Useful Tools SassaGold Studios’ Three-App Workshop smidja.app An independent studio making privacy-first Android apps for motorcycle trips, awkward excuses, and receipt storage.
Useful Tools Suno Downloader, With a Refreshingly Specific Boundary sunotoolkit.app A Chrome extension that queues and exports Suno tracks as MP3, M4A, or WAV from a user’s library.
Useful Tools Tartib Puts the Gulf Back Office in One Place tartb.com Tartib is an operations platform for Gulf businesses, linking assets, staff, payroll, point-of-sale, loyalty, fleet work, and government paperwork.
Useful Tools TCG Society, a Dutch-Belgian Pokémon TCG radar tcg-society.com A fan-run NL/BE Pokémon Trading Card Game community combining retailer restock alerts, price tracking, release calendars, giveaways, and Discord chat.
Useful Tools TCG Printer Turns Card Pages into Labels tcgprinter.app TCG Printer is a free iPhone workflow for turning supported TCGplayer pages into QR and market-price labels printed over Bluetooth to NIIMBOT D110-series printers.
Useful Tools ThePriceRift Tracks the Riftbound Card Market thepricerift.com A market-data and price-analytics site for Riftbound Trading Card Game sets, cards, characters, and regional prices.
Useful Tools A Water-Treatment Suite That Keeps the Plant Balance Connected totalwaterdesign.com Total Water Design Suite is engineering software for designing connected water-treatment systems, from pretreatment and biological treatment to membranes and zero-liquid discharge.
Useful Tools Trem Alerta watches for open seats on Brazil’s passenger train tremalerta.org A free email alert service that checks the Vale passenger-train portal for vacancies on a chosen route, date, and class.
Useful Tools RIA Wire turns SEC filings into a live prospect list tryriawire.com A paid intelligence product that converts monthly SEC Form ADV filings into cleaned CSV and Excel data on US RIAs managing $100M-$500M.
Useful Tools SpendJar: Pocket Money Jars for Kids usefulparentapps.com A family app that gives children colourful virtual jars for saving and spending pocket money, without requiring a bank account.
Useful Tools nftpad, a pixel-to-Solana NFT workshop usenftpad.fun A browser-based drawing and collection generator for creating, weighting, exporting, and minting Solana NFT collections.
Useful Tools Wakeel, an Arabic-First Operating System for Influencer Managers usewakeel.com Wakeel brings influencer discovery, public profiles, rate cards, deals, Arabic contracts, campaign calendars, and invoice tracking into one RTL workspace.
Useful Tools Wakemeapp: the alarm that follows your calendar wakemeapp.app An Android alarm app that creates recurring alarms from Google Calendar or Outlook events.
Useful Tools Watt per Euro wattpereuro.com A cycling-upgrade calculator that ranks aero, tire, and weight improvements by watts saved per euro.
Useful Tools 造物工坊: One Sentence, One Printable Part zaowugongfang.com A Chinese AI tool that turns a text description or up to three photos into editable, printable 3D models, with STEP and STL downloads.
Useful Tools Ambalaj Dedektifi ambalajdedektifi.com A Turkish label-analysis tool that turns photos of food packaging into allergen, ingredient, nutrition, and unit-price information.
Useful Tools DigiFulfill Automates Lazada’s Digital-Goods Delivery digifulfill.com A fulfillment tool that automatically sends gift cards, game credits, and vouchers to Lazada customers by email and chat.
Useful Tools EO PLACE: A Directory of Final Fantasy XIV Player Venues eo-place.com EO PLACE helps Final Fantasy XIV players discover housing-based bars, cafés, glamour shops, and photography studios by browsing community listings.
Useful Tools FirstStrike OS Turns Storm Tracks Into Sales Leads firststrikeos.com A commercial storm-intelligence platform maps severe-weather events to affected properties, their owners, and outreach lists.
Useful Tools League Predictor footballtablepredictor.com A free fan tool for arranging football league tables and sharing the result as a link or image.
Useful Tools PD Med Navigator pdmednavigator.com A de-identified navigator for figuring out why a prescribed Parkinson’s medication is being blocked by insurance, pharmacy routing, cost, or paperwork.
Useful Tools Shrink Clip Compresses Videos Without Uploading Them shrinkclip.app A browser-based video compressor that targets the file-size limits of Discord, WhatsApp, email, X, and other platforms.
Useful Tools Aurora Tonight: A City-by-City Northern Lights Forecast aurora-tonight.com Aurora Tonight gives US-specific northern lights forecasts with local viewing windows, confidence levels, and GO/MAYBE/NO recommendations.
Useful Tools Dialtruth Gives Call Publishers Their Own Ledger dialtruth.com Dialtruth lets publishers look up what happened to their calls, including connection, duration, outcome, and transfer details.
Useful Tools EQShed: a tiny browser studio for turning takes into WAVs eqshed.com EQShed trims a recording, adjusts its bass, mid, and treble, previews the result locally, and downloads a WAV.
Useful Tools Pocket Ready: an EDC database for specification-minded shoppers getpocketready.com Pocket Ready lets you search, filter, compare, and price everyday-carry gear including knives, flashlights, and multi-tools.
Useful Tools Msg2File Pro Puts a Secret Layer Inside an Office File msg2file.com A local-first app encrypts text, images, videos, and other files, then hides them inside ordinary DOCX, XLSX, or PPTX documents.
Observed 2026-08-22
Useful Tools PontePlacas Checks What Your Solar Installation Can Actually Add ponteplacas.online A Spanish model-by-model reference for understanding whether existing solar installations can accept batteries, backup power, and local data access.
Useful Tools ProbPath Turns Probability Questions into Trees probpath.com An AI-assisted probability-tree generator that models scenarios from plain language, calculates and validates branches, and exports diagrams as PNG, PDF, or SVG.
Useful Tools InkOkay: Proofing Without the Inbox Chase inkokay.com A print-proof review tool that lets shops send PDFs, collect notes, and secure customer approval through account-free links.
Useful Tools QGA Upscaler-Lite Wants AI Art Ready for the Wall qgascaler.com A Windows desktop upscaler and visual QA tool for AI-art sellers preparing large Etsy and Printful prints.
Useful Tools DopplerSim 2.0 dopplersim.site A physics-based audio simulator that re-renders vehicle pass-by recordings under new speed, distance, timing, and emitter parameters.
Useful Tools FocusContrast: The Focus-Ring Geometry Checker focuscontrast.com A free interactive studio for checking WCAG 2.2 focus appearance and APCA contrast.
Useful Tools FreENEXt Wants Your Notes Out of the Silo freenext.app A local-first browser workbench for processing notes and files without uploading them to a FreENEXt account or cloud workspace.
Useful Tools Stonelark Watches the Competition for Indie Brands getstonelark.com Stonelark monitors competitors’ storefronts, ads, reviews, social profiles, hiring activity, and product launches, then turns changes into briefings, battlecards, and alerts.
Useful Tools Mesurato Audits the AI Tool Bill mesuratoapp.dev A German-language dashboard for comparing enterprise AI spending, licenses, and actual team usage across tools such as Copilot, ChatGPT Enterprise, Claude, and Teams.
Useful Tools Nail the Tone — the record's settings, on your amp nailthetone.com A guitar-tone tool that promises amp settings tailored to the song you want to play and the equipment you actually own.
Useful Tools NetFixLab, the network troubleshooter that starts with evidence netfixlab.com A network troubleshooting site that guides visitors from symptoms to tests, fixes, and only then the equipment they may need.
Useful Tools Photoemu, a browser-based editor for PSDs and more photoemu.com A free online photo editor for opening and editing PSD, XCF, Sketch, PNG, JPG, and SVG files without installing desktop software.
Useful Tools Riftstack, an AI-built Riftbound deck workshop riftstack.net An unofficial Riftbound card catalog and deck builder for searching cards, assembling decks, and tracking a collection.
Useful Tools State Receipt — The tax bill hiding in plain sight statereceipt.com A free, anonymous calculator for estimating the full annual cost of government, including income tax, social contributions, VAT, fuel duties, and licence fees.
Useful Tools Valdict Wants to Know If You’re Getting Ripped Off valdict.com Valdict analyzes prices, quotes, bills, and purchases to produce a deal score, fair-price range, and suggested next steps.
Useful Tools VeilOpportu, a Tender-Intelligence Workbench for Francophone Consultants veilopportu.com A French-language SaaS tool that monitors international tenders, extracts requirements from PDF terms of reference, and moves opportunities through a collaborative Kanban pipeline.
Useful Tools MepoCAD: Free CAD Without the Cloud mepocad.com MepoCAD is a free, offline Windows CAD tool for floor-plan work, with parametric walls, doors, windows, multi-story projects, and DWG/DXF compatibility.
Useful Tools Pixel Countdown Turns Any Date Into a Shareable Clock pixelcountdown.com A free countdown timer that creates a live link for any date or time, with timezone-aware display and embeddable pages.
Useful Tools ProtonLoop Turns Prototype Review Into a Spatial, AI-Assisted Loop protonloop.com A review tool for AI-built prototypes, HTML mockups, screenshots, PDFs, and React artifacts, with pinned canvas notes and Claude/Cursor integrations.
Useful Tools MedCodeSearch: A Free Map of Medical Codes medcodesearch.com A free lookup tool for ICD-10-CM, ICD-10-PCS, and HCPCS Level II medical codes.
Useful Tools MSME-connect: WhatsApp for the spreadsheet era msme-connect.com A workflow tool that lets small-business teams update shared Google Sheets by sending ordinary WhatsApp messages.
Useful Tools RefillFit finds the refill that fits refillfit.com A compatibility finder for filters, liners, bags, cartridges, and other replacement consumables for household and pet devices.
Useful Tools RUTA Systems: paperwork for the car-hauling back office rutasystems.com Software for small U.S. car-hauling carriers that assembles and delivers the documents a broker needs before paying for a load.
Useful Tools SoySAGE, a soybean gene-prioritization agent soysage.org A bilingual research tool that ranks candidate soybean genes after GWAS and packages the results for download.
Useful Tools CruiseCaptain Watches Cruise Fares Move cruisecaptain.org A cruise search and price-history tracker that says it monitors fares across more than 52,000 sailings.
04 Developer Corner 111 cards
Developer Corner Torollo turns system-design practice into live Docker infrastructure torollo.app A local-first lab where dragging a database or load balancer onto a canvas creates real Docker containers, networks, shells, and graded architecture exercises.
Developer Corner Veredito: the AI code reviewer that has to prove its verdict veredito.dev An autonomous code reviewer that treats suspected vulnerabilities as accusations and only issues a finding when it can attach reproducible evidence.
Developer Corner BeeEye, a bilingual eBPF window onto the home network beeeye.dev BeeEye monitors traffic on an Ubuntu home gateway, showing devices, processes, packets, alerts, and protocol details through two independent interfaces.
Developer Corner Classic Systems in C danielherby.com Daniel Herby’s hands-on programming books teach C by building real games for the Neo Geo AES, Commodore Amiga, and Game Boy.
Developer Corner Fortress in a Box: Kubernetes Security for Vulnerable Missions fortressinabox.dev An open-source Kubernetes security stack designed for journalists, activists, NGOs, and human-rights organizations with limited security resources.
Developer Corner LedgerBench asks AI finance agents to admit when they are wrong ledgerbench-ad.com An open evaluation harness tests whether LLM agents reconcile messy, multi-source financial data correctly, flag uncertainty, or return a confident wrong number.
Developer Corner Little Owl Code Watches the Architecture AI Can't See littleowlcode.com An open-source, local codebase analyzer that tracks architecture, complexity, dependencies, maintainability, and change impact during AI-assisted development.
Developer Corner RateGrid makes solar math answer to the tariff rategrid.dev An API for current US electricity rates, NEM 3 export credits, solar billing, and battery-dispatch economics.
Developer Corner Shrike — Every test starts with a real bug useshrike.com Shrike turns emailed bug reports into source-backed investigations, reproduced staging tests, and permanent regression checks.
Developer Corner ZlamCon: Break the System System zlamcon.com A pilot practical CTF conference in Lviv built around networks, hardware, AI, firmware, and physical systems.
Developer Corner MyAPIs: A Japanese REST API Test Zoo apis-cloud.net A free, authentication-free REST API suite serving Japanese datasets, generators, and a broad set of HTTP test scenarios.
Developer Corner Cairn OBS, an observability stack without license anxiety cairnobs.com An open-source, Kubernetes-native log aggregation platform combining structured filters, full-text search, dashboards, alerting, multi-tenant access control, and AI-assisted query authoring.
Developer Corner Cairn OBS, a log stack built like a cairn cairnobs.org An AGPLv3, self-hostable observability platform for collecting, searching, visualizing, and alerting on logs.
Developer Corner CBSR, a fail-closed evidence layer for agentic finance cbsr.site An open, versioned register of stablecoin regulation across twelve jurisdictions, exposed through typed tools and a policy engine that refuses to authorize execution.
Developer Corner CursorCast puts a privacy boundary around screen recording cursorcastapp.com A macOS and Windows beta that records across selected displays and applications while masking protected apps in one continuous output.
Developer Corner Dead Index — LOCK deadindex.com A portable visual-query system for searching a closed image or video collect without a training loop.
Developer Corner HOUSE_ROOT — Governed Portability dopenoun.dev A case study about replacing hardcoded repository paths with a fail-safe root resolver, then testing the repair against relocated checkouts and false-green results.
Developer Corner dPanel Brings Docker Deployment Into WHM dpanel.pro A WHM plugin lets cPanel operators review and publish customer Docker Compose applications without giving customers SSH or direct Docker access.
Developer Corner esp-atlas, the datasheet-checked ESP32 picker esp-atlas.com A community-maintained catalog and wizard for choosing ESP32 SoCs, modules, and development boards.
Developer Corner Fabrikode Turns Engineering Work Into Software fabrikode.com An industrial software studio building parametric design, simulation, and documentation tools for manufacturing.
Developer Corner Blackbar — destructive screenshot redaction for macOS getblackbar.com A $19 offline Mac app that detects secrets and identifiers in screenshots, then permanently burns the marked pixels into a fresh image.
Developer Corner GLBForge Wants to Make AI 3D Models Shippable glbforge.dev A local-first pipeline that analyzes, optimizes, and exports AI-generated 3D models for the web, print, and React Three Fiber.
Developer Corner GPAI Ledger, a paper trail for AI training-data disclosures gpailedger.com A public registry tracking EU AI Act training-data summaries for general-purpose AI models.
Developer Corner Ibex Gives DataFrame Pipelines Their Own Language ibexlang.org Ibex is a statically typed language for columnar DataFrame and time-series pipelines, with a REPL, notebook integrations, and C++23 code generation.
Developer Corner Kenward Gives a Household Its Own Private Assistant kenward.tech Kenward is a self-hosted assistant for families or friends, accessed through Telegram with separate private and shared memory.
Developer Corner Kie, the spend-guarded media CLI for AI agents kiecli.com Kie lets terminal users and coding agents generate images and video through KIE.ai while keeping API credentials in the OS keychain.
Developer Corner Last War: A Reverse-Engineered Client Dossier lastwar.tech An unofficial technical investigation of the Last War: Survival Game Android client, covering its cryptography, wire protocol, data formats, and a proposed Go implementation.
Developer Corner Leptris puts a hard ceiling on XML parsing leptris.net Leptris is a pure-C99 XML 1.0 parser with XPath 1.0, SAX streaming, zero required runtime dependencies, and bounded memory allocation.
Developer Corner The LLM Engineering Course That Refuses to Graduate llmengineerclub.com A free, open LLM engineering curriculum with six modules, practical labs, certifications, and locally saved progress.
Developer Corner MCPComp Watches the Authentication Layer mcpcomp.dev A scanner and monitoring tool for OAuth authentication on MCP servers.
Developer Corner Message Like Me Studies the Shape of Your Texting messagelikeme.com A local-first macOS CLI analyzes private iMessage history and gives an agent evidence for drafting replies in your style.
Developer Corner みちよみ: Reading Streets from Coordinates michiyomi.dev An urban-environment API that turns Mapillary street imagery into searchable metadata, machine features, visual observations, and time-based change data.
Developer Corner Mix-O-Tron Gives Music a Verifiable History mix-o-tron.com An open-source C2PA authoring tool for attaching creator, provenance, and licensing information to music and other finished media.
Developer Corner Napstr Wants to Make Music Sharing Private Again napstr.net An open-source desktop app for discovering and sharing music through Nostr and private Tor transfers.
Developer Corner The Ten-Layer Agent Stack newagent.build A hands-on builder for assembling AI agent stacks across harness, model, memory, retrieval, security, observability, and deployment.
Developer Corner OpenAntares Gives Knowledge Graphs a Tamper-Evident Container openantares.org OpenAntares specifies the open .ant format, a streamable container for exchanging knowledge graphs.
Developer Corner openOM Gives Commercial Real-Estate PDFs a Verifiable Data Layer openom.app openOM is an open standard for embedding broker-asserted, hash-verified machine-readable data inside commercial real-estate offering memoranda.
Developer Corner Open Work Protocol Wants Agents to Hand Off the Job, Not Just the Chat openworkprotocol.org An experimental, transport-neutral protocol for moving contracts, evidence, validation, and work history between autonomous-agent providers.
Developer Corner Packvium Makes Cartonization Checkable packvium.com An MIT-licensed 3D cartonization and bin-packing engine for Python, PHP, Rust, and the browser.
Developer Corner PreauthRail carries prior authorization through an API preauthrail.com A healthcare API that validates prior-authorization requests, fills payer forms, assembles FHIR bundles, and tracks submissions.
Developer Corner Promptry, the “Sentry for prompts” promptry.run A local-first observability and testing tool for LLM pipelines that versions prompts, records model-call costs and latency, and runs regression suites in CI.
Developer Corner Quaesitor: a case file for investigating phishing sites quaesitor.dev Quaesitor is building a Chrome extension that traces redirects, captures deceptive pages, gathers domain intelligence, and helps prepare takedown reports.
Developer Corner regtable — one register table, many interfaces regtable.dev A pure C99, no-allocation library that exposes microcontroller state through a serial CLI, Modbus, MQTT, a browser panel, and a typed Python client.
Developer Corner Resesh Puts Your SSH Sessions on Rewind resesh.net A Windows SSH and local terminal client for managing many hosts in tabs, split views, and a searchable session tree.
Developer Corner Shellvana Makes SSH Readable on a Phone shellvana.com An SSH client for iOS and Android that reflows prose for small screens while preserving the exact spacing of tables, diffs, trees, and other column-aligned terminal output.
Developer Corner Sirius Keeps Coding-Agent Knowledge in the Repo siriusmcp.dev Sirius is a local MCP server that turns project architecture, business rules, decisions, and components into git-versioned documentation that coding agents can query.
Developer Corner checkin-client: the health check-in plumbing kit smart-health-checkin.org A browser-based implementation of SMART Health Check-in 1.0 that lets EHRs and portals request verified health information from a patient's app.
Developer Corner SpacePill Gives Every macOS Desktop a Name spacepill.dev SpacePill is a native macOS menu bar utility that labels Spaces with colours, notes, and keyboard shortcuts, then exposes them through a command-line interface.
Developer Corner TermiSec: Clone the repo. Not the risk. termisec.com A guarded macOS terminal that runs untrusted coding-interview repositories inside a disposable, offline virtual machine.
Developer Corner Treacle: The Terminal Stays Home treacle.dev A self-hosted phone interface for reading and controlling coding-agent sessions running on a Mac.
Developer Corner IntentOS Makes Solvers Compete to Fulfill a Declared Outcome tryintentos.xyz IntentOS is an X Layer testnet system where users and agents declare payment, RWA, or portfolio outcomes and competing solvers handle the execution.
Developer Corner Unison: One Contract, One Agreed Number unisonlabs.tech A GenLayer dApp scores contracts against a published ten-point rubric using validator consensus.
Developer Corner Workflow Linter for Jira workflowlinter.com A read-only Jira Cloud audit tool that maps workflows, finds broken paths, and explains how to fix each finding.
Developer Corner AutoOps 天枢, an open-source operations control plane autoops.xin A Go and Vue 3 platform that brings asset management, Kubernetes, logs, alerts, databases, tasks, tickets, and cloud costs into one self-hosted operations system.
Developer Corner Pip puts every dev server in the tray getpip.dev A Windows utility that finds local development servers, shows their ports and Git branches, diagnoses network problems, and safely reclaims build storage.
Developer Corner Goblin Red Turns Agent Plans Into Executable Diagrams goblin.red A free, self-hosted flowchart editor lets people map AI-agent systems as diagrams that orchestrators can read and run.
Developer Corner Hanzo Codes Wants the Agent in Your Repo hanzo.codes A command-line coding agent that works on your machine, uses your files and credentials, and runs your tests against the changes it makes.
Developer Corner Impasto: A Paint App Where Objects Stay Editable impastopaint.com Impasto is a free, open-source raster painting and image editor for Linux, Windows, and macOS.
Developer Corner Kairostamp turns web changes into receipts an AI agent can prove kairostamp.com Kairostamp is a pay-per-call x402 API that checks a public URL or captures a snapshot, returning hashes, HTTP metadata, redirect details, and audit-chain linkage.
Developer Corner liluser puts an AI agent through your app liluser.dev A black-box testing tool sends autonomous agent personas through web apps and reports where they succeed, stall, or encounter agent-hostile design.
Developer Corner Luak Rebuilds Lua for Kotlin Multiplatform luaklang.org Luak is a from-scratch Lua runtime with one embedding API for JVM, Native, JS, and Wasm targets.
Developer Corner myFunction — A Language Server for Google Apps Script myfunction.dev A Chrome extension that brings language-server features and a review-first coding assistant to the Google Apps Script editor.
Developer Corner OpenIMAPD Wants to Be the Small, Honest IMAP Server openimapd.dev An actively developed IMAP4rev2 server written from scratch in C for OpenBSD, with a deliberately narrow scope and strong privilege separation.
Developer Corner p5js.live Turns p5.js Into a Live Performance Instrument p5js.live An open-source browser tool for live-coding audio-reactive visuals with JavaScript, p5.js, shaders, and reusable patches.
Developer Corner PrimeRay Simulates the Sensors That Have Not Seen the World Yet primeray.space PrimeRay generates physics-grounded synthetic data from digital scenes for satellite payload design, algorithm verification, environmental modeling, and AI training.
Developer Corner Remask Keeps the Identity Out of the Prompt remask.dev A local PII-protection gateway that detects and masks sensitive data before AI requests reach an outside provider.
Developer Corner SadaSend Gives AI Agents Email Without the Whole Account sadasend.com A transactional email API and hosted MCP server with scoped keys, recipient allowlists, approval mode, and dry runs for AI agents.
Developer Corner SCORM Central turns ordinary files into inspectable learning packages scormcentral.com A conversion and validation platform that turns PDFs, presentations, documents, and video into SCORM, cmi5, AICC, or xAPI-ready course outputs.
Developer Corner SnippetVeil Puts a Privacy Curtain Around Java Snippets snippetveil.com An IntelliJ IDEA plugin that replaces project-owned names in Java code before you paste a snippet into an AI chat.
Developer Corner TraceStore Makes Agents the Primary User of Observability tracestore.dev An agent-native observability stack with OpenTelemetry ingest, SQL queries, and indefinite retention on blob storage.
Developer Corner TranquilWorks Builds at the Useful Elbow tranquilworks.dev An independent engineering practice developing repairable bench-control hardware, local-first software, and hands-on learning platforms.
Developer Corner Zyron: a Rust database trying to be three systems at once zyron.systems Zyron is an HTAP database engine that combines an MVCC row store, a columnar analytics format, and a peer-to-peer data mesh in one Rust codebase.
Developer Corner Everfetch turns brittle scrapers into stable APIs everfetch.tech Everfetch provides structured APIs for pulling repeatable data from websites, with a catalog of 1,920 public sources and support for REST, Python, TypeScript, and AI-agent workflows.
Developer Corner KICK Reads Football Straight from Broadcast Video projkick.com KICK is a football computer-vision platform that turns broadcast footage into spatial data, tracking players and landmarks for analytics, graphics, and research.
Developer Corner StackResolve, a readiness registry for software agents stackresolve.dev StackResolve audits software products and helps AI agents discover, compare, install, and use them through a registry, REST API, MCP server, CLI, and coding-agent integrations.
Developer Corner 0xBs Makes Machines Billable 0xbs.org A protocol that turns MQTT-connected hardware into pay-per-call APIs for AI agents, with USDC settlement via x402.
Developer Corner AC Reviewer checks the gap between requirements and merged code acreviewer.com A pull-request review tool that checks linked acceptance criteria against diffs, tests, and desktop or mobile browser evidence.
Developer Corner AeonProof Code, a Time Capsule for Source Code aeonproof.dev AeonProof registers a signed, timestamped cryptographic proof that a codebase existed, while keeping the source files on the developer's own machine.
Developer Corner Форпост-проект: security systems on one 3D plan forpost-project.online A Windows application for designing video surveillance, fire alarms, access control, public-address systems, fire suppression, and local networks in three dimensions.
Developer Corner Agent Studio, a Native Workspace for Parallel Coding Agents getagentstudio.dev A keyboard-first macOS workspace for running coding agents across repositories, worktrees, terminals, source files, and reviews.
Developer Corner Huntian Wants to Run AI in Space huntian.dev A Chinese-language platform for designing, simulating, and operating space-based computing systems through a ground-to-orbit digital twin.
Developer Corner IICP, an Open Mesh for Agents That Find Each Other iicp.business IICP is an open protocol for discovering AI providers by capability, routing tasks to healthy nodes, and connecting agents without a fixed platform account.
Developer Corner Latch: the missing sign-in between MCP and ChatGPT latchmcp.dev Latch is an authentication layer that gives an MCP server a URL accepted by Cursor, ChatGPT, and Claude.ai without changing the server's existing API-key setup.
Developer Corner OVERVA’s One-Organization ERP overva.com A Mongolian-language modular ERP platform that combines finance, HR, operations, assets, GIS/GPS, IoT, audit, and analytics in one organization-wide system.
Developer Corner PruebaAI Puts Crypto AI Agents on Trial pruebai.com An independent research site and set of browser-based worksheets for testing crypto AI agents' autonomy, blockchain and token necessity, operating costs, wallet permissions, and public evidence.
Developer Corner VersionPass Makes Each Software Release Show Its Work versionpass.dev A trust record for a specific software version, binding its identity, artifact digests, SBOM, security state, provenance evidence, and vendor statements.
Developer Corner BlockMind Puts Minecraft Server Panels in Chat blockmind.online BlockMind connects AI agents to Minecraft hosting panels through MCP connectors, letting users inspect logs, edit files, change settings, and control servers with prompts.
Developer Corner Bu0y: The OpenAI-Compatible Bargain Router bu0y.com Bu0y routes AI inference requests across competing marketplaces, aiming to fill each request from the cheapest source that can deliver.
Developer Corner Codex Cortex Draws a Boundary Around AI Engineering Work codex-cortex.com Codex Cortex is an advisory governance layer for Codex that contracts tasks, routes workflows, checks material drift, and verifies mechanical claims.
Developer Corner Specter, a terminal built for the whole shift dawnrail.net Specter is a cross-platform SSH, SFTP, and serial terminal for Windows, macOS, and Linux.
Developer Corner DownholeDAQ: A Configurator for Electronics Built to Go Down the Hole downholedaq.com An interactive configurator for downhole data-acquisition boards, covering form factor, temperature, sampling rate, memory, and sensors.
Developer Corner Culprit Finds the Bottleneck Hiding Across the Stack getculprit.dev Culprit correlates browser and server telemetry from the same test run, then produces a ranked performance diagnosis.
Developer Corner Grith Gate, a Machine Handshake for a Three-Door City-State grithgate.com An API-only gate where a machine can request a nonce and submit a JSON citizen card.
Developer Corner JetInfer Makes Repeated AI Prompts Cheaper jetinfer.com An OpenAI-compatible Qwen3.8-27B inference API built for coding agents and assistants, with prefix caching that bills repeated prompt text at one-tenth of the input rate.
Developer Corner MeridianSeal: Making AI-Agent Boundaries Architectural meridianseal.com A bilingual public showroom for a PhD dissertation on governing autonomous AI agents through enforceable system architecture rather than instructions alone.
Developer Corner OpenDocBot Brings Any AI Model Into Office opendocbot.com An open-source Microsoft 365 add-in that lets users bring their own AI models into Word, Excel, and PowerPoint.
Developer Corner OpenLegalCore Wants Legal AI to Show Its Work openlegalcore.org An open-source legal-tech infrastructure project built around traceable sources, bounded automation, and human verification.
Developer Corner Plural Gives Every Browser Tab Its Own Identity pluralbrowser.com Plural is a Chromium-based browser that gives each tab separate proxies, fingerprints, cookies, logins, and persistent identities.
Developer Corner Poketron, the repairable pocket computer poketron.org Poketron proposes an open-hardware computer, power bank, and communications device with replaceable parts.
Developer Corner QA Army Wants to Test the Journeys Scripts Miss qa.army An AI QA product for coding-agent teams that tests critical web, mobile, and desktop user journeys.
Developer Corner rust-ethernet-ip: Reading Logix PLCs Without OPC rustethernetip.com An open-source EtherNet/IP/CIP client driver for reading, writing, batching, and discovering tags on Allen-Bradley CompactLogix and ControlLogix PLCs.
Developer Corner Signals, a security agent for solo founders signalsagent.app Signals is a Korean-language AI security agent that gathers warnings from GitHub, Supabase, Vercel, and code scans in one place.
Developer Corner VibRadar — Security scanning for AI-built sites vibradarsecurity.com VibRadar scans a website’s public surface for exposed secrets, source code, vulnerable frameworks, databases, and other security leaks.
Developer Corner Wayari Gives Hundreds of Coding Agents a Place to Work wayari.com Wayari proposes a Discord-shaped workspace where coding agents write, test, design, review one another’s work, and return production code.
Developer Corner ZeCache Wants to Stop LLMs From Answering the Same Question Twice zecache.com A managed semantic caching API that reuses equivalent LLM responses to reduce provider calls, latency, and cost.
Developer Corner ZedTranslate Gives Zambian Languages an API zedtranslate.com A translation and language platform covering Bemba, Tonga, Nyanja, Lozi, Tumbuka, English, and other Zambian languages, with cultural references and developer access.
Developer Corner ScadaPort turns SCADA migration into an auditable pipeline scadaportconvert.com ScadaPort converts industrial SCADA/HMI projects between Movicon, Ignition, NexaPlant Studio, and related platforms.
Developer Corner EPIC Lab Prints Intelligence Into the Physical World epicweng.com An engineering lab developing electrostatic printing, flexible sensors, E-Skin, and embodied-intelligence systems.
Developer Corner Unit: The Company Is Now Software unitunitunit.dev Unit presents a programmable company runtime for creating, operating, scaling, transferring, selling, or winding down businesses through code.
Developer Corner DownholeDAQ’s Board Configurator downholerecorder.com A specialized configurator for downhole data-acquisition boards, covering footprint, temperature, sampling rate, memory, and sensors.
Developer Corner O3DC Maps the Open Drug-Discovery Benchmark Landscape o3dc.org A community-maintained index for finding, comparing, and discussing open benchmarks used in AI-driven drug discovery.
05 AI Table 34 cards
AI Table Mik Idrizovic’s Archive of AI Premise Failures mikidrizovic.com An independent AI-safety research site documenting how false premises enter, persist, and govern long-horizon language-model interactions.
AI Table On Model: Flat-Lay Clothes, Synthetic Models onmodel.studio On Model turns existing flat-lay, packshot, or ghost-mannequin photos into on-model catalogue images for apparel brands.
AI Table Ketchup — just the sauce addketchup.app A Chrome extension that summarizes YouTube videos when you hover over their thumbnails, extracting key points, numbers, steps, and a watch, skim, or skip verdict.
AI Table Æviterna, the lifelong AI confidant aeviterna.app Æviterna describes an AI confidant intended to stay with one person for the length of a life, remembering routines, concerns, decisions, and personal history.
AI Table Crâne: The Hair Consultation Before the Chair cranehair.com An AI hair consultation from a Los Angeles studio that uses two photos and a sentence to propose four hairstyles on your own face.
AI Table DBS Invenio, an AI control plane for the cloud-unreachable dbsinvenio.com A self-hosted enterprise AI platform for building, governing, metering, and shipping AI applications into cloud, on-premises, offline, and air-gapped environments.
AI Table グチってスッキリ: An AI That Just Listens guchisuki.com A Japanese voice service where users can vent to one of two AI personas without advice, lectures, pep talks, or interruptions.
AI Table 开剪: An AI Editor That Watches the Whole Interview interviewcut.com A Windows desktop video editor that analyzes long interviews, podcasts, courses, and meetings, then proposes hooks and assembles an editable first cut.
AI Table Mino, l’IA qui veut parler au Bénin minoia.org A civic-minded AI assistant for Benin, offering guidance on health, education, agriculture, business, culture, and local languages.
AI Table 묘신당, the cat shrine for AI fortune-telling myoshindang.com A Korean fortune platform combines calculated saju readings, user-drawn tarot cards, and AI interpretations delivered by a cast of cat gods and shamans.
AI Table The Richter Firm's Forty-Five-Test AI Trial therichterfirm.com A controlled comparison of four AI legal research tools across two tasks and forty-five independent evaluations.
AI Table Draftwrangler, the bid workspace with receipts draftwrangler.com A human-in-the-loop AI workspace that turns federal solicitations and commercial RFQ packages into cited requirements, risk registers, compliance matrices, and bid scores.
AI Table Dropboard Turns a Day Into a Single Artwork dropyourday.com Dropboard is a social journaling app where photos, places, songs, runs, thoughts, and polls accumulate into one illustrated record of the day.
AI Table Field-to-Bid turns a site walk into a construction estimate fieldtobid.com An AI estimating tool converts a voice memo and site photographs into a CSI-classified, itemized construction bid.
AI Table Agent: Escrow for AI-Performed Work hivirgil.art Agent proposes to hold buyer funds, verify AI-produced B2B work against a fixed specification, and settle payment row by row.
AI Table Impande, a multilingual WhatsApp companion rooted in South Africa impande.africa Impande delivers daily affirmations, reflections, audio rituals, and conversational replies through WhatsApp in South African languages.
AI Table Open Tag lets Slack jobs choose their own model opentag.bot A Slack AI teammate that routes each @mentioned job to a model chosen by the user, from Claude and GPT to open weights on their own hardware.
AI Table PetPetAgent Wants You to Raise Your AI petpetagent.com A Windows desktop companion that visualizes an AI agent’s growth, edits its markdown steering files, and helps reduce wasted token spend.
AI Table Klaimee Wants to Insure the Things AI Agents Do askklaimee.com Klaimee offers adversarial testing, certification, financial guarantees, and liability insurance for autonomous AI agents.
AI Table DevLoom: production standards for Claude Code devloom.ink A catalogue of 75 reusable Claude Code skills for design direction, frontend engineering, animation, accessibility, conversion, security, performance, and deployment.
AI Table GROKTOR’s AI Gauntlet for Unanswered Diseases groktorbot.com GROKTOR uses one model to propose rare-disease therapies and a separate context to challenge whether they can be built, delivered, tested, or falsified.
AI Table Morphomics and the MorphoScan morphoquant.com Morphomics sells an automated incubator-based imaging instrument and AI software for measuring embryo and organoid phenotypes.
AI Table Teleprompt AI, a calmer studio for the next take telepromptai.app A creator workspace that combines source-linked research, voice-first teleprompting, performance feedback, video editing, and reviewed AI-generated footage.
AI Table Aura AI Visibility Gives Your Website an AI-Readiness Receipt aaivisibility.com A free scanner checks whether AI crawlers can read, understand, and potentially cite a domain.
AI Table Marisol, the bilingual receptionist who answers in two languages heymarisol.com Marisol is an AI receptionist for contractors, construction teams, property managers, and real estate agents.
AI Table Hörsam — Infrastructure should be built on time horsam.com Hörsam is building AI products for Swedish infrastructure permitting, starting with statutory public consultation.
AI Table Otter OS, the Figma agent with a design-language safety rail otteros.space Otter OS is an AI product-design agent that turns natural-language prompts into editable Figma content through a validated JSON Design DSL.
AI Table Traffic Eye Gives Nepal’s Roads a Computer-Vision Dashboard trafficeyenp.com Traffic Eye is developing edge-AI and automatic number plate recognition for vehicle detection, plate reading, alerts, and roadway analytics on Nepali roads.
AI Table RoofPipeAI Turns Commercial Roofing Outreach Into Auditable Fee Events roofpipeai.com An AI-assisted pipeline agent for commercial roofing contractors that finds property opportunities, drafts outreach, books inspection meetings, updates CRM records, and tracks billing evidence.
AI Table Motus brings promptable motion graphics into Resolve motus.build A DaVinci Resolve plugin that turns chat prompts into native motion-graphics clips with editable text on the timeline.
AI Table AI Snapshots Keeps a Record Before It Has Results ai-snapshots.com An independent project plans to track how several AI models answer the same everyday health, money, legal, and civic questions each month.
AI Table Pachtwacht Wants to Run Your Holiday Rentals Without You pachtwacht.com A German-language AI property manager for operators with 5 to 50 vacation-rental listings, handling OTA monitoring, dynamic pricing, guest messages, cleaning coordination, and EU-compliance workflows.
AI Table Nue AI Puts a Button on the Conversation ai-nue.net Nue AI is a hands-free assistant designed to answer through earbuds, smartwatches, clip-on wearables, and a tabletop unit.
AI Table SongToVideo Wants to Give Whole Songs a Visual Timeline songtovideo.app An AI music-video tool that turns an uploaded song into a beat-synced, full-length video preview, with lyric mode and vertical exports planned around the same workflow.
06 Civic & Public Life 66 cards
Civic & Public Life Watch the Gap, Measured in Pixels watchthegap.org An interactive scroll through American wealth and public spending, using one pixel to represent one million dollars.
Civic & Public Life Seats of the World seatsoftheworld.org An interactive historical atlas showing who belonged to twenty international organizations, and when.
Civic & Public Life Lexington's Private Parks lexingtonsprivateparks.com A records-based visitor's guide to 36 privately held Lexington parcels that function as a second, mostly inaccessible park system.
Civic & Public Life Datos del terremoto de Colombia 2026 datosdelterremoto.org An interactive observatory cross-referencing satellite damage assessments, citizen reports, media coverage, population data, and official earthquake balances municipality by municipality.
Civic & Public Life The Mice Map mice.nyc An interactive map of 30,500 actively inspected NYC restaurants, including 8,589 with inspector-recorded evidence of mice.
Civic & Public Life Add It Up additup.org A source-tracked running account of what the 2025 tax law changes in food assistance, health care, taxes, and household income.
Civic & Public Life Kilo — Hawaiʻi, at a glance kilohi.org A proposed island information dashboard that gathers weather, road closures, storms, earthquakes, volcano conditions, tsunami zones, and neighbor reports in plain language.
Civic & Public Life Like a Snowball — Amnesty International UK likeasnowball.com An interactive briefing mapping the UK gender-critical movement, its press coverage, organisational growth, and funding.
Civic & Public Life Haydok Patileri: Beytepe’nin çocukları için haydokpatileri.com Hacettepe Üniversitesi’nin Beytepe Kampüsü’nde yıllardır gönüllülerce bakılan köpekler için yuva, koruyucu aile ve düzenli destek çağrısı yapan bir kurtarma sitesi.
Civic & Public Life DemDevs: Free Software for Democratic Campaigns demdevs.com Volunteer engineers build custom campaign tools for Democratic candidates and political organizations ahead of the 2026 general election.
Civic & Public Life Eat Your Beef Is an H-1B Filing Console eatyourbeef.com A public-data tool ranks employers by how aggressively they use lawful H-1B filing strategies to hold down pay and avoid local recruiting.
Civic & Public Life Third Place — Saint Petersburg 3mesto.org An offline community where people in Saint Petersburg meet through board games, D&D, quizzes, cinema, books, creative activities, and other shared interests.
Civic & Public Life A Family Builds a Landing Place for Eunice ewmkeige.com A memorial and contribution site coordinating services, tributes, photographs, and the return of Eunice Wanjiru Mwangi Keige from Texas to Murang'a, Kenya.
Civic & Public Life The Case for the Islands Trust, Made by an Abolitionist iloveislandstrust.org A heavily sourced argument defending British Columbia’s Islands Trust from someone who wants the institution abolished.
Civic & Public Life Entropy Energy Network Wants to Turn Computing Heat Into Public-Building Warmth makeentropy.com A Mansfield community heat project proposes using a small, flexible computing system to warm public buildings while supporting the regional power grid.
Civic & Public Life One Hour Served turns a workday into direct veteran aid onehourserved.org A transparent veteran-assistance project asks people to donate the equivalent of one hour and pays urgent needs directly to verified providers.
Civic & Public Life Run Salone Is Chasing a National Record runsalone.org A campaign following Sierra Leonean marathoner Efayomi Carr as he tries to close a ten-minute gap to the national record while supporting the country’s running community.
Civic & Public Life Tracing Absence: Soundscapes of Ashura tracinghazaraquetta.org An interactive project documenting Hazara and non-Hazara Shia spaces, ritual soundscapes, and the changing public life of Muharram in Quetta, Pakistan.
Civic & Public Life WearOpen — The Wearable Data Openness Index wearopen.org An evidence-linked index ranking how easily people can access, export, and share data from 10 major wearable platforms.
Civic & Public Life Bogar: La resistencia de los pueblos palafitos en Colombia bogarenlospalafitos.com An immersive journalistic special about three stilt-built communities in Colombia’s Ciénaga Grande de Santa Marta.
Civic & Public Life Fawn Lodge, a Century on the Corner fawnlodge.com A preservation site documenting Fawn Lodge, a 1925 landmark in Fawnskin, California, through its changing occupants, photographs, and local history.
Civic & Public Life Speak Up for Wangwang forwangwang.org A civic-writing tool turns a few personal sentences about online animal-abuse imagery into a reviewable public-comment letter in Simplified Chinese.
Civic & Public Life The Ghana Grain Bank ghanagrainbank.com A proposed national grain-storage and processing campus designed to reduce post-harvest loss, stabilize farm prices, and build a strategic food reserve.
Civic & Public Life GrandPrix de los Pueblos Turns Spain’s Municipalities Into a Permanent Rivalry grandprix.lol An interactive scoreboard for all 8,132 Spanish municipalities, where €1 adds a point to one town or subtracts a point from a rival.
Civic & Public Life Jewmos, Where Melbourne’s Jewish Queer Community Meets jewmos.org Jewmos brings Melbourne’s LGBTQIA+ Jewish community, friends, allies, partners and family together for Shabbat dinners, film nights, workshops, conversations and other gatherings.
Civic & Public Life The La Palma Record: Local Government, With Receipts lapalmarecord.com An independent research project documenting a decade of La Palma, California city governance through public records, court filings, campaign disclosures, and city minutes.
Civic & Public Life Our Elected Portfolios: The Congressional Trade Record ourelectedportfolios.com A readable record of stock transactions disclosed by US House members under the STOCK Act, organized by the date trades happened rather than the date filings were submitted.
Civic & Public Life Peptide Evidence Watch Separates Regulatory Signals from Regulatory Reality peptideevidencewatch.com A U.S.-focused peptide evidence and regulatory intelligence desk tracking FDA and Health Canada actions for consumers and professional operators.
Civic & Public Life Sauvetage Animal Rescue goes where no one else will sarquebec.org A Montreal-area animal-rescue organization carries out technical interventions for animals trapped in trees, on rooftops, in sewers, or on breaking ice.
Civic & Public Life SLC to PC Wants One Trail Through the Wasatch slctopc.org A citizen campaign for a continuous, non-motorized trail connecting Salt Lake City and Park City.
Civic & Public Life 멈춤 콜: 값을 붙인 배달 라이더의 휴식 stoppay.site A Korean policy prototype proposes paying delivery riders for mandatory heat breaks, using weather data and riding records to trigger 20-minute rest periods.
Civic & Public Life READI — Emergency Resource Allocation teamreadi.xyz An interactive San Diego emergency map for tracking household shortages, resource sites, road damage, self-reports, and local redistribution.
Civic & Public Life The Truefield Standard truefieldstandard.com A public, versioned standard for assessing how youth-sports video platforms capture, license, retain, and handle footage of minors.
Civic & Public Life CiteFacts turns scattered public records into citable records citefacts.com CiteFacts republishes public information as structured, provenance-backed records with matching human-readable and machine-readable formats.
Civic & Public Life Gathered Work Makes the Case for Drafts gatheredwork.com An evidence archive for students accused of using AI, pairing institutional academic-integrity policies with guidance for organizing drafts, version histories, and timestamps.
Civic & Public Life The Ownership Map for Independent Dentists independentdentists.net A ZIP-code directory that helps patients distinguish dentist-owned practices from local groups, DSO or corporate affiliations, and unverified offices.
Civic & Public Life Noscopo, a Safety Net for Colombia’s Nightlife noscopo.com Noscopo verifies a guest’s Colombian cédula, records a check-in location, and promises to alert an emergency contact—and eventually authorities—if the user goes silent.
Civic & Public Life Outcharity Turns Ad Placement Into a Giving Contest outcharity.com A public leaderboard lets businesses compete for the top advertising spot by making larger contributions to charity.
Civic & Public Life The Truefield Standard truefieldverified.com A public, versioned scoring standard for how youth sports video platforms capture, license, retain, and handle footage of minors.
Civic & Public Life What Was That Bang? whatwasthatbang.com A live community radar where people report loud bangs, compare nearby observations, and look for a shared explanation.
Civic & Public Life Blood Bank Bangladesh, built for Narail bloodbankbangladesh.com A Bengali-language mobile app connecting blood donors and recipients across Narail and Bangladesh.
Civic & Public Life Commonwealth Index Maps Virginia’s 2026 Congressional Battlegrounds commonwealthindex.com An independent Virginia polling and election-analysis project tracking the generic congressional ballot, battleground House seats, and a Senate race.
Civic & Public Life The Credential Record credentialrecord.com A dated, reproducible register of what public credential registries return when business claims are checked against them.
Civic & Public Life Dirty Dogtown, a One-Neighborhood Newsroom dirtydogtown.news An independent local news feed covering North Little Rock city government, police spending, elections, parks, and community tips.
Civic & Public Life أنا معك: an Arabic digital-safety response network iamwithyou.online ADSJN presents an Arabic-language network for responding to digital blackmail, preserving evidence, and helping remove non-consensual intimate content.
Civic & Public Life ORSIP Maps the Risk Before Public-Investment Conflicts Escalate orsip.site A Peruvian observatory that estimates social-conflict risk around public-investment projects by combining state-management capacity, structural vulnerability, and conflict records.
Civic & Public Life RUBIZH / WAR MAP rubizhmap.com A bilingual interactive map of the war in Ukraine, with frontline history, update notes, map layers, and measurement tools.
Civic & Public Life A Redevelopment Contract Fight, Line by Line sang2office.com Sang2 Office presents a member-facing guide comparing two construction contracts for the Sangdaewon 2 District housing redevelopment association.
Civic & Public Life SBIC Atlas Maps the Small-Business Investment Company Market sbicatlas.com A public-source atlas of SBIC-backed companies, their industries, locations, and congressional districts.
Civic & Public Life Souls of Erode Runs Together soulsoferode.com An Erode-based running community for group sessions, local connections, fitness support, and organized events.
Civic & Public Life Ahimsa Dhyana Mahasabhalu: Five Days of Meditation in Hyderabad ahimsadhyanamahasabhalu.org An official invitation to a free five-day gathering of collective sound meditation, vegetarian living, cultural performances, and nonviolence at Hyderabad’s Exhibition Grounds.
Civic & Public Life A Virtual Museum for Grimsby and Cleethorpes cleethorpesheritage.com A local-history archive of photographs, audio, ephemera, wartime material, docks, people, and places from Grimsby, Cleethorpes, and Northern Lincolnshire.
Civic & Public Life Concord’s Eleven-Point Attempt to Reassemble a Political Conscience concordmovement.org A public-drafting political movement built around a Christian social charter spanning life, poverty, migration, liberty, family, peace, and the environment.
Civic & Public Life The Credential Record, with rules for not overclaiming credentialrecord.org A dated register that records what a credential-issuing body's public registry returned when a business claim was checked.
Civic & Public Life Grith, a City-State With Versioned Locks grithhold.com Grith publishes the current rules and history of a small, machine-readable city-state system.
Civic & Public Life İPAMDER: A Pinyanişî Family Association in Istanbul pinyanisililerdernegi.org The İstanbul Pinyanişililer Aile Mensupları Derneği brings Pinyanişî families together around shared history, cultural memory, mutual aid, and education.
Civic & Public Life Regionalfabrik: A Regional Food Network With Pickup Stations regfab.org Regionalfabrik connects farms, bakeries, processors, members, products, and pickup stations across the Nordhessen–Göttingen–Thuringia border region.
Civic & Public Life 山岳遭難.com: Japan's Mountain Accident Ledger sangakusounan.com A searchable database and statistical dashboard for mountain accidents in Japan, built from police and other public records.
Civic & Public Life SynKinisis Wants to Turn Community Back Into Actual Meetings synkinisis.com A Greek platform for accessible rides, local activities, companionship, and in-person meetings, starting in Attica.
Civic & Public Life Leander School News: Local Reporting for LISD Families leanderschools.com An independent news site covering Leander-area schools, families, and public education.
Civic & Public Life Sakibatiti Football Academy, the Untamed Warriors of Dodowa sakibatiti.com A Ghanaian football club and academy developing young players while building community pathways through sport.
Civic & Public Life Haitians Daily Life — Produire, transmettre, bâtir haitiansdailylife.com A Haitian platform covering local production, youth talent, community projects, and initiatives aimed at building a more self-reliant Haiti.
Civic & Public Life Parli Access Opens Up Cameroon’s Parliament parliaccess.org A civic technology platform for exploring Cameroon’s National Assembly, finding Members of Parliament, following legislative activity, and taking part in public affairs.
Civic & Public Life The PBA Update, Purcellville’s business-life newsletter pbanewsletter.org A weekly-or-so newsletter for people who own, work in, or care about businesses in Purcellville and Western Loudoun.
Civic & Public Life Prothonalo’s Bangladesh gambling-enforcement file prothonalo.com An English-language news site collecting investigations and reporting on online gambling, payment crews, SIM gateways, and financial enforcement in Bangladesh.
Civic & Public Life TheRoofFacts.com Counts the Cost of North Texas Roofs therooffacts.com A local reporting project tracks roofing permit fees, timelines, and project figures from published municipal records.
07 Learning & Exams 25 cards
Learning & Exams Pgnaut teaches PostgreSQL inside the browser pgnaut.com A free, account-free PostgreSQL course with a real Postgres 18 server running locally in WebAssembly.
Learning & Exams Measure of Chance measureofchance.com A first course in probability, built around sixteen chapters, interactive labs, and problems with full solutions.
Learning & Exams Solon Press Teaches Deal Lawyers by Putting the Whole Transaction on the Table solonpress.com Solon Press offers interactive legal workbooks built around complete fictional M&A, finance, venture, and due-diligence transactions.
Learning & Exams The EMS Standard Turns Emergency Calls Into Replayable Classroom Drills theemsstandard.com A dispatch-grade EMS simulator that lets crews train together across monitors, ventilators, medication workflows, patient dialogue, scene displays, and debrief analytics.
Learning & Exams Cataloghaus Turns Music-Business Paperwork into a Curriculum cataloghaus.com An online academy helping independent artists manage metadata, royalties, releases, branding, licensing, and the long tail of a music catalog.
Learning & Exams Cognitive Dynamics Studio’s Four Models of Cognition cognitivedynamicsstudio.com An interactive educational laboratory for exploring four computational visualizations of causal, dialectical, panoramic, and synergetic dynamics.
Learning & Exams Diagnordle — The Daily Medical Diagnosis Puzzle diagnordle.com A daily case-solving game where players read a medical presentation, guess the diagnosis, and unlock clues when they miss.
Learning & Exams Exposure Lab, a camera you can learn from exposurelab.app An interactive camera-exposure simulator that teaches aperture, shutter speed, ISO, focus, depth of field, and metering without requiring a physical camera.
Learning & Exams إنجازي — A Research Platform for Schools and Universities injazi.online An Arabic research-writing platform that guides students from an initial idea to a finished paper.
Learning & Exams Langvie Makes Films into German Lessons langvie.app Langvie turns German film subtitles into vocabulary cards, pairing each word with the line and timecode where it appears.
Learning & Exams Newbie ICU, a Vietnamese library for intensive care newbieicu.com A Vietnamese ICU knowledge library combining 360 structured articles with 29 bedside clinical calculation tools.
Learning & Exams Karotto Turns Coding Into Small Puzzles playkarotto.com Karotto is a multilingual coding-and-logic learning app for young children, built around guided drag-and-drop challenges rather than typing code.
Learning & Exams Pocket Kids Lab: Four Quiet Learning Games pocketkidslab.com A free collection of browser games for learning clock reading, the Greek alphabet, U.S. states, and human bones.
Learning & Exams Little Sprout Learning Quest qceg.site A bilingual interactive classroom journey for children ages 4–8, built around movement, vocabulary, matching games, quizzes, drawing, and a parent showcase.
Learning & Exams TelemView’s high-power AI rack school telemview.space Nevada-based specialist training for data-center manufacturing, electronics assembly, cable harnesses, fiber optics, and electrical enclosures.
Learning & Exams Yiko: Practice the Sentence You Actually Need to Say yiko.app Yiko turns your Chinese sentences into natural English or Cantonese, then lets you practise saying them aloud on your phone.
Learning & Exams 로지음: A Korean Law-School Admissions Studio lawjieum.com A free preparation suite for Korean law-school applicants, combining admissions research, LEET score tracking, personal-statement drafting, and interview practice.
Learning & Exams AffixPath Word Desk, a pocket morphology workshop affixpathworddesk.site An offline Android study tool for assembling prefixes, roots, and suffixes into words, then testing their meanings, parts of speech, and validity.
Learning & Exams RationSquare Feed Lab rationsquarefeedlab.site An offline Android classroom workshop for teaching Pearson-square feed-mixing mathematics.
Learning & Exams تأسيس Lab: Learn, Recall, Advance taseeslab.online An Arabic learning platform that combines interactive reading, general-culture lessons, and memory and focus training.
Learning & Exams Airplane & Rocket Show kajoor.show A bilingual live science masterclass about the physics of flight, rockets, stability, combustion, energy density, and aerodynamics.
Learning & Exams Proof & Principle: Spirits School for the Working Bar proofandprinciple.com A structured spirits academy for bartenders and hospitality professionals, covering whisky, rum, Cognac, Tequila, and related production traditions.
Learning & Exams A Spelling Test That Reads the Words Back spellingtestmaker.com A free browser-based tool that turns a pasted spelling list into an audio test, practice exercises, marked results, and printable sheets.
Learning & Exams 多田野幼稚園: The Kindergarten with a Secret Base tadanoyouchien.com A kindergarten in Fukushima, Japan, built around full-contact outdoor play in forests, mud, rice fields, and snow.
Learning & Exams YKSTercihim.net Turns YKS Preparation Into a Dashboard ykstercihim.net A Turkish YKS exam platform combining TYT and AYT score calculation, a live exam countdown, and a university preference tool.
08 Human Services 11 cards
Human Services ChinaSide: A Human Backup Plan for China getchinaside.com ChinaSide connects visitors and business travelers in China with a bilingual local person who can call hotels, coordinate transport, recover lost items, contact suppliers, and handle practical problems.
Human Services Share With Us, a letter box for difficult problems sharewithus.online A free service where people write about a problem, and a person reads the letter and replies after taking time with it.
Human Services Thābit Wants to Make Spiritual Care Feel Quiet thabitapp.com Thābit is an Islamic emotional-healing app built around adhkar, Qur'an and du'a practices, breathing exercises, journaling, sleep audio, and a listening companion.
Human Services ArtisianGO Turns Beauty Appointments Into Financial Records artisiango.com A marketplace for finding and booking independent beauticians, with revenue summaries, ratings, maps, and rideshare access.
Human Services Accessia turns NDIS referrals into a live availability board accessia.care An Australian NDIS provider network where participants and coordinators can search for available allied health workers, support workers, and coordinators—or post a request and receive responses.
Human Services TalkLore Turns Family Conversations Into Keepsake Books talklore.app TalkLore helps families preserve a relative’s stories through phone calls, written answers, and a finished hardcover book.
Human Services Actually Accepting, a therapist directory with an anti-ghost-listing rule actuallyaccepting.com A San Antonio directory for finding therapists by neighborhood, license, specialty, identity, availability, and logistics.
Human Services HelpFindMyCure.org, a Patient-Controlled Health Knowledge Network helpfindmycure.org A proposed network for connecting one private health case with verified clinicians, researchers, institutions, and AI-assisted evidence.
Human Services 너의빛깔 — A Garden After Goodbye hueou.com A Korean pet-loss aftercare project offering memorial gardens, grief support, online remembrance spaces, and community care.
Human Services Perry Telios Speaks About Gambling Harm perrytelios.com Perry Telios shares his lived experience of gambling addiction with schools, sporting clubs, workplaces, community organisations, and families.
Human Services Qyire Connects the Eating-Disorder Care Pathway qyire.com Qyire is a specialist electronic patient record for eating-disorder services, bringing assessments, physical-health monitoring, risk, care plans, investigations, and multidisciplinary work into one system.
09 Global Trade Desk 9 cards
Global Trade Desk Panacea Intec Builds the Machines Other Companies Sell panaceaintec.com An ODM engineering and manufacturing partner for electrosurgical generators, power transformers, drones, and selected consumer electronics.
Global Trade Desk Longshing, the Motor Factory Inside the Food Machine longshingmotors.com A Taiwan-based OEM/ODM manufacturer of squirrel-cage induction motors for meat grinders, mixers, bone saws, bowl cutters, and other food-processing machinery.
Global Trade Desk World Fashion Jewellery, Mapped worldfashionjewellery.com A free directory of the fashion-jewellery trade, organized by products, materials, segments, countries, manufacturing clusters, brands, and buying guides.
Global Trade Desk BorderDox Turns Invoices Into Customs-Ready Data borderdox.online A cross-border trade tool that extracts commercial-invoice data, checks the numbers, and exports clean CSV or Excel files.
Global Trade Desk 준형 E&S Keeps the Pipes Running While Cutting Into Them jheng2004.com A Korean manufacturer and contractor for hot tapping and line stopping equipment, performing pressurized pipe work without interrupting supply.
Global Trade Desk JENGIEXPOR, Ecuador’s Balsa Story jengiexpor.com A Quevedo-based Ecuadorian exporter offering plantation-grown balsa lumber for composite cores, nautical uses, model-making, and insulation.
Global Trade Desk ManikPola, Sri Lanka’s Brokered Gem Marketplace manikpola.com A Sri Lankan marketplace for Ceylon sapphires, rubies, cat’s-eye stones, and other gemstones, with Sena Manik handling each transaction.
Global Trade Desk Millgate Supply Puts Paper and Chemicals in the Same Container millgatesupplies.com A private-label supplier for janitorial, medical, and catering distributors, combining hygiene paper and cleaning chemicals under one specification, order, and shipment.
Global Trade Desk Silkroot, the China catalog with a suspiciously precise clock getshop4now.com An invitation-only cross-border marketplace promising factory-direct sourcing, audited supplier tiers, and guaranteed shipping lanes to 200+ countries.
10 Food, Events & Hospitality 25 cards
Food, Events & Hospitality Dancehall Seoul Camp: Two Days, Three Battles dancehallseoul.com A Seoul dancehall gathering pairing four workshops, three battle formats, international instructors, and an afterparty.
Food, Events & Hospitality Soundscapes, a Festival Built Around the Tide soundscapes-festival.com An independent five-day music festival on Zanzibar, scheduled for 21–25 January 2027, with long sets, sunrise swims, workshops, shared food, and a participant-built program.
Food, Events & Hospitality A Trout Farm Where the Catch Goes Straight to the Table trucheromanantialdemontana.com Truchero Manantial de Montaña is a mountain trout farm, restaurant, cabin, and camping destination in Cedral de Cajón, Pérez Zeledón, Costa Rica.
Food, Events & Hospitality Museu da Batata Doce: A House Rooted in Rogil museubatatadoce.com A restaurant, 14-room hotel, holiday houses, events venue, and shop built around Aljezur’s sweet-potato culture.
Food, Events & Hospitality Casa Sabarigo, Where the Plan Is to Stop Having One casasabarigo.com A private holiday house in the eucalyptus of central Portugal, with a walled garden, wood-fired oven, secluded pool, and room for six—or twelve at full stretch.
Food, Events & Hospitality ba.eat: Five Chapters of Buenos Aires on Foot foodtourinba.com A Palermo Soho walking food tour about the immigrant histories behind empanadas, choripán, asado, milanesa, ice cream, and more.
Food, Events & Hospitality Giff's Barbecue: BBQ on a Western Film Set giffsbbq.com A veteran-owned barbecue spot in Kanab, Utah, serving oak-smoked brisket, pulled pork, ribs, sandwiches, and homemade sides inside the Little Hollywood Museum.
Food, Events & Hospitality Wines of Kosovo, Bottle by Bottle kosovawinecatalog.com A multilingual guide to Kosovo’s wineries, grape varieties, tasting bands, cellar-door routes, and wine experiences.
Food, Events & Hospitality Masters: Photography, Back in the Room masters.international A Bangkok event series presenting one photographer’s retrospective per evening on a large cinema screen, followed by drinks and conversation.
Food, Events & Hospitality Steve Fest II: Three Days, Three Stages, and a Very Lombard Lineup stevefest.com A free, all-ages music festival at Shannon's Deli in downtown Lombard, Illinois, running September 11–13, 2026.
Food, Events & Hospitality Tiny Film Club — Goa tinyfilm.club A one-day filmmaking event where strangers form small teams and make a tiny film from scratch under time pressure.
Food, Events & Hospitality BUYNEW 白妞鹹酥雞: From One Cart to 15 Stores buynew321.com A Taiwanese fried-chicken brand documenting its journey from a Gangshan food cart to 15 stores across four cities.
Food, Events & Hospitality The Toyosaka Heso Festival, Where Bellies Become Faces hiroshimaheso.site The official site for an annual festival in Higashi-Hiroshima where participants paint faces on their stomachs and compete alongside children’s performances, local arts, food stalls, and vendors.
Food, Events & Hospitality HR10: A Sonipat Road Code Becomes a Cincinnati Sports Bar hr10cincy.com An upcoming Cincinnati sports bar and kitchen named for Sonipat, Haryana’s HR 10 vehicle-registration code.
Food, Events & Hospitality EEKOM: One Loaf, Done Properly eekombread.com A North Phoenix micro-bakery making small-batch sandwich loaves from organic Kamut khorasan wheat for scheduled pickup.
Food, Events & Hospitality Misión Tesoro: A Burger Launch in Maracay invitaciongrancombo.com A Spanish-language invitation page for Gran Combo’s burger-reveal event at C.C. Unicentro in Maracay, Venezuela.
Food, Events & Hospitality Paisa por 24: Medellín tourism with a temporary passport paisapor24horas.com A Medellín tour concept that guides visitors through local neighborhoods, food, slang, and history before issuing a 24-hour “Certificado de Paisa Temporal.”
Food, Events & Hospitality The National Carmagnola Pepper Fair sagranazionaledelpeperonedicarmagnola.com The official site for Carmagnola’s 77th National Pepper Fair, running from 28 August to 6 September 2026.
Food, Events & Hospitality Squirrel Bakery’s Small-Batch Neighborhood Bakes squirrelbakery.net A Pleasant Hill cottage bakery making sourdough, challah, Turkish simit, cardamom knots, and Ukrainian pastries for weekly pickup, farmers’ markets, and special orders.
Food, Events & Hospitality 極禾鍋物: A Hotpot Brand Built Around the Table leeharvest.com A Taiwan-based hotpot restaurant brand with menus, 11 store locations, franchise information, and a journal about soup, ingredients, and the rituals of eating together.
Food, Events & Hospitality LOTCHA SIEMREAP 1991’s Menu, Built for the Street lotchasiemreapmenu.online A Khmer-English digital menu for a Siem Reap lot cha shop, with favorites, filters, currency settings, and an order summary.
Food, Events & Hospitality Ghar Ka Khana, Delivered by Neighbours mamajimeals.app A Miami marketplace for affordable homemade Indian meals from local home cooks, with pickup or delivery and weekly meal plans.
Food, Events & Hospitality Moa View, the wedding cash-gift desk you can outsource moa-view.com A Korean wedding service that staffs the cash-gift reception desk, records contributions, provides live status checks, and handles final reconciliation and handoff.
Food, Events & Hospitality Manna’s Raw Plant-Food Markets in Southern Costa Rica tastemanna.com Manna makes raw vegan meals, desserts, snacks, drinks, catering, and exotic-fruit boxes in Southern Costa Rica.
Food, Events & Hospitality Wildfire Claypot & Grill Brings Open-Fire Claypot Cooking to Kuching wildfireclaypotbbq.com A bilingual Kuching restaurant serving claypot dishes, charcoal-grilled skewers, cooling drinks, and WhatsApp reservations.
11 Commerce Shelf 37 cards
Commerce Shelf Nullpoint Makes Hardware With Nothing Extra nullpointgear.com A Brazilian hardware studio producing a small line of mice, keyboards, and mousepads, plus an in-browser sensitivity converter.
Commerce Shelf Notch & Pass Maps the Smell of the High Country notchandpass.com A Charleston fragrance company making mountain-inspired candles organized around trail scents and named places in six national parks.
Commerce Shelf Kernando, the Flavor Control Division kernando.com A popcorn shop selling four dry-rub flavors seasoned “beyond recommended limits.”
Commerce Shelf Brick Mosaic Studio Turns Photographs Into Buildable Portraits brickms.app A commission service renders a photograph stud by stud, then delivers a build kit with instructions, parts list, frame design, and BrickLink sourcing list.
Commerce Shelf A Mineral Collection, Cataloged Properly collectoria.trade MINERALS combines a curated mineral encyclopedia, a professional stone shop, auctions, private collection catalogs, and AI-powered specimen identification.
Commerce Shelf Forever Impressions Turns Tiny Prints Into Metal Keepsakes foreverimpressionsuk.com A UK service that casts pet paw prints and baby handprints or footprints into hand-finished metal keepsakes.
Commerce Shelf Gravity Station: Rotate the Room, Rescue the Station gravitystation.app A free sci-fi physics puzzle game where rotating gravity moves every loose object in the chamber.
Commerce Shelf Life Filings Turns Births Into IPOs lifefilings.com Personalized, printed, and optionally framed parody corporate filings for births, graduations, engagements, weddings, and retirements.
Commerce Shelf The Million Nickel Page millionnickelpage.com A fixed 1,000 × 1,000 pixel canvas where visitors buy space for five cents per pixel and upload or draw what goes there.
Commerce Shelf Printsurf: Lamps First, Parametric Forms Second print-surf.com A monthly club for print-tested parametric lamp and object files, with open-shelf downloads and member-only design drops.
Commerce Shelf RAYO Turns Your Photos Into Wood rayograbado.com A Costa Rican maker converts uploaded photos into laser-engraved wooden portraits, keepsakes, signs, and gifts.
Commerce Shelf Ruby Calloway — Grandma Never Wrote Hers Down rubycallowaybooks.com A 66-page Appalachian kitchen book collecting Eastern Kentucky recipes, make-do methods, food traditions, and blank pages for writing down family recipes.
Commerce Shelf ShadowPhones, a one-phone-at-a-time GrapheneOS shop shadowphones.com ShadowPhones sells individually photographed, graded Google Pixel handsets rebuilt with GrapheneOS.
Commerce Shelf Tale For Me Puts a Child Inside the Story taleforme.com A personalised children’s book service that turns a child’s name, interests, family, pets, and life moments into an illustrated digital story.
Commerce Shelf Zero Day Armory’s Cyberpunk City in Miniature zerodayarmory.com A grey-resin and STL miniature range for the Root Access 2046 cyberpunk tabletop wargame.
Commerce Shelf BARIST'ALL Wants to Be Your Entire Bar baristall.com A French countertop machine that presents itself as an automatic barista and bartender for coffee, matcha, sparkling drinks, cocktails, and mocktails.
Commerce Shelf CANAY, the chew shop with a firmness taxonomy canayus.com CANAY sells silicone chew tools for babies and children, organizing 19 listings across six firmness bands and four shapes.
Commerce Shelf Fioretto Measures the Things a Leather Catalog Usually Waves Away fioretto.net A 136-page catalog of leather gloves, work totes, backpacks, gym bags, and belts, organized around sizing, materials, use cases, and retailer ratings.
Commerce Shelf KCX Sri Lanka Puts Car-Care Chemistry on the Measuring Cup kcxsrilanka.com A Sri Lankan supplier of Koch-Chemie detailing products for detailers and body shops, with 214 products organized by job rather than jargon.
Commerce Shelf Mei Zan Hao, Tea with a Mountain Address meizanyunnan.com A small-lot Yunnan tea shop offering spring raw Pu-er from the Bingdao and Laobanzhang tea areas.
Commerce Shelf Pados puts the kirana inside the society on your phone padoss.com A delivery platform for gated societies in India that lets residents order from the neighbourhood shop already inside their building complex.
Commerce Shelf Truckfish Games Lets You Try the Thinking Before Buying the Game truckfishgames.com A solo-developer storefront for small, systems-driven Windows games with free browser samples, DRM-free downloads, and a weekly release pass.
Commerce Shelf The Barlow Almanac amosbarlow.com A $47 illustrated ebook collecting 78 old household, garden, kitchen, repair, and money-saving systems across ten parts.
Commerce Shelf Lot & Leaf, a Botanical Apothecary with an Evidence Key lotandleaf.com A botanical shop and modern herbarium that identifies plants by scientific name, tracks sourcing by lot, and distinguishes traditional use from research evidence.
Commerce Shelf ZÖLD FLIESEN Makes the Toilet Flush Plate Disappear zoldfliesen.com A tileable WC flush plate that can be covered with the same tile, stone, or other surface material used on the bathroom wall.
Commerce Shelf Chirne Makes Greeting Cards That Say It Properly chirne.help An Orlando letterpress shop sells 12 hand-drawn greeting card designs, printing each buyer’s message inside on thick cotton paper.
Commerce Shelf Cyclonis — Bike Bags Built for Bad Weather cyclonis-bag-cycle.com A French product site selling welded-PVC bicycle panniers in 10-litre city and 20-litre touring versions.
Commerce Shelf 공사마켓: construction materials without the phone haggling gongsamarket.com A Korean online marketplace for gypsum board, lumber, ceiling materials, plywood, MDF, and construction supplies.
Commerce Shelf YAP: one phone, fourteen ways to wreck the quiet haosgames.com HAOS Games is building a local party-game pack where one phone runs 14 games for 2–15 players.
Commerce Shelf Jerky Crisp, the Mile-80 Ration jerkycrisp.fit A zero-prep endurance bar made from dry-cured prosciutto, dehydrated sweet potato, chia, and celery powder.
Commerce Shelf Maskarne Makes Batch-Tracked Beef Burgers for Dogs maskarne.com A Santiago-delivery dog-food shop selling cooked, frozen 150-gram beef burgers made from beef, carrot, and oats.
Commerce Shelf Mitten City TCG: Find Us Behind the Table mittencitytcg.com A Michigan trading-card vendor selling vintage Pokémon, modern sealed product, graded sports cards, and other collectibles at shows and from a Detroit shop.
Commerce Shelf obelisk.rar, a clothing archive disguised as an operating system obelisk-archives.xyz A clothing store and lookbook presented as a desktop-style archive, where garments become files, releases become directories, and objects remain indexed after leaving circulation.
Commerce Shelf Tarandis Wants to Make Cleaning Robots Rentable tarandis.com A German marketplace that compares autonomous cleaning robots, estimates facility needs, and matches buyers with DACH suppliers.
Commerce Shelf Your Face on Wood Turns Photos into Tiny Engraved Gifts yourfaceonwood.com A $7.99 service that converts a photo into a four-inch laser-engraved wood portrait, with shipping included.
Commerce Shelf MeasureCord Turns an Extension Cord Into a Measuring Tool measurecord.com MeasureCord is an extension cord with a measurement scale printed directly onto its jacket, presented as a product concept for licensing and manufacturing partnerships.
Commerce Shelf Ritual Eight, the Adjustable Safety Razor ritual-novara.com Ritual Eight sells a reusable double-edge safety razor with eight numbered settings, a protective case, blades, and optional matching accessories.
12 Content & Blogs 89 cards
Content & Blogs The Jug Handle: Important Reporting on Things of Questionable Importance thejughandle.com A Morris County, New Jersey humor publication investigating roadside anomalies, suburban mysteries, and other matters no reputable newsroom would pursue.
Content & Blogs Ancestral Wisdom Daily, from Book Six of the Florentine Codex ancestralwisdom.app A daily publication of Mexica counsel from the huehuetlahtolli, presented with Nahuatl transcription, English rendering, and an archive of past passages.
Content & Blogs Robots, Up Close: Beijing 2026 chinarobomap.com A field archive of the 2026 World Robot Conference in Beijing, cataloguing exhibitors, products, industry categories, and onsite observations.
Content & Blogs Debut Day Gives One New App the Whole Day debut.day A daily editorial archive that spotlights one first-release mobile app, explains why it matters, and links readers to download it.
Content & Blogs Anchor Forest, an archive of failed quant hypotheses anchorforest.com A Korean research journal about testing stock-market signals, data pipelines, automation, and local-LLM systems.
Content & Blogs The Pay-to-Rank Clone Census bidfeed.lol Bidfeed.lol catalogs 243 copycat leaderboard sites spun out of the outbid.lol pay-to-rank concept.
Content & Blogs LaoWai Lingo Explains the Chinese Internet cnslang.com An English-language dictionary of Chinese internet slang, memes, buzzwords, and the cultural context behind them.
Content & Blogs The Gem Sea Journal gemseajournal.com A fictional economic weekly for Stardew Valley, tracking crop, livestock, crafting, and farm-investment prices across the Ferngill Republic.
Content & Blogs NOBODY, a memoir by Maximus Sego maximussego.com A memoir site about discovering, at age forty, that the woman who raised Maximus Sego was his grandmother—not his mother.
Content & Blogs Mount Tabor, One Mountain and 1,030 Stories mounttaborgalilee.com A source-based history and pilgrimage portal about Mount Tabor, assembled by local historian Dror Alon.
Content & Blogs QuietHike — Software Price Changes, Caught and Verified quiethike.com A weekly tracker of software price changes, from shrunk free tiers to renamed plans and quietly expired promotions.
Content & Blogs Tesla Graveyard: The Products Tesla Buried teslagraveyard.com A memorial archive of 34 Tesla vehicles, energy products, hardware items, software features, and services that have been discontinued, cancelled, or quietly deleted.
Content & Blogs Tip Creep Tracker Keeps the Receipts tipcreeptracker.com A source-linked archive documenting unusual tip prompts at self-checkouts, kiosks, retail counters, and other unexpected places.
Content & Blogs Torah and Quran Comparison: The Same Stories, Side by Side torahqurancomparison.com A reading edition that places the Torah beside the Quran’s accounts of shared stories, with verse references, comparison tables, and full quoted passages.
Content & Blogs Un Français en Italie, Without the Postcard Filter unfrancaisenitalie.com A French resident of Italy explains the country’s everyday codes, rituals, contradictions, places, and practical systems to French readers.
Content & Blogs The Rough Math — One Business a Day, With the Numbers theroughmath.com A daily analytical project that takes apart businesses using sourced figures, estimated margins, and an explicit verdict.
Content & Blogs Ancestral Wisdom Daily, from the Florentine Codex ancestralwisdomdaily.com A daily publication of Nahuatl passages from Book Six of the Florentine Codex, paired with contemporary English renderings and a library of earlier entries.
Content & Blogs Cathay Codex, a Source-Aware Atlas of Zhong Kui cathaycodex.com An independent visual atlas connecting Black Myth: Zhong Kui gameplay and promotional material with Chinese mythology, historical art, and cultural context.
Content & Blogs Chinese Indie: A Source-Linked Directory of Chinese Indie Projects chineseindie.com A Chinese-language catalog of independent developers’ software, experiments, tools, and playable games.
Content & Blogs 股价复盘 closewhy.com A multilingual archive of sharp stock-market moves across seven markets, 43 companies, and 578 key moments.
Content & Blogs The Measured History of CS2’s Meta cs2metahistory.com An archive of Counter-Strike 2’s Active Duty map pools, professional meta, and 194 Valve updates since the game’s launch.
Content & Blogs Cyberdelia Skunkworks Is Building a Public Workshop cyberdeliaskunkworks.com An experimental research and reference archive spanning astrophysics, robotics, AI, programming, engineering, interviews, fabrication, and book production.
Content & Blogs Elegant Gentle Rider: The Mister Clean Notes elegantgentlerider.com A Japanese research notebook that expands a motorcycle YouTube channel’s short videos into sourced articles about machines, engineering, gear, and rules.
Content & Blogs Twenty-One Years on One Night Elf Druid exploringazeroth.com Exploring Azeroth is Tommi Korhonen’s personal diary of Classic World of Warcraft, world PvP, battlegrounds, and the long argument over which expansion went wrong.
Content & Blogs False Springs, a Thriller You Can Enter falsesprings.com An interactive story world for a psychological thriller set in a dying farm town in 1985.
Content & Blogs Genchi Japan and the Japan that never gets translated genchijapan.com A sharply scoped guide to visiting Japan through aggregated local voices, official rules, and the unwritten etiquette around four tourist destinations.
Content & Blogs Hair Pipeline, a research register for hair regeneration hairpipeline.com A sourced, dated register tracking hair-loss and hair-regeneration programmes from early research through market development.
Content & Blogs Japanese Cutlery: A Practical Guide hamono.guide A free reference guide to Japanese kitchen knives, covering blade shapes, steels, grinds, regional makers, sharpening, buying, care, and trade-offs.
Content & Blogs Jacknora: Bogotá para trabajar jacknora.com An independent Spanish-language business-travel dossier comparing six Bogotá hotels, with filters for workspaces, internet, breakfast, reception, events, and airport access.
Content & Blogs A Firsthand Record of Handling Criminal Cases Without a Lawyer jibunde-keiji.com A Japanese-language personal account of pursuing two criminal cases and one related civil case without legal representation.
Content & Blogs La Quotidienne Dubaï, a two-minute city guide on WhatsApp laquotidiennedubai.com A free French-language daily newsletter covering Dubai events, weather, current deals, and one local discovery.
Content & Blogs Latidos Neón: a Mexican cyberpunk city with a memory problem latidosneon.com A Mexican cyberpunk manga and webtoon project set in Umbra Prime, where the reconstructed Spectra and the FÉNIX squad navigate technology, memory, and obedience.
Content & Blogs Minute Cryptic Answers, With the Why Included minutecrypticanswers.com A daily archive of Minute Cryptic clues, their answers, and the definition-and-wordplay reasoning behind each solution.
Content & Blogs Narrowmark tests invoicing software in a real tradesperson’s van narrowmark.com A ranked comparison site for UK sole-trader tradespeople, beginning with invoicing software tested by a working plumber.
Content & Blogs PrayWorks Studios — Bible in a Nutshell prayworksstudios.com An independent animation studio turns the books of the Bible into cinematic 3D episodes, interactive story pages, and planned feature films.
Content & Blogs The Romance Doctrine: Nuclear Deterrence by Cultural Admiration romancedoctrine.com Jasone Rodriguez presents a book-length theory that cultural products can make rival populations admire one another—and deepen nuclear deterrence.
Content & Blogs Slang to Scripture, in 54 translations slangtoscripture.com A daily feed that interprets viral slang through biblical verses and devotional commentary.
Content & Blogs Stripe, Mapped as a 273-Event Company History stripedex.com An independent, sourced timeline documenting Stripe’s origins, products, acquisitions, leadership, expansion, fundraising, valuations, and annual payment volume.
Content & Blogs The Collection — Melbourne Newsstand thecollectionnews.com A serialized Melbourne editorial project presented as a daily newsstand, with each issue given its own title and place on the rack.
Content & Blogs The Long Line Maps Nine Centuries of Classical Music thelongline.net An interactive timeline places composers, eras, concert programs, and playlists from 1100 to today into one navigable history of classical music.
Content & Blogs Tycho, the space briefing that skips the spectacle tycho.media A weekly briefing on the commercial, technological, and Earth-observation business of space.
Content & Blogs Unprompted: what AI recommends when nobody’s paying unprompted.report A free weekly chart tracking which Pokémon card-grading companies AI assistants recommend in response to real buying questions.
Content & Blogs Team Germany Cable Wakeboard: Beijing 2026 Press Archive wakeboardwm.com The official press site for Germany’s cable-wakeboard national team at the 2026 world championships in Beijing, collecting reports, interviews, results, livestream links, and photo media.
Content & Blogs Non-Marketing: The Commercial Reshoot Show wewouldve.com A recurring show watches a real brand commercial, then makes the better reshoot it wishes had been made.
Content & Blogs WILDCAT, a serial novel of 1970s Dubai wildcat.show James Andrew Smith’s serialized historical novel follows a Texas construction engineer arriving in Dubai in 1968, told across fourteen episodes and three acts.
Content & Blogs Hartmut Sailing: One Man, One Small Boat, One Atlantic hartmutsailing.com A 75-year-old sailor documents a solo voyage from Britain toward the Atlantic south aboard his tiny sailboat, Auntjesse.
Content & Blogs Amashusho Puts Rwanda on Screen amashusho.com A multilingual Rwandan streaming platform for live broadcasts, sport, films, concerts, conferences, and original video.
Content & Blogs The Lives Behind the Records antonydavies.wales Antony David Davies writes about rural Wales, family history, working-class life, Nonconformist culture, and Victorian society.
Content & Blogs Café puts a label on how much news you should believe cafeactus.com Café is a French-language news project that publishes video editions with every claim marked as official, credible, or still to be verified.
Content & Blogs Destination RC, a release radar for serious toy-car news destinationrc.com A focused tracker for newly announced and recently released hobby-grade RC cars, trucks, crawlers, and race kits.
Content & Blogs View Inflation Index engagedviews.com An independent measurement of how YouTube’s planned 24 August view-count change could inflate public view totals without changing creator payouts.
Content & Blogs Grimsby and Cleethorpes Museum grimsbyheritage.com A virtual museum of local history, collecting photographs, audio, ephemera, and stories from Grimsby, Cleethorpes, and Northern Lincolnshire.
Content & Blogs まとめてくらべて: The Costs After the Price Tag matometekurabete.com A Japanese comparison guide for infrequently purchased goods, including strollers and electric bicycles for carrying children.
Content & Blogs Stackmon Guide: A Field Manual for Better Stacks stackmonguide.wiki An independent field guide to Stackmon’s hidden controls, resource loops, evolution paths, route tactics, rare variants, and one-time Stacka catches.
Content & Blogs Statline Reads Between the Numbers statline.work A Korean sports-analytics publication examining what statistics capture, obscure, and accidentally imply.
Content & Blogs The Romance Doctrine theromancedoctrine.com A book-length theory arguing that cultural admiration between nuclear rivals could deepen deterrence.
Content & Blogs The Underwriting Signal underwritingsignal.com An insurance intelligence project that reads marine war-risk premiums, property stress, and rate cycles as indicators of economic and geopolitical change.
Content & Blogs Vai Com Medo Mesmo vaicommedomesmo.site A Portuguese-language collection of short pieces about disappearing partners, emotional crumbs, loneliness, and what people accept without noticing.
Content & Blogs Onley Fans, the internet's most specific cycling fan hub onley-fans.com An unofficial Oscar Onley fan site with race results, rider form, a La Vuelta stage explorer, and stage-by-stage Onley chance scores.
Content & Blogs Sandustry Base Is a Field Guide for Machines That Refuse to Cooperate sandustrybase.site An unofficial, source-aware guide to Sandustry Early Access, covering production chains, research, water systems, filters, and machine troubleshooting.
Content & Blogs How Do You Find an Illegal Image Without Looking at It? mahsayedsalem.com Mahmoud Salem’s essay explains how perceptual hashing, machine learning, and video fingerprinting help detect child-abuse material without exposing people to the imagery.
Content & Blogs Mortal Shell II, With Receipts mortalshell2guide.site An independent Mortal Shell II guide covering progression, all eight Shells, builds, weapons, quests, map fragments, and game mechanics.
Content & Blogs PlayRadio.buzz, for the Road and the Raat playradio.buzz A handpicked set of mood-based online radio stations for late nights, long drives, barbershops, and solitary listening.
Content & Blogs Renfe.lol, el muro de la vergüenza ferroviaria renfe.lol Un archivo independiente de retrasos, averías, cancelaciones, huelgas y otras incidencias de Renfe, recopiladas automáticamente con enlaces a sus fuentes.
Content & Blogs The Ox Alpha Identity File stealthmodelwatch.online An independent tracker investigates who made the anonymous Ox Alpha model, assembling verified facts, a clue timeline, tokenizer evidence, competing theories, and community tests.
Content & Blogs The Anomaly Record Keeps a Ledger of the Unidentified theanomalyrecord.com A documentary channel examining unidentified anomalous phenomena through declassified documents, sworn testimony, and institutional decisions.
Content & Blogs Hugo’s Field Guide to Europe’s Hidden Corners travelwithhugo.com A hand-curated guide to castles, UNESCO sites, museums, mountain trails, thermal spas, and other points of interest across Central and Eastern Europe.
Content & Blogs Capitol Gains Maps the Machinery of Washington capitol-gains.net A free weekday brief tracking legislation, rulemaking, enforcement, and appropriations by procedural stage and affected sector.
Content & Blogs Georgia Essentials — Travel Without the Guesswork georgiaessentials.com A practical guide to entering, paying, traveling, and communicating in Georgia as an independent visitor.
Content & Blogs Hidden Granada, with the editorial controls still showing granadacityguide.com A Granada city magazine covering local culture, food, flamenco, events, walks, radio, and places that reward staying longer than three days.
Content & Blogs Grapevine: The Week on Campus grapevineuni.news An independent student news outlet publishing weekly campus roundups, beginning with the University of Reading.
Content & Blogs Let It Out Gives Anonymous Stories a Place to Land letitoutproject.com A moderated-looking space for anonymously sharing and reading stories about relationships, heartbreak, family, secrets, and life.
Content & Blogs 流媒体指南:把“能看”与“看得好”拆开 liumeitizhan.com 一份中文流媒体观看指南,解释目录、账号、设备、画质、字幕、音轨、投屏与播放稳定性之间的关系。
Content & Blogs NFT Digest, a magazine that insists NFTs deserve a binding nftdigest.net A print-minded digital magazine covering NFT collections, custody, markets, and the question of what survives after a drop fades.
Content & Blogs Node 52, a field guide to Lineage 1's private-server world node52.net A community hub tracking Lineage 1 private servers, their populations, news, guides, and resources.
Content & Blogs OffshoreHookup.com, Where the Fish Don't Negotiate offshorehookup.com A fishing guide site covering offshore and inshore species, rig breakdowns, techniques, and gear for serious conditions.
Content & Blogs Oman Essentials, Without the Guesswork omanessentials.com A practical, self-drive travel guide covering Oman visas, money, transport, culture, camping, connectivity, and 4x4 decisions.
Content & Blogs Pooshie, the Pink Hedgehog Who Doesn’t Prick pooshieaudiobook.com A 13-chapter bedtime audiobook for ages 4–8, following a gentle pink hedgehog and his friendship with Kitty.
Content & Blogs Rajput Provinces of India rajputs.net A searchable illustrated catalog of Rajput provinces, dynasties, genealogies, heraldry, historical figures, photographs, videos, and related cultural material.
Content & Blogs 染萌, a Chinese Player Community for Blood on the Clocktower ranmeng.org A Chinese-language community for 钟楼谜团, with custom scripts, game recaps, character and rules references, and a script-making tool.
Content & Blogs The Seattle Avalanche, an Anonymous Newsroom Waiting for Its First Story seattleavalanche.online A one-person, reader-funded investigative newsroom promising slow reporting, anonymous tips, public answers, and a first investigation whose title is being withheld.
Content & Blogs Sri Lanka Essentials — Travel Without the Guesswork srilankatravelessentials.com A practical, multilingual guide to entering Sri Lanka, handling rupees and cash, navigating trains and tuk-tuks, and planning around the island’s two monsoons.
Content & Blogs Swishadelphia’s Basketball Intelligence Lab swishadelphia.com An independent Sixers and NBA site combining news, scores, scouting reports, and tools for fans who want more than headlines.
Content & Blogs Tips Health, With Receipts tips-health.com A health publication covering daily habits, medical terms, research summaries, and product reviews, with every claim linked to its underlying source.
Content & Blogs WhyUndefeated — The AI Moat & Threat Tracker whyundefeated.com An evidence-based tracker assessing whether AI and named challengers can displace major platforms including Calendly, GitHub, Etsy, and Airbnb.
Content & Blogs DC Books, a Malayalam Publishing House with an Entire Literary Ecosystem dcbooks.org DC Books presents a Malayalam publishing house, bookstore, and literary network spanning imprints, authors, translations, festivals, and online sales.
Content & Blogs TECNORED, Barcelona’s Electronic Radio tecnored.cat A Barcelona-based electronic music station broadcasting online and on 92.8 FM.
Content & Blogs Tripoli Truth Network, More or Less tripolitruthnetwork.com A fictional satirical newspaper front page built around an unofficial dispatch from Tripoli.
Content & Blogs The Executive Performance Atlas, With Receipts executiveperformanceatlas.com A research database ranking completed CEO, CFO, and operating-leader tenures by company performance against the S&P 500.
13 Personal Pages 18 cards
Personal Pages Beckerle Best Ball beckerle-best-ball.online A meticulously transcribed family golf tournament record spanning thirty-six summers, from 1990 through 2025.
Personal Pages Robert's Fridge robertgore.memorial A memorial site for librarian, photographer, and poet Robert John Charles Gore, assembled around the crowded refrigerator that held his family life, friendships, postcards, and memories.
Personal Pages The Demba Niang Family Archive dembaniang.com A carefully sourced online archive of the Demba Niang family, built from a handwritten notebook and its links to villages in Senegal’s Matam department.
Personal Pages Jack Yi’s “Aggregation” Work Portfolio jiachenjackyi.com A Chinese-English portfolio documenting Jack Yi’s work across product marketing, eSIM commercialization, market research, AI tools, and workflow design.
Personal Pages Mary Lee & Madhu — Fifty Years marymadhu.com A multimedia anniversary tribute tracing Mary Lee and Madhu’s meeting, 1976 Chicago wedding, family life, and five decades together.
Personal Pages Johannes Keegstra — Aquatic Microbial Ecology aquaticmicrobes.com A scientist’s research site about how individual bacteria move, sense, feed, and cooperate in lakes and seas.
Personal Pages Manu Guerrero’s 193-March Archive manuguerrerocompositor.com The official portfolio of Andalusian composer and musical director Manuel Jesús Guerrero Marín, documenting nearly two hundred processional compositions.
Personal Pages Mengfan He Turns Labels Into Material mengfanhe.com A portfolio of illustration, animation, book art, installation, and participatory work by visual artist Mengfan He.
Personal Pages Odd OS, a Personal Archive with Five Doors odd.phd James Allister Odd’s personal site connects investigations, musicianship research, photography, cricket writing, and music through an interactive terminal.
Personal Pages The Happiness Economist’s 800×600 Home Page robsonhmorgan.com Robson Hatsukami Morgan’s personal academic homepage combines his happiness-economics research with a deliberately retro web interface.
Personal Pages Jeremy Does Stuff: Food, Travel, Real Estate, Questionable Decisions jeremydoesstuff.com A Central Illinois personal site documenting food finds, travel experiments, real-estate projects, repairs, and other questionable decisions.
Personal Pages KK Tales, Roxette’s Tiny Film Studio kktales.com A solo studio making short custom films from memories, gifts, and quiet stories, alongside its own seven-part online soap.
Personal Pages Lulama 華’s Engineer-Artist Portfolio lulamalingela.com A portfolio spanning creative hardware, software, games, 3D work, painting, and music.
Personal Pages Shiori Sakurai’s Marimba, in Every Direction shiorisakurai.com The official multilingual site of marimba player and composer Shiori Sakurai, combining performance dates, videos, teaching information, and personal writing.
Personal Pages Daniel Hurst’s Judgment Machines and Biofeedback Experiments danielhurst.xyz A personal portfolio covering fractional AI leadership, practical AI strategy, writing, and unusual technical projects.
Personal Pages A Moving Day at 51 Chin Swee Road lifechapter.pro LifeChapter is a personal journal, opening with Priya’s account of helping a friend move boxes while sirens and a gathering crowd alter the mood of the building.
Personal Pages The Sirens at 51 Chin Swee Road storyjournal.life A personal Singapore diary entry about moving boxes, distant sirens, and a crowd gathering before anyone knows what happened.
Personal Pages Hemant Patil — Data Infrastructure That Doesn’t Lie hemantpatil.dev A Pune data engineer’s portfolio and blog about Snowflake, dbt, Matillion, data migration, and the meaning of portable metrics.
14 Local Businesses 6 cards
Local Businesses Yul Atelier Bottles Jeju’s Colors as Scent yulatelier.com A Jeju-based workshop studio that brings fragrance, color-therapy, environmental, and souvenir-making programs to schools, public institutions, welfare centers, and companies.
Local Businesses SR FARM: Every Egg Has a Paper Trail sr-imis.com An Indonesian egg farm supplying traders, stalls, and shops with seven grades of eggs and an in-house system for tracking production, stock, sales, invoices, and receivables.
Local Businesses Livré: discreet condom delivery in Amiens youpote.com A local service delivering neutral-packaged condoms across Amiens and nearby areas in roughly 30 to 45 minutes.
Local Businesses Son Passage, a Lyon studio built around the live take sonpassage-fr.click A Lyon recording studio for groups, voices, live sessions, overdubs, and mixing, with a large room and analog equipment.
Local Businesses Rimedzo Barber Shop, Sultanahmet’s Walk-In Barber rimedzobarbershop-tr.pro A long-running Istanbul barbershop offering haircuts, skin fades, beard trims, traditional shaves, and walk-in service.
Local Businesses Big Creek Alpaca Farms, Where the Appalachians Meet the Andes aspenacres.farm A North Georgia alpaca farm offering alpaca wool, local honey, Great Pyrenees puppies, guided fly-fishing access, and a private par-3 golf course.
15 Suspicious Gentlemen 14 cards
Suspicious Gentlemen A Jito Airdrop on a Gibberish .lol Domain jasdhkkaudjasd.lol A crypto airdrop page claiming to verify Solana wallet eligibility for JTO tokens and a 5 SOL prize.
Suspicious Gentlemen Slopmaker.fun, a clip farm with a cash-out button slopmaker.fun An AI video generator that recruits users to post its watermarked clips to TikTok in exchange for view-based payouts.
Suspicious Gentlemen The Free-Coffee Crypto Trap wytky.com A multilingual investigation of the Fun Coffee investment scheme, which allegedly used free coffee, promotional videos, and USDT promises to attract Hong Kong investors.
Suspicious Gentlemen Golden Quests and the Five Galleons goldenquests.com A shipwreck-salvage venture claiming to have located five Spanish Manila galleons and preparing to pursue a missing ship from Florida’s 1715 treasure fleet.
Suspicious Gentlemen The Fake Госуслуги Panic Button svo-zov-sogaz.online A Russian-language page impersonating a government-services personal account and warning visitors that their biometrics and documents may have been compromised.
Suspicious Gentlemen Overround: parlay slips for Hyperliquid markets overround.xyz A closed-beta testnet product that combines two to ten YES or NO legs from Hyperliquid outcome markets into one on-chain betting slip.
Suspicious Gentlemen The Trust Wallet Support Lookalike gettrustsupport.app A crypto-wallet support homepage presenting itself as Trust Wallet assistance, complete with tickets, live agents, recovery help, and security monitoring.
Suspicious Gentlemen The Madeira Film Festival, on a Very Different Domain kongsikongsi.org A detailed homepage for the Madeira Film Festival, a small Funchal event pairing independent cinema with the island’s Laurisilva forest.
Suspicious Gentlemen The Parfums de Marly Storefront That Raises an Eyebrow parfumsdemarlyfragrance.com A polished-looking online fragrance shop presenting itself as the official U.S. store for Parfums de Marly.
Suspicious Gentlemen AI小白客服: The Pinduoduo Shopkeeper’s Night Shift aix8.top A Windows desktop AI agent that answers buyer messages for Pinduoduo merchants, learns product catalogs, tracks follow-ups, and escalates difficult conversations.
Suspicious Gentlemen FanLine and the arithmetic of the private fan line fanlinehq.com FanLine offers creators on OnlyFans or Fansly a paid WhatsApp channel with subscriptions, content unlocks, and chat-based upsells.
Suspicious Gentlemen The Island, Where Singles Become Markets theisland.lol A gamified dating-market dashboard ranks singles across 101 American city markets by what someone will pay to meet the person at #1.
Suspicious Gentlemen Bodycam Files, an Archive With a Trust Problem bodycamfiles.com A public-records archive of police body-camera footage organized by incident type, with an 18+ warning and a distinctly sensational presentation.
Suspicious Gentlemen GYEOL LAB and the Mystery of whycft.com whycft.com A Korean-language nonprofit learning community offering a six-week, free curriculum for reading and evaluating Korean market data.

Landing page observed 2026-08-22. The builder may have changed it since capture.